CONSTRUCTION STAGING AND STATION AREA – SOUTH STAGING AREA FOR PACIFIC STREET Sample Clauses

CONSTRUCTION STAGING AND STATION AREA – SOUTH STAGING AREA FOR PACIFIC STREET. STATION The staging area occupies portions of the following parcels as well as a portion of the University Way N.E. R/W No. 235UW-003 R/W No. 235UW-002 PIN 114200-3949 PIN 114200-4125 The University of Washington The University of Washington Staging area perimeter description: A portion of the NE ¼ of the SE ¼ of Section 17, Township 25 North, Range 4 East, W.M. BEGINNING AT THE INTERSECTION OF THE EAST MARGIN OF BROOKLYN AVE. (BEING 35 FEET OFFSET FROM THE CENTERLINE THEREOF) WITH THE NORTH MARGIN OF N.E. BOAT ST. (FORMERLY N.E. NORTHLAKE WAY), SAID MARGIN BEING NEWLY RELOCATED AT 40 FEET OFFSET FROM THE CENTERLINE THEREOF AS ORIGINALLY ESTABLISHED; THENCE N02º07’00”E, ALONG SAID EAST MARGIN OF BROOKLYN AVE., A DISTANCE OF 318.00 FEET; THENCE S87º53’00”E, AT RIGHT ANGLES FROM SAID EAST MARGIN, A DISTANCE OF 220.15 FEET TO THE WEST MARGIN OF UNIVERSITY WAY N.E. AS ORIGINALLY ESTABLISHED; THENCE N45º00’00”E A DISTANCE OF 44.07 FEET TO THE CENTER LINE OF SAID UNIVERSITY WAY N.E.; THENCE N02º06’23”E, ALONG SAID CENTER LINE A DISTANCE OF 123.55 FEET; THENCE N47º06’23”E, AT A 45 DEGREE ANGLE FROM SAID CENTER LINE, A DISTANCE OF 14.14 FEET; THENCE S87º53’37”E, AT RIGHT ANGLES FROM SAID CENTER LINE, A DISTANCE OF 20.00 FEET TO THE INTERSECTION OF THE EAST MARGIN OF SAID UNIVERSITY WAY WITH THE NORTHWESTERLY PROJECTION OF THE SOUTH MARGIN OF N.E. PACIFIC STREET, SAID SOUTH MARGIN BEING THE SOUTH LINE OF THE PERPETUAL R/W EASEMENT AS ESTABLISHED BY CITY OF SEATTLE ORDINANCE NO. 105955; THENCE S51º58’08”E ALONG SAID NORTHWESTERLY PROJECTION, A DISTANCE OF 23.51 FEET TO THE SAID SOUTH MARGIN OF N.E. PACIFIC ST. AT THE NORTHEASTERLY POINT OF CURVATURE WHERE SAID MARGIN USES A 12’ RADIUS CURVE TO TIE INTO THE EAST MARGIN OF SAID UNIVERSITY WAY N.E.; THENCE CONTINUES S51º58’08”E, ALONG SAID SOUTH MARGIN OF N.E. PACIFIC ST., A DISTANCE OF 107.01 FEET TO THE BEGINNING OF A NON- TANGENT CURVE CONCAVE TO THE SOUTHWEST, HAVING A RADIUS OF 40.00 FEET AND A LONG CHORD OF S00º47’56”E 49.62 FEET, SAID CURVE BEING NEWLY ESTABLISHED TO TIE THE SOUTH MARGIN OF N.E. PACIFIC ST. INTO THE WEST MARGIN OF NEWLY RELOCATED 15TH AVE. N.E.; THENCE SOUTHEASTERLY, SOUTHERLY AND SOUTHWESTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 76º39’47”, AN ARC DISTANCE OF 53.52 FEET TO A POINT OF TANGENCY ON THE WEST MARGIN OF SAID 15TH AVE. N.E.; THENCE S37º31’57”W ALONG SAID WEST MARGIN A DISTANCE OF 361.18 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE SOUTHEAST, HAVING A RADIUS OF 224.12 FEET; T...
AutoNDA by SimpleDocs

Related to CONSTRUCTION STAGING AND STATION AREA – SOUTH STAGING AREA FOR PACIFIC STREET

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • General Project Description 2. Substation location.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Construction Manager’s Fee The following shall be deemed included in the Construction Manager’s fee for services during the Construction Phase.

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR Other services: 130 thousand SDR List of Entities which procure the services, specified in Annex 4:

Time is Money Join Law Insider Premium to draft better contracts faster.