CONSTRUCTION METHODS ANDPROCEDURES Sample Clauses

CONSTRUCTION METHODS ANDPROCEDURES. 3.6.1 The methods and procedures adopted by DBE and its subcontractors for Construction Services shall be such as to secure a quality of Work satisfactory to City and to enable completion of the Work in the time agreed upon. If at any time such methods and procedures appear inadequate, City may order DBE to improve the character or increase efficiency, and DBE shall conform to such order; but the failure of City to order such improvement of methods or increase of efficiency will not relieve DBE from its obligation to perform the Work in accordance with the Contract Documentsor within the Contract Time.
AutoNDA by SimpleDocs

Related to CONSTRUCTION METHODS ANDPROCEDURES

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.

  • Procurement procedures 11.1 The Recipient must secure the best value for money and shall act in a fair, open and non-discriminatory manner in all purchases of goods and services.

  • Subcontract Procedures Without relieving it of, or in any way limiting, its obligations to NYSERDA under this Agreement, the Contractor may enter into Subcontracts for the performance of Work or for the purchase of materials or equipment. Prior to beginning any Work, Contractor shall notify the NYSERDA Project Manager of all subcontractors performing work under the Agreement, as well as all changes in subcontractors throughout the term of the Agreement. Except for a subcontractor or supplier specified in a team arrangement with the Contractor in the Contractor’s original proposal, and except for any subcontract or order for equipment, supplies or materials from a single subcontractor or supplier totaling less than $50,000, the Contractor shall select all subcontractors or suppliers through a process of competitive bidding or multi-source price review. A team arrangement is one where a subcontractor or supplier specified in the Contractor’s proposal is performing a substantial portion of the Work and is making a substantial contribution to the management and/or design of the Project. In the event that a competitive bidding or multi-source price review is not feasible, the Contractor shall document an explanation for, and justification of, a sole source selection. The Contractor shall document the process by which a subcontractor or supplier is selected by making a record summarizing the nature and scope of the work, equipment, supplies or materials sought, the name of each person or organization submitting, or requested to submit, a bid or proposal, the price or fee bid, and the basis for selection of the subcontractor or supplier. An explanation for, and justification of, a sole source selection must identify why the work, equipment, supplies or materials involved are obtainable from or require a subcontractor with unique or exceptionally scarce qualifications or experience, specialized equipment, or facilities not readily available from other sources, or patents, copyrights, or proprietary data. All Subcontracts shall contain provisions comparable to those set forth in this Agreement applicable to a subcontractor or supplier, and those set forth in Exhibit C to the extent required by law, and all other provisions now or hereafter required by law to be contained therein. Each Subcontract shall make express reference to this Agreement, and shall state that in the event of any conflict or inconsistency between any Subcontract and this Agreement, the terms and conditions of this Agreement shall control as between Subcontractor and Contractor. For each Subcontract valued at $100,000 or more, the Contractor shall obtain and maintain, pursuant to Section 4.05, a completed Vendor Assurance of No Conflict of Interest or Detrimental Effect form from such Subcontractor prior to the execution of the Subcontract. Such form shall be made available to the Contractor by NYSERDA. Each such Subcontract shall contain a provision whereby the Subcontractor warrants and guarantees that there is and shall be no actual or potential conflict of interest that could prevent the Subcontractor’s satisfactory or ethical performance of duties required to be performed pursuant to the terms of the Subcontract and that the Subcontractor shall have a duty to notify NYSERDA immediately of any actual or potential conflicts of interest. If this Agreement includes a provision requiring Contractor to make Payments to NYSERDA for the Sale or Licensing of a Product, each Subcontract shall include the provisions of Section 8.02, suitably modified to identify the parties. The Contractor shall submit to NYSERDA’s Contract Administrator for review and written approval any subcontract(s) specified in the Statement of Work as requiring NYSERDA approval, including any replacements thereof.

  • Induction Procedures a) The parties to this Agreement acknowledge that it is in the interests of the industry that all new employees and employers on a building project understand their obligations to this Agreement and are introduced to their jobs in a manner which will help them work safely and efficiently.

  • Drug Testing Procedures a. The testing procedures and safeguards provided in this policy shall be adhered to by any laboratory personnel administering departmental drug tests.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Testing Procedures Testing will be conducted by an outside certified Agency in such a way to ensure maximum accuracy and reliability by using the techniques, chain of custody procedures, equipment and laboratory facilities which have been approved by the U.S. Department of Health and Human Services. All employees notified of a positive controlled substance or alcohol test result may request an independent test of their split sample at the employee’s expense. If the test result is negative the Employer will reimburse the employee for the cost of the split sample test.

  • SAFETY PROCEDURES The Contractor shall:

  • DISCIPLINE PROCEDURES The discipline procedure may be initiated only within twenty (20) Days of the date the President or Vice-President (Academic and Research) knew, or ought reasonably to have known, of the occurrence of the matter giving rise to discipline. The Employer shall have the right to request, in writing to the Union, an extension of ten (10) Days. The Union shall not unreasonably reject the Employer’s request.

  • AML/KYC Procedures “AML/KYC Procedures” means the customer due diligence (CDD) procedures of a Reporting Financial Institution pursuant to the anti-money laundering or similar requirements of the jurisdiction concerned to which such Reporting Financial Institution is subject.

Time is Money Join Law Insider Premium to draft better contracts faster.