Cutting Unit Boundary Designation Table Sample Clauses

Cutting Unit Boundary Designation Table. Marked boundary trees shall not be cut. Discernable Boundaries are boundary locations that are readily identifiable features on the ground in locations shown on the Contract Area Map. A Geo-Fence is a location on the ground corresponding to the boundary location shown on a mobile mapping device using a Global Positioning System (GPS) Receiver using the digital vector file/shapefile named SolomonDxPIRTCStewardship_Geo-FenceBoundaries and dated 08/25/2022 . The digital vector file/shapefile will be provided to the Contractor by the Forest Service. A digital list of the coordinates can be provided upon request. Included Timber is located within and not past the boundary as shown on the mobile mapping device using the digital vector file/shapefile listed above. Contractor is responsible for obtaining a GPS receiver(s) that is capable of determining the location of the true Geo-Fence within the contract tolerance. Allowable contract tolerance is 40 feet. Forest Service inspection of cutting Included Timber to determine if cutting is within allowable contract tolerance, shall use the digital vector file/shapefile named and dated above using a GPS Receiver with a minimum, tested accuracy in a Light-Medium canopy of 20 feet. National Technology Development Program GPS Receiver accuracy reports by GPS manufacturer and model are available at: xxxxx://xxx.xx.xxx.xx/database/gps/mtdcrept/accuracy/index.htm. Forest Service determination of boundary location will be final. As an operational convenience and subject to written agreement by the Forest Service, in advance of marking, Contractor may mark Geo-Fence boundaries on the ground with Contractor's non-tracer paint. Boundary trees shall not be identified with paint applied below xxxxx height. Contractor shall bear all costs associated with painting used to visually identify boundaries. Forest Service will not approve or accept the boundaries identified on the ground by the Contractor in advance of cutting. In case of a major disruption in GPS service, or lack of GPS coverage on the Contract Area beyond the control of the Contractor, as determined by the Contracting Officer, the Contractor's only remedy shall be Contract Term Adjustment under B8.21. Qualification requirements are described in B8.21. To resolve major disruption of GPS service, or lack of GPS coverage on the Sale Area, the Forest Service may elect to Mark Geo-Fence boundaries on the ground, in which case the Forest Service's determination of boundary lo...
AutoNDA by SimpleDocs
Cutting Unit Boundary Designation Table. Cutting Units Paint Color Designation All Orange Vertical line of paint on 2 sides of boundary trees with a dot between and an additional xxxxx xxxx. Single dot faces the area to be cut. Approximately every 5th Boundary Tree has the cutting unit number painted on it. C3.34 - EMERGENCY RATE REDETERMINATION (06/2022) Forest Service shall redetermine rates for each species if, upon Contractor's application, Forest Service determines that, because of changes in the timber market since the award date or the last rate redetermination under this provision, the Producer Price Index identified in A20 has declined by 25 percent or more. Rates shall be redetermined under B3.3 and for species where the rates declined, shall be considered established under B3.1 for timber Scaled after Contractor's application. Increases in species rates will not be considered. This provision shall not apply during the period of a Contract Term Extension. C4.213 - PERIODIC PAYMENT SCHEDULE. (07/2022) Contractor shall make periodic payments for stumpage value, as shown in A19. If Contractor has not paid the amount(s) stated in A19 as stumpage for volume removed by the periodic payment determination date(s), Forest Service shall issue a bill for collection for the difference between the required amount and payments made by Contractor. If payment(s) fall due on a date other than a normal billing date, the payment date shall be extended to coincide with the next Integrated Resource Account billing date. The amount of the periodic payment(s) will be reduced if the payment(s) would result in Contractor's credit balance for timber charges exceeding the sum of the product value estimated remaining unscaled volumes of Included Timber meeting Utilization Standards. Only cash may be used for this purpose. No other form of payment is acceptable. Forest Service will apply the payments to subsequent charges on this contract under the terms of B4.212. Periodic payment amount(s) shown in A19 will be redetermined when periodic payment amounts have not been reached at time of rate redetermination under B3.3. When shown in A19, the initial periodic payment will be equal to 35 percent of the total redetermined contract value or 50 percent of the total bid premium amount, whichever is greater, plus the total value of timber scaled prior to establishing redetermined rates. The additional periodic payment will be equal to 75 percent of the total redetermined contract value, plus the total value of timber scal...
Cutting Unit Boundary Designation Table. Cutting Unit Paint Color Designation All Orange 2 stripes extending from ground to a height of 6 feet on either side of the tree parallel to the boundary line. A 3rd mark will be made facing into the unit consisting of a large dot at eye level, with the unit number just below it. 1,2,3, and 5 None Portion of cutting unit boundary follows NFSR 101.2B. See Sale Area Map.

Related to Cutting Unit Boundary Designation Table

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Transfer and Seniority Outside the Bargaining Unit (a) It is understood that an employee shall not be transferred by the Hospital to a position outside the bargaining unit without his consent except in the case of temporary assignments not exceeding six (6) months. Such employees on temporary assignments shall remain members of the bargaining unit.

  • Training Designation Type Code Select and insert the appropriate training credit designation type code: Code Short Description Long Description (If Applicable) 01 Undergraduate Credit N/A 02 Graduate Credit N/A 03 Continuing Education Unit N/A 04 Post Graduate Credit N/A 05 N/A N/A

  • Certification of Meeting or Exceeding Tobacco-Free Workplace Policy Minimum Standards A. Grantee certifies that it has adopted and enforces a Tobacco-Free Workplace Policy that meets or exceeds all of the following minimum standards of:

  • Venue Limitation for TIPS Sales Vendor agrees that if any "Venue" provision is included in any TIPS Sale Agreement/contract between Vendor and a TIPS Member, that clause must provide that the "Venue" for any litigation or alternative dispute resolution shall be in the state and county where the TIPS Member operates unless the TIPS Member expressly agrees otherwise. Any TIPS Sale Supplemental Agreement containing a “Venue” clause that conflicts with these terms is rendered void and unenforceable.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Transfer and Seniority Outside Bargaining Unit No employee shall be transferred to a position outside the bargaining unit without his consent. If an employee is transferred to a position outside of the bargaining unit, he shall retain his seniority accumulated up to the date of leaving the unit, but will not accumulate any further seniority. If such an employee returns to the bargaining unit within twelve (12) months, he shall be placed in a job consistent with his seniority. Such return shall not result in the layoff or bumping of an employee holding greater seniority.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Timber Designations Timber designated for cutting shall be confined to Sale Area, except as provided in B2.131, B2.14, B2.15, B2.32, and B5.1. Sale Area Map indicates subdivisions, if any, where Marking under B2.35 is to be done after timber sale advertisement, except for construction clearing under B2.32, minor changes under B2.37, and damaged timber. The boundaries of Clearcutting Units, Overstory Re- moval Units, and Understory Removal Units were plainly Marked on ground before timber sale advertisement and are shown on Sale Area Map. Boundary trees shall not be cut. The number of units and approximate acreage of timber designations are stated in A3.

  • Separation of Components The SOFTWARE PRODUCT is licensed as a single product. Its component parts may not be separated for use on more than one computer.

Time is Money Join Law Insider Premium to draft better contracts faster.