Extent of Work. Installation on the Internet is limited to the uploading of all necessary files to the Host, and testing of functionality. No registration of the Website with Search Engines will be undertaken unless otherwise agreed with the Client.
Extent of Work. 15.1 The work shall comprises of entire labour including supervision and all material necessary to make a complete installation and such tests and adjustment and commissioning as may be required by the department. The term complete installation shall not only mean major items of the plant and equipments covered by the specification but all incidental sundry components necessary for complete execution and satisfactory performance of installation with all layout charts whether or not those have been mentioned in details in the tender documents in connection with this contract as this is a turnkey job.
15.2 In addition to supply, installation, testing and commissioning of FAS/ AFAS including intelligent addressable FAS equipments, following works shall be deemed to be included with the scope of work to be executed by the tenderer as this is a turnkey job-
(a) Minor building works necessary for installation of equipments, foundation making of opening in walls or in floors and restoring them to their original condition / finish and necessary grouting etc.. as required.
(b) All supports for cable and MS Channel for erection as are necessary.
(c) Getting CFO inspection done and obtaining clearance.
Extent of Work. The tenderer will: Carry out detailed site surveys with facilities manager and technical representatives, this will establish current occupancy and future requirements that may affect the proposed power optimisation systems, backup systems in place such as site generators and uninterruptible power supplies Analyse half-hourly data and confirm technical data provided for each site Confirm maximum kVA load (The tenderer’s proposed technology should be matched to the capacity of the supply transformer) Produce method statements and risk assessments and install data logging devices for agreed period to collect site power data, if power site data is required Remove data loggers from sites and analyse power data collected Liaise with Regional Electricity Company (REC) and/or the Establishment Site Liaison to establish the site shutdown criteria, permit to work procedure and authorised person for switching the HV network Attend meetings as required by the Establishment Site Liaison to report findings on progress Produce an outline design proposal showing the installation and location of equipment and highlighting any required temporary works (e.g. temporary Standby Generators) and proposed shutdowns and draft method statements and risk assessments Produce a draft project programme for the Works indicating timescales/lead times Propose a 3 Phase voltage reduction equipment at the entry of the low voltage supply point to the establishment. Remove all panels as required to install Test system at area designated in the scope of works. Commission system Re-install any panels that were removed for installation Make good any damage Clean away any debris and remove from site On completion provide certification of system Provide Site manager with O&M manuals Develop a training programme and provide suitable technical training for the Establishment’s Works Staff.
Extent of Work. A. Provide all labor, material, tools, equipment, and supervision necessary to complete the installation of the Sure-Weld 45-mil, 60-mil, or 80-mil thick white, gray or tan reinforced TPO (Thermoplastic Polyolefin) reinforced membrane Adhered Roofing System including flashings and insulation as specified herein and as indicated on the drawings in accordance with the manufacturer's most current specifications and details.
B. The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work.
C. The roofing contractor shall confirm all given information and advise the building owner, prior to bid, of any conflicts that will affect their cost proposal.
D. Any contractor who intends to submit a bid using a roofing system other than the approved manufacturer must submit for pre-qualification in writing fourteen (14) days prior to the bid date. Any contractor who fails to submit all information as requested will be subject to rejection. Bids stating “as per plans and specs” will be unacceptable.
Extent of Work. Generally, the work will comprise of the cutting of grass and foliage on land within the parish of XXXXXX POPPLEFORD AND HARPFORD. The height of cut to be agreed with the Parish Clerk. To also include strimming around play equipment, cemetery headstones and monuments, outside furniture including picnic tables, trees, bushes, fences, xxxxxx and all other authorised site fixtures and fittings. To include grass removal from all play safety surfaces and footpaths by sweeping or blower as directed. Selective weed control will be by separate negotiation if and when required as Council has a policy not to use such products unless absolutely necessary. Although a set number off cuts has been set for the tender, these may be varied according to seasonal grass growth and by agreement with the Parish Clerk.
Extent of Work. Generally, the work will comprise of the cutting of grass and foliage on land within the parish of XXXXXX POPPLEFORD AND HARPFORD. The height of cut to be agreed with the Parish Clerk. To also include strimming around play equipment, cemetery headstones and monuments, outside furniture, trees, bushes, fences, xxxxxx and all other authorised site fixtures and fittings. To include grass removal from all play safety surfaces and footpaths by sweeping or blower as directed. Selective weed control will be by separate negotiation if and when required. Although a set number off cuts has been set for the tender, these may be varied according to seasonal grass growth and by agreement with the Parish Clerk.
Extent of Work. (a) This work shall consist of furnishing of all labour, material, equipment and all incidentals required for the new South End Snow Dump and all associated works.
(b) Work shall include, but not be limited to:
(i) Provision of new electrical system as required.
(ii) Wire to and make connections to, all electrical equipment required, including panels, lights, receptacles, etc.
Extent of Work. The 60% Construction Documents shall completely define the entire project from a construction viewpoint even though all the construction details are not fully developed.
Extent of Work. The Expression of interest (EOI) is for participation of interested companies/agencies for Exclusive Licensing Agreement to Manufacture and Supply of Equipment/Gadgets/ Technologies developed by MoFPI – IIFPT with the scope of work as listed:
Extent of Work. The extent of work covered by this specification includes the, design, manufacture, works testing and delivery of a complete operating system as specified. In addition, twelve( 12) months warranty must be provided. Three (3) hour full load factory witness test (fuel for same to be provided by tenderer). Additionally, the provision of all handbooks, workshop manuals, drawings and circuit diagrams.