– Building D Restroom (Multi Sample Clauses

– Building D Restroom (Multi. User): The project includes the renovation of Building D Restrooms 113, 114, 213 and 214 (areas indicated below) to make them access compliant. The project scope includes removal and replacement of all finishes, fixtures and flooring. It is anticipated that the restrooms will require partial demolition including finishes and minor framing removal in order to be accessible by persons with disabilities. The existing mechanical, electrical, and plumbing should be brought up to current code as needed. The renovation shall not be designed to code minimums and will allow for construction tolerances to achieve fully code compliance and accessibility. An overall fixture count and analysis will be required to determine the required number of fixtures to be provided. First Floor Area of Work: Second Floor Area of Work:
AutoNDA by SimpleDocs

Related to – Building D Restroom (Multi

  • PRINCIPAL BUILDING AGREEMENT DEFINITIONS Definitions and interpretation (Clause 1). 1 F: ……….… V: ….……… T: ….……... Item

  • Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Definition of Building Where Lift Required 1.1 A passenger/materials lift shall be provided on a building which shall, when complete, consist of more than six (6) storey levels excluding the roof, parapets and basement levels (if any), but including the ground floor. (Refer to Sub Clause 2.1 herein.)

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Building Maintenance The host facility provider shall maintain (in a state of good repair) all buildings used for the educational program. All damages made by the AGENCY’s program will be the responsibility of the AGENCY to repair.

  • Building Access i. Access to Secured buildings: Contractor will work through the GIT Contract administrator for access to the building.

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.