Construction Drawings, Cost Statement and Allowance Sample Clauses

Construction Drawings, Cost Statement and Allowance. (a) Promptly after the execution of this Amendment by and between Landlord and Tenant, Tenant will work with Landlord’s space planner to develop a space plan for the Leased Premises that is reasonably acceptable to Landlord or portions thereof (the “Space Plan”), it being the intent of the parties that the generation of the Space Plan, including at least one (1) revision thereto, shall be at Landlord’s sole cost and expense, and such cost and expense shall be in addition to the Allowance (as defined below) and the Additional Allowance (as defined below). It is understood and agreed that, consistent with applicable building codes and requirements of law, Tenant shall be permitted freedom in the design and layout of the Leased Premises. Within twenty (20) days after Landlord’s receipt of the Space Plan, Landlord shall prepare and submit to Tenant a set of construction drawings (the “CD’s”) covering all work to be performed in accordance with the Space Plan (such work, together with all work incidental thereto, is referred to hereinafter in this Exhibit X-x as the “Tenant Improvements”). Tenant shall have ten (10) days after receipt of the CD’s in which to review the CD’s and to give Landlord written notice of Tenant’s approval of the CD’s or its requested changes thereto. Tenant shall have no right to request any changes to the CD’s that would materially alter the exterior appearance or basic nature of the Building or the Building systems. If Tenant fails to request changes to the CD’s within ten (10) days after its receipt of the CD’s, then Tenant shall be deemed to have approved the CD’s and the same shall thereupon be final. If Tenant requests any changes to the CD’s, Landlord shall make those changes which are reasonably requested by Tenant and shall, within ten (10) days of its receipt of such request submit the revised portion of the CD’s to Tenant. Tenant may not thereafter disapprove the revised portions of the CD’s unless Landlord has unreasonably failed to incorporate reasonable comments of Tenant and, subject to the foregoing, the CD’s, as modified by said revisions, shall be deemed to be final upon the submission of said revisions to Tenant. Tenant shall at all times in its review of the CD’s, and of any revisions thereto, act reasonably and in good faith. Tenant agrees to confirm Tenant’s consent to the CD’s in writing within three (3) days following Landlord’s written request therefor. Nothing contained in this Section 2(b) shall be construed t...
AutoNDA by SimpleDocs
Construction Drawings, Cost Statement and Allowance. (a) Promptly after Tenant's exercise of the Expansion Option, and in all events no later than the Expansion Date, Landlord shall, at Landlord's sole cost and expense, perform the Building Readiness Work set forth on Exhibit B hereto, to the extent applicable to the Expansion Space. In addition, Landlord shall, at Landlord's sole cost and expense, construct and install (i) forty (40) additional onsite trailer parking spaces, (ii) a perimeter fence, (iii) two (2) gates within the perimeter fence, and (iv) a guardhouse (collectively, the "Landlord's Work"). The Landlord's Work shall be constructed and installed in locations and in accordance with such standards as are reasonably acceptable to Landlord and Tenant, and shall be compliant with a Free Trade Zone designation and C-TPAT requirements. The Landlord's Work shall be constructed and installed pursuant to drawings prepared by Landlord promptly following Tenant's exercise of the Expansion Option, which drawings shall be subject to Tenant's approval. Landlord shall use reasonable efforts to complete all Landlord's Work prior to the Expansion Date.
Construction Drawings, Cost Statement and Allowance. (a) Landlord shall, at Landlord’s sole cost, engage Xxxxxxxx Architecture, P.A. as Landlord’s space planner. Promptly following the date hereof, Tenant will work with Landlord’s space planner to develop a space plan for the Leased Premises that is reasonably acceptable to Landlord (the “Space Plan”). Tenant shall deliver the Space Plan to Landlord within twenty (20) days after the date of this Lease.
Construction Drawings, Cost Statement and Allowance. (a) On or before the thirtieth (30th) day following the date hereof, Landlord shall prepare and submit to Tenant a set of construction drawings (the "CD's") covering all work to be performed by Landlord in constructing and installing the Tenant Improvements, which shall be based on the scope of work attached as EXHIBIT B-1 hereto. Landlord shall bear responsibility for ensuring that (i) the CD's are prepared by an architect and or engineer licensed in the State of North Carolina, (ii) such CD's will comply with the laws, codes, and ordinances of governmental authority having jurisdiction over the Leased Premises, and (iii) the CD's represent the reasonable and logical development of the scope of work set forth on EXHIBIT B-1 hereto.

