Brief description of amendments Sample Clauses

Brief description of amendments. The amendments change the Technical Date of issuance: November 12, 1996 Effective date: Immediately, to be implemented within 30 days. A mendment Nos.: 175 and 162 Facility Operating License Nos. DPR- 39 and DPR-48: The amendments Local Public Document Room location: Waukegan Public Library, 128 Date of application for amendment: Brief description of amendment: The amendment revises the technical Date of issuance: November 7, 1996 Effective date: November 7, 1996 A mendment No.: 175 Facility Operating License No. DPR- Local Public Document Room location: Xxx Xxxxx Library, Hope College, Holland, Michigan 49423 Date of application for amendments: December 14, 1994, as supplemented by letters dated May 16 and August 29, Brief description of amendments: The amendments will incorporate guidance and recommendations for diesel A mendment Nos.: 170 and 152 Facility Operating License Nos. NPF- 9 and NPF-17: Amendments revised the Technical Specifications. Local Public Document Room location: Xxxxxx Library, University of North Carolina, Charlotte (UNCC Station), North Carolina 28223 Date of amendment request: August 1, 1996 Brief description of amendment: The amendment revises the technical Date of issuance: November 12, 1996 Effective date: November 12, 1996 A mendment No.: 89
AutoNDA by SimpleDocs
Brief description of amendments. The proposed amendments would change the Comanche Peak Steam Electric Station (CPSES) Technical Specification (TS) as follows: (1) Revise TS 3.8.3 (Condition B and Surveillance Requirement (SR)
Brief description of amendments. The amendments revised the emergency plans for each facility by changing the emergency action level schemes. The changes are based on the Nuclear Energy Institute’s (NEI’s) guidance in NEI 99–01, Revision 6, ‘‘Development of Emergency Action Levels for Non- Passive Reactors,’’ which was endorsed by the NRC by letter dated March 28, 2013 (XXXXX Package Accession No. ML13091A209). Effective date: As of the date of issuance and shall be implemented on or before June 28, 2019. Amendment Nos.: Xxxxxxx Cliffs—324/ 302; Nine Mile Point—230/171; and, Ginna—128. A publicly-available version is in XXXXX under Accession No. ML18137A614; documents related to these amendments are listed in the Facility Operating License Nos. DPR– 53, DPR–69, DPR–63, NPF–69, and DPR–18: Amendments revised the emergency plans. No significant hazards consideration comments received: No. Exelon Generation Company, LLC, Docket Nos. 50–237 and 50–249, Dresden Nuclear Power Station (DNPS), Unit Nos. 2 and 3, Grundy County, Illinois Date of amendment request: May 3, 2017, as supplemented by letter dated February 14, 2018. Brief description of amendments: The amendments revised the DNPS Technical Specification (TS) 5.5.12, ‘‘Primary Containment Leakage Rate Testing Program,’’ to allow for the permanent extension of the Type A integrated leak rate testing and the Type C leak rate testing frequencies. Amendment Nos.: 257 (Unit 2) and Renewed Facility Operating License Nos. DPR–19 and DPR–25: Amendments revised the Renewed Facility Operating Licenses and TS. No significant hazards consideration comments received: No. Exelon Generation Company, LLC, Docket No. 50–244, R. E. Xxxxx Nuclear Power Plant (Ginna), Xxxxx County, New York Date of amendment request: June 30, 2017, as supplemented by letters dated October 25, 2017, and June 5, 2018.
Brief description of amendments. The amendments revised the Technical Specification (TS) requirements on control and shutdown rods, and rod and bank position indication in the Units 1 and 2, TS 3.1.5, ‘‘Rod Group Alignment Limits,’’ TS 3.1.6, ‘‘Shutdown Bank Insertion Limits,’’ TS 3.1.7, ‘‘Control Bank Insertion Limits,’’ and TS 3.1.8, ‘‘Rod Position Indication.’’ Date of issuance: June 26, 2018.
