Construction and Management Sample Clauses

Construction and Management. No Owner shall do or permit or suffer to be done any act, deed, matter or thing which in any way interferes with or affects or which is likely to interfere with or affect the construction of any part of the Land and the Building at any time in the course of construction and/or the management and the maintenance of the Land and the Building or any part or parts thereof.
AutoNDA by SimpleDocs
Construction and Management. The General Partner, or other affiliate of AHFC, may serve as general contractor for the construction of the Development. subcontractor for the Development. will serve as the prime It is anticipated that will manage the Development and will have responsibility for the day-to-day management and operation, record keeping, and maintenance and upkeep of the Development. Any management entity other than
Construction and Management. 2.1.1 Tenant shall achieve Substantial Completion of the Project on or before June 30, 2020, subject to Force Majeure Delays. “Force Majeure Delays” means if Tenant (or contractor working on Tenant’s behalf) is delayed or hindered at any time in the progress of achieving Substantial Completion by causes which could not have been reasonably anticipated by Tenant and which are beyond the reasonable control Tenant (or Tenant’s contractor acting on its behalf), including but not limited to severe adverse weather conditions, fires, strikes, pickets, material shortages, boycotts, national or regional lockouts or other national or regional labor disputes, acts of God, action or inaction or delay beyond customary response periods (e.g., issuance of permits or certificates of completion/occupancy) by any governmental or quasi-governmental entity, or civil disobedience. In no event shall Tenant’s financial condition or inability to pay any costs for which it is responsible hereunder constitute a Force Majeure Delay. To invoke a Force Majeure Delay excuse, Tenant must provide notice to Landlord within ten (10) days of learning of the Force Majeure Delay, detailing such Force Majeure Delay event and its anticipated duration (and no Force Majeure Delay period will be deemed to have commenced until such notice is given). Tenant shall thereafter take whatever reasonable steps are necessary to relieve the effect of such cause as rapidly as possible and shall provide written notice to Landlord when the Force Majeure Delay is no longer hindering Tenant in the progress of achieving Substantial Completion.
Construction and Management. Subsection 2.1.1 is modified to provide that the Substantial Completion date is September 30, 2021.
Construction and Management. The City and Port entered into an agreement on September 29, 2004, that addresses permitting responsibilities between the parties and Sound Transit. After the LRT is constructed, the parties shall continue to work cooperatively to address additional phases of LRT construction and operation.
Construction and Management. Article 3: Party A shall be responsible for the construction, testing, connecting and maintenance of the SMS system needed for the cooperation, and assume the generated expenses, including all the expenses for hardware equipment, software, system testing, and connecting and system maintenance. Article 4: Party B shall be responsible for the construction, renting, testing, connecting and maintenance of “Monternet SMS” business system and the data links between two parties needed for the cooperation, and assume the generated expenses, including all the expenses for hardware equipment, software, system testing, connecting and system maintenance and daily business management. Article 5: At Party B’s written request, prior to November 1, 2001, Party A shall open the relevant standard of technology agreement and interface of the SMS information system to Party B, distribute the enterprise code [*], connection service code [*] to Party B. Article 6: Party A shall be responsible for the maintenance of SMS communication system, ensure the stability and freely flowing of the information transmission in Party A’s network, and assume the liabilities arising from Party A’s network problems. Article 7: Party A can control the port number and traffic of SMS information system. In order to maintain the stability of SMS, Party A may adjust the traffic of SMS in time according to the capability of SMS information system, but shall notify Party B in advance, Party B shall cooperate with Party A in its arrangement and adjustment actively, and assume the liabilities arising from its improper cooperation. Article 8: Party B shall be responsible for the maintenance of application system, ensure the stability and freely flowing of the information transmission in Party B’s network, and assume the liabilities arising from Party B’s application system problems. Party B shall also ensure its system not to affect the normal running of Party A’s current mobile communication system network, and assume compensation liabilities for the losses of Party A caused by Party B’s system problems. Article 9: During the use of the standard of technology agreement and interface for the SMS information system provided by Party A, Party B shall ensure that it is only used in developing and providing “Monternet SMS” business hereunder, and not in other businesses non-relevant “Monternet SMS” business. Article 10: Party B shall observe the using status of “Monternet SMS” business timely, and provide a ...

