Asphalt Material Sample Clauses

Asphalt Material. Use only emulsified asphalt, unless otherwise stated in the plans and allowed by Chapter 17-2 of the Rules and Regulations of the Department of Environmental Protection. Store and handle asphalt materials and components so as to minimize unnecessary release of hydrocarbon vapors.
AutoNDA by SimpleDocs
Asphalt Material. Use only emulsified asphalt, unless otherwise stated in the Plans and allowed by Chapter 62-210 Rules of the Department of Environmental Protection, Florida Administrative Code. Store and handle asphalt materials and components so as to minimize unnecessary release of hydrocarbon vapors.
Asphalt Material. The Engineer will measure asphalt materials by the ton. Payment for "Emulsified Asphalt" and "Cutback Asphalt", at the contract unit prices is full compensation for the specified work.
Asphalt Material. Unless otherwise shown on the plans, asphalt material will be measured by one of the following methods:
Asphalt Material. The asphalt binder material shall conform to the requirements of Subsection 904.01 for grade 64-22, unless otherwise directed. The prime coat shall be a cutback asphalt grade MC-30 or MC-70 conforming to Subsection 904.02. Anti-Stripping Agent. Anti-stripping agent when used shall be heat stable and conform to AASHTO R15. Composition of the Mixture. The mixture shall consist of asphalt binder and aggregate conforming to the following gradation requirements: PRODUCTION TOLERANCE FROM JMF SIEVE SIZE JMF WIDE BAND ALLOWABLE PERCENT PASSING + 0.0 1” 100 + 6.0 ¾” 95 - 100 + 5.5 ½ “ 85 - 100 + 5.5 3/8” 60 - 90 + 5.5 No. 4 15 - 25 + 4.5 No. 8 2 - 10 + 2.0 No. 200 2 - 5 The design asphalt binder content shall be 3 plus or minus 1/2 percent by weight of dry aggregate and mineral filler.
Asphalt Material. A. Asphalt Binder: AASHTO M 320, PG 58-28 SECTION 02741 ASPHALT PAVING B. Asphalt Cement: ASTM D 3381/D 3381M for viscosity-graded; ASTM D 946/D 946M for penetration-graded material.

Related to Asphalt Material

  • Recycled Materials Xxxxxxx County encourages the use of products made of recycled materials and shall give preference in purchasing to products made of recycled materials if the products meet applicable specifications as to quantity and quality. Xxxxxxx County will be the sole judge in determining product preference application.

  • Services, Materials, and Equipment Unless otherwise specified, the Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities, incidentals, and services necessary for the construction, performance, testing, start-up, inspection and completion of the Work.

  • Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except:

  • Quality of Materials and Workmanship The Contractor shall ensure that the Construction, Materials and workmanship are in accordance with the requirements specified in this Agreement, Specifications and Standards and Good Industry Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.