CONTRACT DRAWING Sample Clauses

CONTRACT DRAWING. 843-B205-01 OUTBOARD PROFILE B. GENERAL REQUIREMENTS The profile and arrangements of the barge shall be as shown on the contract drawing and as stated within these specifications. The Government does not require additional review of the Outboard Profile drawing. For the “As-Built” drawing of the Outboard Profile, the Contractor shall update the profile with the actual locations of machinery, equipment, and outfitting items. All major components shall be shown in actual outline (not as boxes) and identified in the drawing. Sections and elevations shall be included to the extent required to define the location of components. C215 GENERAL ARRANGEMENTS
AutoNDA by SimpleDocs
CONTRACT DRAWING. 843-B215-01 GENERAL ARRANGEMENT
CONTRACT DRAWING. 843-B405-01 CATHODIC PROTECTION
CONTRACT DRAWING. 843-B406-01 MDC STANDARD FLOATING PLANT PAINT SCHEDULE
CONTRACT DRAWING. 843-B601-01 PIPE MARKING GUIDE
CONTRACT DRAWING. 843-B675-01 DECK WASHDOWN SYSTEM
CONTRACT DRAWING. 843-B710-01 AC ELECTRICAL SYSTEM LOAD ANALYSIS 843-B710-02 DC ELECTRICAL SYSTEM LOAD ANALYSIS
AutoNDA by SimpleDocs
CONTRACT DRAWING. 843-B720-01 AC ELECTRICAL SYSTEM ONE-LINE DIAGRAM 843-B720-02 DC ELECTRICAL SYSTEM ONE-LINE DIAGRAM

Related to CONTRACT DRAWING

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • The Drawings The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Drawing One (1) Prize Winner will be chosen in a random drawing on or about February 1, 2023 from all eligible entries received. Odds of winning depend on the number of eligible entries received prior to the drawing. Return of prize notification as undeliverable or no response from the winner within seven (7) consecutive days after date of notification will result in disqualification and an alternate winner will be selected. If a prize winner is disqualified, Sponsor in its sole discretion will select a new winner. Sponsor reserves the right in its sole discretion to disqualify any individual it finds to be have tampered with the entry process or the operation of the promotion; to have acted in violation of the Official Rules; to have acted in violation of the terms of the website, or to have acted in an unsportsmanlike or disruptive manner, or with intent to annoy, abuse, threaten or harass any other person.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Construction Phase Part 1 –

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!