Calibrate model for Fiscal Impact Analysis Sample Clauses

Calibrate model for Fiscal Impact Analysis. ECO will customize the Envision Fiscal Impact Tool to calibrate it to Bend and to evaluate fiscal impacts of growth scenarios on the City of Bend. Working with the City team and Finance Director, we will integrate information from Bend’s utility rates, property assessment, tax revenues, and short and long term financial plans. Federal data sources on fiscal impact metrics will be reviewed as needed. The customized tool will produce a ratio of total revenues and total costs for scenarios being evaluated, to help identify which scenarios are most cost effective to accommodate growth. Infrastructure costs will be provided by the City, consistent with Public Facility Plans – this task will ensure the FIT calibration is coordinated with the PFPs. The FIT model is expected to be used primarily in Phase 2 – this subtask will accomplish the up-front calibration so the tool is tested and ready. Information from the HNA, EOA, and/or input from local developers in Task 5, will be used adjust the cost and rent/sales information within the Envision Model to match local conditions.
AutoNDA by SimpleDocs

Related to Calibrate model for Fiscal Impact Analysis

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • Testing/Trouble Reporting 1.15.1 TWTC will be responsible for testing and isolating troubles on Network Elements. TWTC must test and isolate trouble to the AT&T network before reporting the trouble to the Network Elements Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from AT&T at the time of the trouble report, TWTC will be required to provide the results of the TWTC test which indicate a problem on the AT&T network. Version: 4Q06 Standard ICA 11/30/06

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • LIS Forecasting 7.2.2.8.1 Both CLEC and Qwest shall work in good faith to define a mutually agreed upon forecast of LIS trunking.

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

Time is Money Join Law Insider Premium to draft better contracts faster.