Related to Construction Drawings, Cost Statement and Allowance

  • Tenant Improvement Allowance Items Except as otherwise set forth in this Tenant Work Letter, the Tenant Improvement Allowance shall be disbursed by Landlord only for the following items and costs (collectively the “Tenant Improvement Allowance Items”):

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Tenant Improvement Allowance Subject to the terms of this Section 38 set forth below, there shall be paid by the Landlord as the Landlord’s contribution toward Tenant’s Initial Alterations, the sum (“Allowance”) of $7,191,555.84, based upon a contribution of $68.04 per rentable square foot for 105,696 rentable square feet in the Initial Premises. Tenant shall submit to Landlord Tenant’s good faith estimate (“Qualified Cost Estimate”) of the Qualified Costs (hereinafter defined) to be incurred by Tenant in connection with its move to and the construction of Initial Alterations in the Premises. Installments of the Allowance shall be payable in accordance with the procedures set forth below. Installments of the Allowance, which shall in no event exceed in the aggregate the amount of the Allowance, shall be paid to Tenant (or, at Landlord’s option if Landlord reasonably determines that Tenant is not paying its contractors and such failure to pay may give rise to a lien against the Building, to the order of the contractor that performed the work set forth in the respective invoices) or, at Tenant’s option to Tenant’s contractors, with respect to Qualified Costs theretofore incurred by Tenant (and not theretofore paid to Tenant or which were Tenant’s responsibility as set forth in this Article 38) for which Tenant has submitted a requisition consisting of, (i) in the case of other than costs incurred under architectural and engineering contracts (collectively “Professional Services Contracts”) or under construction contracts, such as furniture or moving or professional fees that are contracted for by Tenant separate from construction and Professional Services Contracts, paid invoices, (ii) in the case of Professional Services Contracts, invoices, and (iii) in the case of construction costs (a) an application for payment and sworn statement of a contractor performing general contracting work in the Premises substantially in the form of AIA Document G-702 covering all work for which disbursement is to be made to a date specified therein which is part of the construction contract; (b) a certification from an AIA architect substantially in the form of the Architect’s Certificate for Payment which is located on AIA Document G702, Application and Certificate of Payment; (c) contractor’s, project managers and subcontractor’s waivers of liens which shall cover all applicable items of Qualified Costs under such construction contracts for which disbursement is being requested and any other statements and forms required for compliance with the mechanics’ lien laws of the Commonwealth of Massachusetts, together with invoices with respect to such Qualified Costs and such other supporting data as Landlord or Landlord’s Mortgagee may reasonably require; (iv) a cost breakdown for each trade or subcontractor performing the work included in Qualified Costs for which a request for disbursement under such construction contracts is being made; (v) copies of all construction contracts for the such Alterations, together with copies of all change orders, if any; and (iii) a request to disburse from Tenant containing an acknowledgement by Tenant of the work done and a good faith estimate of the cost to complete the Initial Alterations to the Premises. Upon completion of the Initial Alterations, and as part of the requisition for final disbursement of the Allowance for hard construction costs, Tenant shall furnish Landlord with: (1) general contractor and architect’s completion affidavits, (2) full and final waivers of lien, (3) receipted bills covering all labor and materials expended and used, (4) as-built plans of the Alterations, and (5) the certification of Tenant’s architect to the Landlord that, based on on-site observation and the data comprising the application for disbursement, to the best of the architect’s knowledge, information and belief, the Alterations have progressed as indicated in the application, the quality of the Alterations is in accordance with the construction contract documents and the contractor is entitled to; payment of the amount certified in the application. Notwithstanding the foregoing, if the Qualified Cost Estimate exceeds the Allowance, Tenant shall be entitled to payments with respect to any requisition in accordance with the terms hereof except that each individual disbursement of the Allowance by Landlord shall be in the same ratio to the amount properly requisitioned as the Allowance bears to the Adjusted Qualified Cost Estimate (hereinafter defined). “Adjusted