Related to Construction and Management

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • CONSTRUCTION AND RENOVATION Construction and renovation projects for a state, local, territorial, or Tribal government’s principal Emergency Operations Center (EOC) as defined by the State Administrative Agency are allowable under the EMPG Program. Written approval must be provided by FEMA prior to the use of any EMPG Program funds for construction or renovation. Requests for EMPG Program funds for construction of an EOC must be accompanied by an EOC Investment Justification (located in the Related Documents tab of the EMPG xxxxxx.xxx posting) to their Regional EMPG Manager for review. Additionally, recipients are required to submit a SF-424C Form and Budget detail citing the project costs. When applying for funds to construct communication towers Sub-Recipients must submit evidence that the Federal Communication Commission’s (FCC) Section 106 review process has been completed and submit all documentation resulting from that review to Grants Program Directorate (GPD) prior to submitting materials for EHP review. Sub-Recipients are also encouraged to have completed as many steps as possible for a successful EHP review in support of their proposal for funding (e.g., coordination with their State Historic Preservation Office to identify potential historic preservation issues and to discuss the potential for project effects, compliance with all state and EHP laws and requirements). Projects for which the Sub-Recipient believes an Environmental Assessment (EA) may be needed, as defined in as defined in DHS Instruction Manual 023-01-001-01, Revision 01, FEMA Directive 108-1 and FEMA Instruction 108-1-1, must also be identified to the FEMA EMPG Regional Program Manager within six months of the award, and completed EHP review materials must be submitted no later than 12 months before the end of the period of performance. EHP review packets should be sent to xxxxxxxxxx@xxxx.xxx. EMPG Program Sub-Recipients using funds for construction projects must comply with the Xxxxx-Xxxxx Act (40 U.S.C. §§ 3141 et seq.). Grant Sub-Recipients must ensure that their contractors or subcontractors for construction projects pay workers no less than the prevailing wages for laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the state in which the work is to be performed. Additional information regarding compliance with the Xxxxx- Xxxxx Act, including Department of Labor (DOL) wage determinations, is available from the following website: xxxxx://xxx.xxx.xxx/whd/govcontracts/dbra.htm In general, Sub-Recipients should consult with their Grant Manager prior to making any investment that does not clearly meet the allowable expense criteria established in this Guidance.

  • Workload Management 11.1 The parties to this Agreement acknowledge that employees and management have a responsibility to maintain a balanced workload and recognise the adverse affects that excessive workloads may have on employee/s and the quality of resident/client care. 11.2 To ensure that employee concerns involving excessive workloads are effectively dealt with by Management the following procedures should be applied: (a) Step 1: In the first instance, employee/s should discuss the issue with their immediate supervisor and, where appropriate, explore solutions. (b) Step 2: If a solution cannot be identified and implemented, the matter should be referred to an appropriate senior manager for further discussion. (c) Step 3: If a solution still cannot be identified and implemented, the matter should be referred to the Facility Manager for further discussion. (d) Step 4: The outcome of the discussions at each level and any proposed solutions should be recorded in writing and fed back to the effected employees. 11.3 Workload management must be an agenda item at staff meetings on at least a quarterly basis. Items in relation to workloads must be recorded in the minutes of the staff meeting, as well as actions to be taken to resolve the workloads issue/s. Resolution of workload issues should be based on the following criteria including but not limited to: (a) Clinical assessment of residents’ needs; (b) The demand of the environment such as facility layout; (c) Statutory obligation, (including, but not limited to, work health and safety legislation); (d) The requirements of nurse regulatory legislation; (e) Reasonable workloads (such as roster arrangements); (f) Accreditation standards; and (g) Budgetary considerations. 11.4 If the issue is still unresolved, the employee/s may advance the matter through Clause 9 Dispute Resolution Procedure. Arbitration of workload management issues may only occur by agreement of the employer and the employee representative, which may include the union/s.