Brief description of amendments. The proposed amendments would change the Sequoyah (SQN) Operating Licenses DPR–77 (Unit 1) and DPR–79 (Unit 2) by modifying License Provision Statement 2.B.(5), in conjunction with an exemption to 10 CFR 50.54(ee), to allow temporary storage of low-level radioactive waste generated at the Xxxxx Bar Nuclear Plant (WBN) at the SQN plant site. Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
Brief description of amendments. The amendments revise the Technical Specifications to extend the completion time for one inoperable low pressure safety injection subsystem from 72 hours to 7 days. These amendments provide partial response to the licensee’s application for amendments. The remaining request will be addressed under separate correspondence. Date of issuance: February 1, 2000. Effective date: February 1, 2000, to be implemented within 45 days.
Brief description of amendments. The amendments would modify the Xxxxxxx Date of issuance: February 3, 2000. Effective date: As of the date of issuance to be implemented within 30 days. Amendment Nos.: 233 and 209. Facility Operating License Nos. DPR– 53 and DPR–69: Amendments revised the Technical Specifications. Carolina Power & Light Company, et al., Docket No. 50–400, Xxxxxxx Xxxxxx Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North Carolina Date of application for amendment:
AutoNDA by SimpleDocs
Brief description of amendments. The amendments revised Technical Specification Definition 1.9, ‘‘Core Alterations,’’ to explicitly define core alterations as the movement of any fuel, sources, or reactivity control components within the reactor vessel with the vessel head removed and fuel in the vessel. Date of issuance: February 1, 2000. Effective date: February 1, 2000, to be implemented within 30 days. Amendment Nos.: Unit 1–123; Unit 2–111. Facility Operating License Nos. NPF– 76 and NPF–80: The amendments revised the Technical Specifications. Tennessee Valley Authority, Docket Nos. 50–327 and 50–328, Sequoyah Nuclear Plant, Units 1 and 2, Hamilton County, Tennessee Date of application for amendments: Brief description of amendments: These amendments revise Technical Specification Section 3.9.4.c, ‘‘Containment Building Penetrations,’’ and the associated bases to allow use of administrative controls to unisolate certain containment penetrations during refueling operations. Date of issuance: February 11, 2000. Effective date: As of date of issuance to be implemented no later than 45 days after issuance. Amendment Nos.: 249 and 240. Facility Operating License Nos. DPR– 77 and DPR–79: Amendments revise the technical specifications. Wisconsin Electric Power Company, Docket Nos. 50–266 and 50–301, Point Beach Nuclear Plant, Units 1 and 2, Town of Two Creeks, Manitowoc County, Wisconsin Date of application for amendments:
Brief description of amendments. The amendments reflect changes to the Technical Specifications in order to incorporate the Westinghouse 422V+ fuel assemblies into the reactor cores. Date of issuance: February 8, 2000. Effective date: As of the date of issuance and shall be implemented within 45 days. Amendment Nos.: 193 and 198.
Brief description of amendments. The amendments revised the technical specifications to relocate to licensee- controlled documents; select acceptance criteria specified in TS surveillance requirements credited for satisfying the Inservice Testing (IST) Program and Inservice Inspection Program requirements; to delete the SRs for the ASME Code Class 1, 2, and 3 components; to replace references to the Surveillance Frequency Control Program with reference to the Turkey Point IST Program where appropriate; to establish a Reactor Coolant Pump Flywheel Inspection Program; and to make related editorial changes. Amendment Nos.: 281 and 275. A publicly-available version is in XXXXX under Accession No. ML18130A466; documents related to these amendments are listed in the Safety Evaluation enclosed with the amendments. Renewed Facility Operating License Nos. DPR–31 and DPR–41: The amendments revised the Renewed Facility Operating Licenses and Technical Specifications. No significant hazards consideration comments received: No. NextEra Energy Xxxxx Xxxxxx, LLC, Docket No. 50–331, Xxxxx Xxxxxx Energy Center (DAEC), Linn County, Iowa Date of amendment request: June 9, 2017, as supplemented by letters dated November 1, 2017, February 8, 2018,
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!