  • Improvement Allowance The Lessor is contributing to Lessee an improvement allowance (the “Initial Improvement Allowance”) of $70.000. Lessor must spend the Initial Improvement Allowance on costs related to the construction of the Improvements (as defined in Article 40 of the Lease). As part of the Improvements, Lessor shall provide new carpet for the office area and rear section of the Leased Premises as noted on the attached plan. In addition, the Lessor will paint the walls in the Leased Premises, and provide selective demolition (to be mutually agreed upon). The Lessor will add wall between the R&D lab space and the administrative cubicle area, as noted on the attached plan. The Initial Improvement Allowance will be used to fund Lessor’s activities related to the Improvements under this Exhibit X. Xxxxxx shall not charge Lessee any administration and supervision fee in connection with Xxxxxx’s work on the Improvements. The Leased Premises will be available on or about March 1, 2020 for work to commence work on the Improvements and Lessee to inspect the Building and the Leased Premises. Promptly following mutual execution of the Lease but prior to Lessor commencing any work under this Exhibit D, Lessor shall submit to Lessee, for its consent, a detailed construction plan, specifying materials to be used, renderings and schematics for the initial Improvements described above (the “Initial Improvement Plan”). Following Xxxxxx’s consent to the Initial Improvement Plan, Lessor shall exercise all reasonable efforts to have their general contractor bid and substantially complete the work for the Initial Improvements by April 1, 2020. Lessee shall have the right to inspect the Initial Improvements as they are being made. Lessor shall proceed with and complete the construction of the Improvements described above. As soon as such improvements have been Substantially Completed, Lessor shall notify Lessee in writing of the date that the Improvements were Substantially Completed. The Improvements shall be deemed substantially completed (“Substantially Completed”) when only punch list items remain which do not prevent in any material way the use of the Improvements for the purposes for which they were intended. If the Initial Improvement Allowance exceeds $70,000, then Xxxxxx will reimburse Lessor within thirty (30) days of the Improvements being substantially completed. 3706364.3/MTBA-JRP

  • Disbursement of the Tenant Improvement Allowance Except as otherwise set forth in this Tenant Work Letter, the Tenant Improvement Allowance shall be disbursed by Landlord (each of which disbursement shall be made pursuant to Landlord’s standard disbursement process), only for the following items and costs (collectively, the “Tenant Improvement Allowance Items”):

  • Disbursement of Tenant Improvement Allowance During the construction of the Tenant Improvements, Landlord shall make monthly disbursements of the Tenant Improvement Allowance for Tenant Improvement Allowance Items for the benefit of Tenant and shall authorize the release of monies for the benefit of Tenant as follows.

  • Construction Contract; Cost Budget Prior to execution of a construction contract, Tenant shal] submit a copy of the proposed contract with the Contractor for the construction of the Tenant Improvements, including the genera] conditions with Contractor (the “Contract”) to Landlord for its approval, which approval shall not be unreasonably withheld, conditioned or delayed. Following execution of the Contract and prior to commencement of construction, Tenant shall provide Landlord with a fully executed copy of the Contract for Landlord’s records. Prior to the commencement of the construction of the Tenant Improvements, and after Tenant has accepted all bids and proposals for the Tenant Improvements, Tenant shall provide Landlord with a detailed breakdown, by trade, for all of Tenant’s Agents, of the final estimated costs to be incurred or which have been incurred in connection with the design and construction of the Tenant Improvements to be performed by or at the direction of Tenant or the Contractor (the “Construction Budget”), which costs shall include, but not be limited to, the costs of the Architect’s and Engineers’ fees and the Landlord Coordination Fee. The amount, if any, by which the total costs set forth in the Construction Budget exceed the amount of the Tenant Improvement Allowance is referred to herein as the “Over Allowance Amount”. In the event that an Over-Allowance Amount exists, then prior to the commencement of construction of the Tenant Improvements, Tenant shall supply Landlord with cash in an amount equal to the Over- Allowance Amount. The Over-Allowance Amount shall be disbursed by Landlord prior to the disbursement of any of the then remaining portion of the Tenant Improvement Allowance, and such disbursement shall be pursuant to the same procedure as the Tenant Improvement Allowance. In the event that, after the total costs set forth in the Construction Budget have been delivered by Tenant to Landlord, the costs relating to the design and construction of the Tenant Improvements shall change, any additional costs for such design and construction in excess of the total costs set forth in the Construction Budget shall be added to the Over-Allowance Amount and the total costs set forth in the Construction Budget, and such additional costs shall be paid by Tenant to Landlord immediately as an addition to the Over-Allowance Amount or at Landlord’s option, Tenant shall make payments for such additional costs out of its own funds, but Tenant shall continue to provide Landlord with the documents described in items (1), (ii), (iii) and (iv) of Section 2.2.2.1 of this Tenant Work Letter, above, for Landlord’s approval, prior to Tenant paying such costs. All Tenant Improvements paid for by the Over-Allowance Amount shall be deemed Landlord’s property under the terms of the Lease. 4.2.2

