BUILDING ASSESSMENT Clause Samples

BUILDING ASSESSMENT. This phase outlines the framework for conducting an existing building assessment. This assessment aims to evaluate the physical condition, functionality, and compliance of existing structures, providing an understanding of the buildings’ performance and informing future renovation or maintenance decisions. • Assess the current condition of the building, including structural integrity, systems performance, and architectural features. • Identify deficiencies, safety hazards, and areas requiring maintenance or upgrade. • Evaluate compliance with applicable building codes and regulations. • Provide recommendations for improvements or modifications based on the assessment results. • Conduct a visual onsite inspection of the building’s exterior and interior, including structural elements, finishes, HVAC systems, plumbing, electrical systems, data/cabling infrastructure, and safety features. • Gather and review all available relevant documentation including original architectural plans, maintenance records, and compliance documentation. • Assess the current condition of various building components, categorizing findings based on severity and urgency of repairs needed. • Compile a detailed report summarizing assessment findings, including photographic documentation, descriptions of issues, and recommendations. Assess the environmental characteristics of the existing facility and determine any areas for remediation. Specifically targeting the plumbing and sumps within the former lab spaces, the building air exhaust system, and the existing rooms formerly used to store hazardous materials. Design services shall be conducted in phases as outlined herein. Phases may be combined to expedite design process when defined in Exhibit CProduction Schedule. Individual phases or groups of phases shall be authorized herein or by fully executed Supplemental Agreement.
BUILDING ASSESSMENT i. Assess existing architectural conditions of identified structures to determine the extent of work that needs to be performed. ii. Prepare narrative reports that reference applicable technical and/or practical standards, with pictures and cost estimates to establish renovation budgets.

Related to BUILDING ASSESSMENT

  • Environmental Assessment Buyer shall have the right for a period commencing upon execution of this Agreement by both parties and ending on November 28, 2012, to conduct an environmental assessment of the Assets, at Buyer’s sole risk, liability and expense. Seller shall make available to Buyer, during the environmental assessment period described above, Seller’s historical files regarding prior operations on the Assets, and provide Buyer and its representatives with reasonable access to the Assets to conduct the environmental assessment. Buyer shall provide Seller three (3) days prior written notice of a desired date(s) for such assessment and Seller shall have the right to be present during any assessment and, if any testing is conducted pursuant to Seller’s express prior written consent, Seller may require splitting of all samples. Notwithstanding any other provision of this Agreement to the contrary, Buyer shall not have the right to drill any test, monitor or other ▇▇▇▇▇ or to extract samples of any air, soil, water or other substance from the Assets without Seller’s express prior written consent. If Buyer proposes a reasonable request to drill a test well or extract a sample pursuant to a systematic and customary procedure for the assessment of the environmental condition of the Assets and Seller refuses to grant its consent to such a well or sampling, then Buyer shall have the right, for a period of seventy-two (72) hours following notification of Seller’s refusal to consent, to deliver written notice to Seller of Buyer’s election to exclude from this transaction the portion of the Assets affected by such proposed test well or sample, and the Purchase Price shall be adjusted accordingly by the Allocated Value of such portion of the Assets so excluded. Under no circumstances whatsoever shall Seller ever be obligated to grant its consent to any such test ▇▇▇▇▇ or sampling proposed by Buyer, and Buyer’s sole and exclusive remedy for any refusal by Seller to grant its consent shall be the limited right contained in the preceding sentence to exclude the affected Assets from the transactions contemplated by this Agreement. If Buyer fails to exercise the right to exclude such Assets by written notice to Seller delivered prior to the expiration of the seventy-two hour period described above, then Buyer shall be conclusively deemed to have waived such right and shall be obligated to purchase the affected Assets without conducting such testing or sampling or any adjustment of the Purchase Price unless otherwise provided in this Agreement.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Premises Building Project and Common Areas 1.1 Premises, Building, Project and Common Areas.

  • Environmental Assessments Foreclose on or take a deed or title to any commercial real estate without first conducting a Phase I environmental assessment of the property or foreclose on any commercial real estate if such environmental assessment indicates the presence of a Hazardous Substance in amounts which, if such foreclosure were to occur, would be material.

  • Needs Assessment 1. The Contractor shall conduct a cultural and linguistic group-needs assessment of the eligible client population in the Contractor’s service area to assess the language needs of the population and determine what reasonable steps are necessary to ensure meaningful access to services and activities to eligible individuals. [22 CCR 98310, 98314] The group-needs assessment shall take into account the following four (4) factors: a. Number or proportion of persons with Limited English Proficiency (LEP) eligible to be served or encountered by the program. b. Frequency with which LEP individuals come in contact with the program. c. Nature and importance of the services provided. d. Local or frequently used resources available to the Contractor. This group-needs assessment will serve as the basis for the Contractor’s determination of “reasonable steps” and provide documentary evidence of compliance with Cal. Gov. Code § 11135 et seq.; 2 CCR 11140, 2 CCR 11200 et seq., and 22 CCR98300 et seq. 2. The Contractor shall prepare and make available a report of the findings of the group-needs assessment that summarizes: a. Methodologies used. b. The linguistic and cultural needs of non-English speaking or LEP groups. c. Services proposed to address the needs identified and a timeline for implementation. [22 CCR 98310] 3. The Contractor shall maintain a record of the group-needs assessment on file at the Contractor’s headquarters at all times during the term of this Agreement. [22 CCR 98310, 98313]