  • Network Maintenance and Management 38.1 The Parties will work cooperatively to implement this Agreement. The Parties will exchange appropriate information (for example, maintenance contact numbers, network information, information required to comply with law enforcement and other security agencies of the government, escalation processes, etc.) to achieve this desired result. 38.2 Each Party will administer its network to ensure acceptable service levels to all users of its network services. Service levels are generally considered acceptable only when End Users are able to establish connections with little or no delay encountered in the network. Each Party will provide a twenty four (24)-hour contact number for Network Traffic Management issues to the other’s surveillance management center. 38.3 Each Party maintains the right to implement protective network traffic management controls, such as “cancel to”, “call gapping” or seven (7)-digit and ten (10)-digit code gaps, to selectively cancel the completion of traffic over its network, including traffic destined for the other Party’s network, when required to protect the public-switched network from congestion as a result of occurrences such as facility failures, switch congestion or failure or focused overload. Each Party shall immediately notify the other Party of any protective control action planned or executed. 38.4 Where the capability exists, originating or terminating traffic reroutes may be implemented by either Party to temporarily relieve network congestion due to facility failures or abnormal calling patterns. Reroutes shall not be used to circumvent normal trunk servicing. Expansive controls shall be used only when mutually agreed to by the Parties. 38.5 The Parties shall cooperate and share pre-planning information regarding cross-network call-ins expected to generate large or focused temporary increases in call volumes to prevent or mitigate the impact of these events on the public-switched network, including any disruption or loss of service to the other Party’s End Users. Facsimile (FAX) numbers must be exchanged by the Parties to facilitate event notifications for planned mass calling events. 38.6 Neither Party shall use any Interconnection Service provided under this Agreement or any other service related thereto or used in combination therewith in any manner that interferes with or impairs service over any facilities of AT&T-21STATE, its affiliated companies or other connecting telecommunications carriers, prevents any carrier from using its Telecommunications Service, impairs the quality or the privacy of Telecommunications Service to other carriers or to either Party’s End Users, causes hazards to either Party’s personnel or the public, damage to either Party’s or any connecting carrier’s facilities or equipment, including any malfunction of ordering or billing systems or equipment. Upon such occurrence either Party may discontinue or refuse service, but only for so long as the other Party is violating this provision. Upon any such violation, either Party shall provide the other Party notice of the violation at the earliest practicable time. 38.7 AT&T TENNESSEE hereby commits to provide Disaster Recovery to CLEC according to the plan below. 38.7.1 AT&T TENNESSEE Disaster Recovery Plan 38.7.2 In the unlikely event of a disaster occurring that affects AT&T TENNESSEE’s long-term ability to deliver traffic to a CLEC, general procedures have been developed by AT&T TENNESSEE to hasten the recovery process in accordance with the Telecommunications Service Priority (TSP) Program established by the FCC to identify and prioritize telecommunication services that support national security or emergency preparedness (NS/EP) missions. A description of the TSP Program as it may be amended from time to time is available on AT&T TENNESSEE’s Wholesale – Southeast Region Web site. Since each location is different and could be affected by an assortment of potential problems, a detailed recovery plan is impractical. However, in the process of reviewing recovery activities for specific locations, some basic procedures emerge that appear to be common in most cases. 38.7.3 These general procedures should apply to any disaster that affects the delivery of traffic for an extended time period. Each CLEC will be given the same consideration during an outage, and service will be restored as quickly as possible. AT&T TENNESSEE reserves the right to make changes to these procedures as improvements become available or as business conditions dictate. 38.7.4 This plan will cover the basic recovery procedures that would apply to every CLEC.

