Shift Change Where employees are assigned mid-week to work a non-day shift (whether due to emergencies or a shift change) and as a result lose a shift in the regular work week, such employees will be paid six (6) hours for such loss of earnings.
Major Workplace Change 11.1 If the Employer has made a decision to introduce a major workplace change that is likely to have a Significant Effect on a number of Employees, the Employer must notify the Employee(s) who will be affected by the decision .As soon as practicable and prior to implementation, the Employer must discuss with the relevant Employees and/or their nominated representative/s (e.g. Union or other representative) the introduction of the change; and the effect the change is likely to have on the Employees. The Employer must discuss measures to avert or mitigate the adverse effect of the change on the Employees. 11.2 For the purposes of the discussion the Employer will provide the relevant Employees and/or their nominated representative/s in writing: (a) All relevant information about the change including the nature of the change proposed; (b) Information about the expected effects of the change on the Employees; and (c) Any other matters likely to affect the Employees. However, the Employer is not required to disclose confidential or commercially sensitive information. The Employer must give prompt and genuine consideration to matters raised about the major change by the relevant Employees.
Change Control Procedure 34.1 In the event that either Party desires any change the terms of this Agreement or any Contract which may materially impact on the timings, scope, Specification or Charges of the Goods or Services, or the scope of either parties’ obligations under this Agreement or the relevant Contract, or which the relevant Party otherwise reasonably determines warrants the use of this change control procedure, the following procedures will apply: (a) the Party requesting the change will deliver a “Change Request” (in the form (or substantially in the same form) contained in Schedule 5 to this Agreement) which describes: (i) the nature of the change; (ii) the reason for the change; (iii) the effect that the requested change will have on the scope or Specification for the Goods or Services; and (iv) any change to the Charges and the Term. (b) Upon receipt of a Change Request, the receiving Party’s authorised representative will contact his/ her counterpart within 5 working days to discuss and agree the Change Request. The parties will negotiate the proposed changes to the Agreement and/or affected Contract in good faith and agree a timeline in which to finalise the Change Notice. (c) Neither party is obliged to agree to a Change Request, but if the parties do agree to implement such a Change Request, the appropriate authorised representatives of both parties will sign the Change Request which will be effective from the date set out in the Change Request. (d) If there is any conflict between the terms and conditions set out in the Agreement or any Contract and the Change Request, then the terms and conditions set out in the most recent fully executed Change Request will apply. (e) The Supplier shall neither be relieved of its obligations to supply the Goods and/or Services in accordance with the terms and conditions of this Agreement or any Contract, nor be entitled to an increase in the Charges as the result of: (i) a General Change in Law; or (ii) a Specific Change in Law where the effect of that Specific Change in Law on the Goods and/or Services is reasonably foreseeable at the Commencement Date of this Agreement, or, where the Change Request relates to a Contract, the applicable Contract Commencement Date. 34.2 The Parties agree that any variations to the Agreement or any Contract to reflect non- material changes (including for example a change to the name/contact details of a Party’s representative) may be agreed in writing and shall not be required to be made in accordance with the procedure in this clause 34, provided always that UKRI shall, in their absolute discretion, decide whether a proposed change is non-material for these purposes.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Control Data <<customer_name>> will send one confirmation record per pack that is received from BellSouth. This confirmation record will indicate <<customer_name>> received the pack and the acceptance or rejection of the pack. Pack Status Code(s) will be populated using standard ATIS EMI error codes for packs that were rejected by <<customer_name>> for reasons stated in the above section.
Climate Change 1. The Parties recognize that the climate change and its adverse effects are a common concern. In that sense, and under their international commitments, the Parties agree to promote joint measures to limit or reduce the adverse effects of the climate change. 2. For promoting sustainable development, each Party, within its own capacities, shall adopt policies and measures on issues such as: (a) improvement of energy efficiency; (b) research, promotion, development and use of new and renewable energy, technologies of carbon dioxide capture, and updated and innovative environmental technologies that do not affect food security or the conservation of biological diversity; and (c) measures for evaluating the vulnerability and adaptation to climate change.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Change Control All systems processing and/or storing PHI COUNTY discloses to 14 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 15 must have a documented change control procedure that ensures separation of duties and protects the 16 confidentiality, integrity and availability of data.
Workplace adjustment An employer wishing to employ a person under the provisions of this clause shall take reasonable steps to make changes in the workplace to enhance the employee’s capacity to do the job. Changes may involve re-design of job duties, working time arrangements and work organisation in consultation with other employees in the area.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.