Conceptual Model Formation Sample Clauses

Conceptual Model Formation. Information gathered during the problem formulation provided a base for constructing the conceptual model. First, we divided the Port into eleven separate sub-areas (Table 2-1, Figure 2-1). Analysis of smaller areas within a region maximizes the chance of detecting effects from an anthropogenic input. We then selected categories for each of the regional risk components: sources, habitats, and impacts (Tables 2-2, 2-3, and 2-4). Source and habitat categories described anthropogenic and ecological components of the Port (Figure 2-2 and 2-3) whereas impact categories incorporated the assessment endpoints. Other categories can be nested into these primary categories. In this way all potential stressors, receptors, and receptor responses in the Port are included in the assessment. For instance, accidental spills are a source category that releases hydrocarbons and other stressors. Hydrocarbons include both alkanes and aromatic compounds. Aromatics can be further broken down into the monoaromatics and the polyaromatics, which in turn are made up of a numerous individual chemicals (e.g., benzo[a]pyrene, fluorene, and phenanthrene). Likewise, hydrocarbons represent a number of mixtures released into the environment. Crude oil, gasoline, diesel, kerosene, and jet fuel are all materials that contain an individual array of hydrocarbons, along with many other non- hydrocarbon constituents. Receptors in the environment are also numerous as demonstrated by the number of species found in the Port (Appendix B). For the model we placed receptors into general groups and identified the predominant habitat types in which they are found. Once these component categories were established, we explored links between the components. In traditional risk assessment, where one or only a few stressors, are involved the exposure pathway links the stressor to receptors. However, in a regional multiple stressor assessment the stressors can also be linked to sources, and the receptors to habitats (described in Section 1.2). Table 2-1. Location of each sub-area chosen for the conceptual model.
AutoNDA by SimpleDocs

Related to Conceptual Model Formation

  • Improvement Plan A written plan developed by the evaluator, utilized when a teacher received a Rating of Ineffective on his/her Evaluation or on any individual deficiency in the evaluation system.

  • Improvement Plans a. An improvement plan is a clearly articulated assistance program for a teacher/counselor/SLP whose overall summative rating is ineffective.

  • Development Schedule The Project shall substantially comply with the specific timetables and triggers for action set forth in Article 5 of this Agreement. The parties acknowledge that, as provided in G.S. 160A-400.25(b), the failure to meet a commencement or completion date shall not, in and of itself, constitute a material breach of this Agreement pursuant to G.S. 160A-400.27 but must be judged based upon the totality of the circumstances.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Project Implementation 2. The Borrower shall:

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Construction Plans Tenant shall prepare final plans and specifications for the Tenant Improvements that (a) are consistent with and are logical evolutions of the Approved Schematic Plans and (b) incorporate any other Tenant-requested (and Landlord-approved) Changes (as defined below). As soon as such final plans and specifications ("Construction Plans") are completed, Tenant shall deliver the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld, conditioned or delayed. All such Construction Plans shall be submitted by Tenant to Landlord in electronic .pdf, CADD and full-size hard copy formats, and shall be approved or disapproved by Landlord within ten (10) business days after delivery to Landlord. Landlord's failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If the Construction Plans are disapproved by Landlord, then Landlord shall notify Tenant in writing of its objections to such Construction Plans, and the parties shall confer and negotiate in good faith to reach agreement on the Construction Plans. Promptly after the Construction Plans are approved by Landlord and Tenant, two (2) copies of such Construction Plans shall be initialed and dated by Landlord and Tenant, and Tenant shall promptly submit such Construction Plans to all appropriate Governmental Authorities for approval. The Construction Plans so approved, and all change orders approved (to the extent required) by Landlord, are referred to herein as the "Approved Plans."

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • Development Plans 4.3.1 For each Licensed Indication and corresponding Licensed Product in the Field, Licensee will prepare and deliver to Licensor a development plan and budget (each a “Development Plan”). The initial Development Plans for each Licensed Indication will be delivered within […***…] after the Grant Date for such Licensed Indication.

Time is Money Join Law Insider Premium to draft better contracts faster.