DNS name server availability Refers to the ability of a public-‐DNS registered “IP address” of a particular name server listed as authoritative for a domain name, to answer DNS queries from an Internet user. All the public DNS-‐registered “IP address” of all name servers of the domain name being monitored shall be tested individually. If 51% or more of the DNS testing probes get undefined/unanswered results from “DNS tests” to a name server “IP address” during a given time, the name server “IP address” will be considered unavailable.
COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.
Directory Listing and Directory Distribution 41 5. Voice Information Service Traffic 43 6. Intercept and Referral Announcements 44 7. Originating Line Number Screening (OLNS) 44 8. Operations Support Systems (OSS) Services 44 9. Poles, Ducts, Conduits and Xxxxxx-xx-Xxx 00 00. Telephone Numbers 51 11. Routing for Operator Services and Directory Assistance Traffic 51 12. Unauthorized Carrier Change Charges 52 13. Good Faith Performance 52 INTERCONNECTION ATTACHMENT. 53 1. General 53 2. Points of Interconnection and Trunk Types 53 3. Alternative Interconnection Arrangements 57 4. Initiating Interconnection 58 5. Transmission and Routing of Telephone Exchange Service Traffic 59
TREE TRIMMING Grantee or its designee shall have the authority to trim trees on public property at its own expense as may be necessary to protect its wires and facilities.
WASHINGTON’S STATEWIDE PAYEE DESK Contractor represents and warrants that Contractor is registered with Washington’s Statewide Payee Desk, which registration is a condition to payment.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Estimated Number of Participating Households Approximately 6,460. This figure is based on loans with unpaid principal balances ranging from $200,000 to $400,000 with an average funding of $5,000.00.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Transfer and Seniority Outside the Bargaining Unit (a) It is understood that an employee shall not be transferred by the Hospital to a position outside the bargaining unit without his consent except in the case of temporary assignments not exceeding six (6) months. Such employees on temporary assignments shall remain members of the bargaining unit. (b) An employee who is transferred to a position outside the bargaining unit shall not, subject to (c) below, accumulate seniority. In the event the employee is returned by the Hospital to a position in the bargaining unit within twenty-four (24) months of the transfer he or she shall be credited with the seniority held at the time of transfer and resume accumulation from the date of his or her return to the bargaining unit. An employee not returned to the bargaining unit within 24 months shall forfeit bargaining unit seniority. (c) In the event an employee transferred out of the bargaining unit under (b) above is returned to the bargaining unit within a period of six (6) calendar months, he shall accumulate seniority during the period of time outside the bargaining unit."