  • Construction and Maintenance There are on-going maintenance, renovation and construction projects taking place in and around the residences. The work typically takes place during regular business hours, but may begin earlier or extend into evenings or weekends. On-going construction or renovation projects will continue through midterm and final exam periods. The University will take measures to ensure that prudent construction practices are followed, but there may be noise, dust and temporary interruption of some services. Residents may be required to temporarily or permanently relocate to facilitate construction or renovation to their residence area. There will be no compensation or reduction to your residence fees due to disruption and/or relocation.

  • Construction of the Project Highway (i) The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The [650th (six hundred and fiftieth) day] from the Appointed Date shall be the scheduled completion date (the “Scheduled Completion Date”) and the Contractor agrees and undertakes that the construction shall be completed on or before the Scheduled Completion Date, including any extension thereof. (ii) The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date specified in Schedule –J and until such Project Milestone is achieved or the Project Highway is completed; provided that if the period for any or all Project Milestones or the Scheduled Completion Date is extended in accordance with the provisions of this Agreement, the dates set forth in Schedule-J shall be deemed to be modified accordingly and the provisions of this Agreement shall apply as if Schedule-J has been amended as above; provided further that in the event the Project Highway is completed within or before the Scheduled Completion Date including any Time Extension, applicable for that work or section, the Damages paid under this Clause 10.3 (ii) shall be refunded by the Authority to the Contractor, but without any interest thereon. The Parties agree that for determining achievement or delays in completion of the Project Milestones or the Project on the due date, the works affected due to delay in providing the site for which time extension has been granted beyond the Scheduled Completion Date will be excluded. For example on the due date to achieve the Project Milestone-I (i.e., Stage Payments of 10% (ten percent) of Contract Price on 180th (one hundred and eighty) day from the Appointed Date), if 5% (five percent) of the project length corresponding to the Project Milestone-I is not handed over or lately handed over resulting in the extension of completion of this 5% (five percent) length beyond Scheduled Completion Date, Stage Payment of 10% X 0.95 = 9.5% only is to be achieved by 180th (one hundred and eighty) day. For the avoidance of doubt, it is agreed that recovery of Damages under this Clause 10.3 (ii) shall be without prejudice to the rights of the Authority under this Agreement including the right of Termination thereof. The Parties further agree that Time Extension hereunder shall only be reckoned for and in respect of the affected Works as specified in Clause 10.5 (ii). (iii) The Authority shall notify the Contractor of its decision to impose Damages in pursuance with the provisions of this Clause 10.3. Provided that no deduction on account of Damages shall be effected by the Authority without notifying the Contractor of its decision to impose the Damages, and taking into consideration the representation, if any, made by the Contractor within 20 (twenty) days of such notice. The Parties expressly agree that the total amount of Damages under Clause 10.3 (ii) shall not exceed 10% (ten percent) of the Contract Price. If the damages exceed 10% (ten percent) of the Contract Price, the Contractor shall be deemed to be in default of this agreement having no cure and the Authority shall be entitled to terminate this Agreement by issuing a Termination Notice in accordance with the provisions of Clause 23.1 (ii). (iv) In the event that the Contractor fails to achieve the Project Completion within a period of 90 (ninety) days from the Schedule Completion Date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, the contractor shall be deemed to be ineligible for bidding any future projects of the Authority, both as the sole party or as one of the parties of Joint Venture/ Consortium during the period from Scheduled Completion Date to issuance of Completion Certificate. This restriction is applicable if the contract value of the delayed project is not less than Rs. 300 Crore.

  • Construction of the Project The Allottee has seen the proposed layout plan, specifications, amenities and facilities of the Apartment/ Plot and accepted the floor plan, payment plan and the specification, amenities and facilities annexed along with this Agreement which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the said layout plans, floor plans and specifications, amenities and facilities. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the bye-laws, FAR, and density norms and provisions prescribed by the relevant building bye-laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act, and breach of this term by the Promoter shall constitute a material breach of this Agreement.

