CREWS. The minimum number of workers required to form a crew shall be as follows: a) Pile driver; water rig, fixed leads, donkey powered: b) Pile driver; skid rig, donkey powered: c) Pile driver; floating xxxxxxx rig, on-board fixed or mobile crane, with A-frame or moonbeam leads or hanging leads from boom: d) Pile driver; on land, crawler or truck crane: e) Pile driver; on land, compactor rig: f) Pile driver; on land, Franki rig: g) All drilling applications h) Air-trac or churn drill when used for foundation piles, on land or water. i) Rotary drill rig (auger or tri-cone), soil densification, vibro floatation and wick drains. 1 Operator, 1 Pile Driver/Bridgeworker
Appears in 3 contracts
Samples: Standard Agreement, Standard Agreement, Standard Agreement
CREWS. The minimum number of workers required to form a crew shall be as follows:
a) Pile driver; water rig, fixed leads, donkey powered:
b) Pile driver; skid rig, donkey powered:
c) Pile driver; floating xxxxxxx rigxxx, on-board fixed or mobile crane, with A-frame or moonbeam leads or hanging leads from boom:
d) Pile driver; on land, crawler or truck crane:
e) Pile driver; on land, compactor rig:
f) Pile driver; on land, Franki Xxxxxx rig:
g) All drilling applications
h) Air-trac or churn drill when used for foundation piles, on land or water.
i) Rotary drill rig (auger or tri-cone), soil densification, vibro floatation and wick drains.
1 Operator, 1 Pile Driver/Bridgeworker
Appears in 1 contract
Samples: Standard Agreement