CPM Logic Sample Clauses

CPM Logic. The Contractor shall be responsible for developing the CPM logic of the Baseline Schedule and for updating that CPM logic each month to accurately reflect the progress of the Work and the Contractor’s current plan for the timely completion of the Work. (a) Activity Relationships - The schedule CPM logic for each activity shall be constructed in conformance with the following requirements: (i) Determine predecessors - Activities that must be completed before the activity can start.‌ (ii) Determine parallel activities - Activities that can occur concurrently with the activity. (iii) Determine successors - Activities that cannot start until the activity is complete. Determine the impact of all resource limitations on activity sequencing, activity durations and activity dates. All paths through the Contract Schedules shall proceed in the direction representing the progression of time. Activity lag and lead durations shall not have a negative value. Activity lags and leads shall not be used in lieu of activities. All the lags included in the Baseline Schedule shall be explained in the narrative and are subjected to the Authority’s approval. Redundant ties to preceding activities in a sequential series of activities will not be permitted. For example, if activity C is the successor in a Finish- Start relationship to activity B, and activity B is the successor in a Finish-Start relationship to activity A, then activity A shall not have a redundant Finish-Start relationship to activity C. A tie representing a different constraint will not be considered redundant. For example, a logic tie showing that the completion of the work scope of a predecessor is required before the successor can start is different from a logic tie representing a resource limitation and will not be considered redundant. The Quality Milestones in the CPM schedule shall not be open ends. They will be tied to logical predecessor activities and shall be tied to an administrative activity or milestone such as contract close-out as a successor.
AutoNDA by SimpleDocs

Related to CPM Logic

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority 3.2 The Authority may from time to time make changes to the KPIs measured as set out in paragraph 3.1 above and shall issue a replacement version to the Supplier. The Authority shall give notice In Writing of any such change to the KPIs measured and shall specify the date from which the replacement KPIs must be used for future reports. Such date shall be at least thirty (30) calendar days following the date of the notice to the Supplier.

  • Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: xxxxx://xxxxxxx.xxxxxxxx.xxx/guides/signer-guide- signing-system-requirements.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopted for the employees of the Employer; 5.2 The Employee accepts that the purpose of the performance management system will be to provide a comprehensive system with specific performance standards to assist the employees and service providers to perform to the standards required; 5.3 The Employer must consult the Employee about the specific performance standards and targets that will be included in the performance management system applicable to the Employee; 5.4 The Employee undertakes to actively focus on the promotion and implementation of the key performance indicators (including special projects relevant to the employee’s responsibilities) within the local government framework; 5.5 The criteria upon which the performance of the Employee shall be assessed shall consist of two components, Operational Performance and Competencies both of which shall be contained in the Performance Agreement; 5.6 The Employee’s assessment will be based on his performance in terms of the outputs/outcomes (performance indicators) identified as per attached Performance Plan, which are linked to the KPAs, and will constitute 80% of the overall assessment result as per the weightings agreed to between the Employer and Employee; 5.7 The Competencies will make up the other 20% of the Employee’s assessment score. The Competencies are spilt into two groups, leading competencies (indicated in blue on the graph below) that drive strategic intent and direction and core competencies (indicated in green on the graph below), which drive the execution of the leading competencies. Strategic direc on and leadership People management Program and project management Financial management Change leadership Governance leadersip Moral competence Planning and organising Analysis and innova on Knowledge and informa on management Communica on Results and quality focus

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Staffing Plan The Board and the Association agree that optimum class size is an important aspect of the effective educational program. The Polk County School Staffing Plan shall be constructed each year according to the procedures set forth in Board Policy and, upon adoption, shall become Board Policy.

  • Project Management Plan Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan and

  • Connectivity User is solely responsible for providing and maintaining all necessary electronic communications with Exchange, including, wiring, computer hardware, software, communication line access, and networking devices.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!