  • Construction Allowance Landlord shall provide to Tenant a construction allowance not to exceed $45.00 per rentable square foot in the Premises (the “Construction Allowance”) to be applied toward the Total Construction Costs, as adjusted for any changes to the Tenant’s Work. No advance of the Construction Allowance shall be made by Landlord until Tenant has first paid to the contractor from its own funds (and provided reasonable evidence thereof to Landlord) the anticipated Excess Amount. Thereafter, Landlord shall pay to Tenant the Construction Allowance, to be applied solely toward the remaining Total Construction Costs and not in reimbursement of the Excess Amount paid by Tenant, in multiple disbursements (but not more than once in any calendar month) following the receipt by Landlord of the following items: (i) a request for payment, (ii) final, unconditional or partial lien waivers, as the case may be, from all persons performing work or supplying or fabricating materials for the Tenant’s Work, fully executed, acknowledged and in recordable form, (iii) copies of all invoices and proof of payment of same, and (iv) the Architect’s certification that the Tenant’s Work for which reimbursement has been requested has been finally completed, including (with respect to the last application for payment only) any punch-list items, on the appropriate AIA form or another form approved by Landlord, and, with respect to the disbursement of the last 10% of the Construction Allowance: (1) the permanent certificate of occupancy issued for the Premises, (2) Tenant’s occupancy of the Premises, (3) delivery of the “as-built” plans for the Tenant’s Work as constructed (and as set forth above) to Landlord’s construction representative (set forth below), and (4) an estoppel certificate confirming such factual matters as Landlord or Landlord’s Mortgagee may reasonably request (collectively, a “Completed Application for Payment”). Landlord shall pay the amount requested in the applicable Completed Application for Payment to Tenant within 30 days following Tenant’s submission of the Completed Application for Payment. If, however, the Completed Application for Payment is incomplete or incorrect, Landlord’s payment of such request shall be deferred until 30 days following Landlord’s receipt of the corrected Completed Application for Payment. Notwithstanding anything to the contrary contained in this Exhibit, Landlord shall not be obligated to make any disbursement of the Construction Allowance during the pendency of any of the following: (A) Landlord has received written notice of any unpaid claims relating to any portion of the Tenant’s Work or materials in connection therewith, other than claims which will be paid in full from such disbursement, (B) there is an unbonded lien outstanding against the Project or the Premises or Tenant’s interest therein by reason of work done, or claimed to have been done, or materials supplied or specifically fabricated, claimed to have been supplied or specifically fabricated, to or for Tenant or the Premises, (C) the conditions to the advance of the Construction Allowance are not satisfied, or (D) an Event of Default by Tenant exists. If the Total Construction Costs for the Premises are less than the Construction Allowance, then Tenant shall not be entitled to receive payment or credit for such difference and Landlord shall retain the same. The Construction Allowance must be used (that is, the Tenant’s Work must be fully complete and the Construction Allowance disbursed) within twenty-four (24) months following the Commencement Date or shall be deemed forfeited with no further obligation by Landlord with respect thereto, time being of the essence with respect thereto. The Construction Allowance may be used in Tenant’s discretion for Tenant’s Work with no stipulation from Landlord as to how much of the Construction Allowance is allocated within the various spaces in the Premises.

  • Tenant Improvement Costs The Tenant Improvements’ cost (the “Tenant Improvement Costs”) shall mean and include any and all costs and expenses of the Work, including, without limitation, all of the following:

  • Selection of Architect/Construction Drawings Tenant shall retain an architect/space planner reasonably and mutually agreed upon by Landlord and Tenant (the “Architect”) to prepare the “Construction Drawings,” as that term is defined in this Section 3.1. The Contractor (as that term is defined in Section 4.1 of this Work Letter) shall provide design-build services from qualified, Landlord-approved mechanical, electrical and plumbing contractors for the preparation of plans and engineering working drawings related to the Improvements. Landlord hereby approves Gensler as the Architect if Tenant decides to select them. Tenant shall retain the engineering consultants designated by Landlord (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, HVAC, lifesafety, and sprinkler work in the Premises, which work is not part of the Base Building, provided that Tenant shall retain the subcontractors designated in Schedule 2 attached hereto for the fire alarm design and programming work (the “Fire Alarm Subcontractor”) and for building management systems (the “BMS Subcontractor”). Landlord hereby approves Gensler as the Engineer if Tenant decides to select them. Should Tenant choose to prepare fully engineered drawings in lieu of the design-build approach described above, then Tenant shall retain the Engineers to prepare all plans and engineering working drawings relating to the mechanical, electrical and plumbing work of the Improvements. The plans and drawings to be prepared by Architect, the design-build contractors (unless Tenant selects the fully engineered drawings approach described above), the Fire Alarm Subcontractor, the BMS Subcontractor and the Engineers hereunder shall be known collectively as the “Construction Drawings.” Landlord hereby approves Gensler and Revel to be the Architect if Tenant selects them. All Construction Drawings shall comply with the drawing format and specifications reasonably determined by Landlord, and shall be subject to Landlord’s reasonable approval. Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the Base Building plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord’s review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord’s space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings, and Tenant’s waiver and indemnity set forth in the Lease, as amended, shall specifically apply to the Construction Drawings.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!