  • Construction Activities Please list all major construction activities, both planned and completed, to be performed by Seller or the EPC Contractor. Activity EPC Contractor / Subcontractor Completion Date __/__/____ (expected / actual) __/__/____ (expected / actual)

  • Construction Management Services a. A-E may be required to review and recommend approval of submittals, shop drawings, Request for Information (RFI) and/or calculations for temporary structures such as trench shoring, false work and other temporary structural forms. b. A-E may be required to review and advise the County Representative on the overall project schedule, including staging and completion dates, duration, milestones, and interfaces. Immediately notify Representative if the proposed work schedule does not conform to the contract documents, including the plans, specifications, and permits or that may require special inspection or testing, or work stoppage. c. Review on a monthly basis the project schedule and/or Critical Path Method (CPM) schedule submitted by the Construction Contractor. Make recommendations concerning the Construction Contractor’s adherence thereto. Recommend possible solutions to scheduling problems so as to complete the project on time, within budget, and in accordance with the contract drawings and specifications. d. Review scope of work and identify potential contract change orders. Prepare independent cost estimates for any changes resulting from design revisions or change in field conditions. Prepare and recommend for approval all contract change orders. e. Evaluate the merit of any potential claims or requests for equitable adjustment submitted by the Construction Contractor. Prepare analysis of potential claims include recommendations regarding settlement of the claims. f. Assist County staff in project related issues with other Agencies, or departments, engineering and material testing support firms, CEQA consultants, utilities agencies, etc. g. Assist in community outreach meetings and media relations h. Review for acceptance/approval of Storm Water Pollution Prevention Plan (SWPPP) in accordance with the general Permit of Discharges of Storm Water Associated with Construction Activity (Construction General Permit, including dewatering/diversion plans per the State’s DeMinimus Permit).

  • Property Management (a) Borrower shall (i) cause Manager to manage the Properties in accordance with the Management Agreement, (ii) diligently perform and observe all of the terms, covenants and conditions of the Management Agreement on the part of Borrower to be performed and observed, (iii) promptly notify Lender of any default under the Management Agreement of which it is aware, (iv) promptly deliver to Lender a copy of each financial statement, business plan, capital expenditures plan, report and estimate received by it under the Management Agreement, and (v) promptly enforce the performance and observance of all of the covenants required to be performed and observed by Manager under the Management Agreement in a commercially reasonable manner. If Borrower shall default in the performance or observance of any material term, covenant or condition of the Management Agreement on the part of Borrower to be performed or observed, then, without limiting Lender’s other rights or remedies under this Agreement or the other Loan Documents, and without waiving or releasing Borrower from any of its Obligations hereunder or under the Management Agreement, Lender shall have the right, but shall be under no obligation, to pay any sums and to perform any act as may be appropriate to cause all the material terms, covenants and conditions of the Management Agreement on the part of Borrower to be performed or observed. In no event shall the fee payable to Manager for any Interest Period exceed the Management Fee Cap for such Interest Period and in no event shall Borrower pay or become obligated to pay to Manager, any transition or termination costs or expenses, termination fees, or their equivalent in connection with the Transfer of a Property or the termination of the Management Agreement. (b) If any one or more of the following events occurs: (i) the occurrence of an Event of Default, (ii) Manager shall be in material default under the Management Agreement beyond any applicable notice and cure period (including as a result of any gross negligence, fraud, willful misconduct or misappropriation of funds), or (iii) Manager shall become insolvent or a debtor in any bankruptcy or insolvency proceeding, then Lender shall have the right to require Borrower to replace the Manager and enter into a Replacement Management Agreement with (x) a Qualified Manager selected by Borrower that is not an Affiliate of Borrower or (y) another property manager chosen by Borrower and approved by Lender; provided, that such approval shall be conditioned upon Borrower delivering a Rating Agency Confirmation as to such property manager. If Borrower fails to select a new Qualified Manager or a replacement Manager that satisfies the conditions described in the foregoing clause (y) and enter into a Replacement Management Agreement with such Person within sixty (60) days of Lender’s demand to replace the Manager, then Lender may choose the replacement property manager provided that such replacement property manager is a Qualified Manager or satisfies the conditions set forth in the foregoing clause (y).