DESCRIPTION OF PROJECT & UNITS Sample Clauses

DESCRIPTION OF PROJECT & UNITS. The following describes the Project and Units to be constructed, operated and maintained by Seller through the Term in accordance with the Agreement. Project name: ___________________________ [PG&E Drafting Note: PG&E to update for Project technologies other than energy storage Energy storage] technology of Units: _________ Physical Location and Point of Interconnection: CAISO transmission access charge area (e.g. PG&E): Point of interconnection: APPENDIX II-B. PROJECT SIZE Aggregate nameplate capacity: ___ MW APPENDIX II-C. – SELLER’S PORTFOLIO LIST as of _[insert relevant date for each submittal]_ Customer Service Account Number Customer name Physical address of Site Total Unit capacity installed as part of the Project Unit capacity installed to meet capacity associated with Operational Characteristics (no SGIP funds) Unit capacity installed in excess of capacity associated with Operational Characteristics (Specify if SGIP is used) Unit manufacturer(s) and model number(s) installed at Site with corresponding Unit capacity CAISO Resource ID Sub-LAP By submitting this Seller’s Portfolio List to Buyer, Seller attests as of the date signed below, that all of the information is accurate and that the Customers and Units comprising Seller’s Portfolio List are in compliance with the terms of the Agreement. Signature: Name: Title: Date: APPENDIX III OPERATIONAL CHARACTERISTICS [PG&E Drafting Note: PG&E to update for Project technologies other than energy storage] The following describes the Operational Characteristics to determine the amount of Capacity Attributes of the Product. Physical Location and Point of Interconnection CAISO transmission access charge area (e.g. PG&E): Shall be as set forth in Appendix II-A Sub-LAP(s): weightings to be set in accordance with Seller’s Initial Portfolio List Point of interconnection: Shall be as set forth in Appendix II-A Discharging and Charging Maximum continuous discharge power (Dmax): ___ MW Minimum continuous discharge power (Dmin): ___ MW Maximum discharge duration at constant Dmax : ___ hours Maximum continuous charge power (Cmax): ____ MW Minimum continuous charge power (Cmin): ____ MW Maximum charge duration at constant Cmax: ___ hours Amount of Energy released to fully discharge: ___ MWh Amount of Energy required to fully charge: ___ MWh Round-trip efficiency: ______________ %
AutoNDA by SimpleDocs
DESCRIPTION OF PROJECT & UNITS. The following describes the Project and Units to be constructed, operated and maintained by Seller through the Term in accordance with the Agreement.
DESCRIPTION OF PROJECT & UNITS. The following describes the Project to be constructed, operated and maintained by Seller through the Term in accordance with the Agreement. [ ] Energy Efficiency [ ] Demand Response [ ] Behind-the-Meter renewable generation [ ] In Front of the Meter renewable generation [ ] Behind-the-Meter Storage [ X ] In Front of the Meter Storage [ ] Electric Vehicles PROJECT DESCRIPTION: [Note: description fields to be revised as applicable for the technology and project type specified] Project name: Project Site name: Project physical address: Project latitude: Project longitude: Technology type: Minimum Stored Amount: MWh Minimum Discharging Duration: hours INTERCONNECTION: The point of interconnection for the Project is described as follows: The Distributed Resources that compose the Project shall each be interconnected to circuits or loads or associated with load facilities that are electrically interconnected to one or more of the following: [Insert] SITE/CUSTOMER LIST: Proposed Site/Customer List: The Proposed Site/Customer List shall be provided in a CalTRACK csv file format (as selected by Buyer) via Energy Insight and shall include all of the following information for each Project Customer: Contractor ID Project ID PG&E Customer Service Account ID Number (SAID) Customer Agreement Project Customer name, address and zip code Project Customer’s Baseline Period Description of Distributed Resource including all Proposed Measures Seller shall enter each Project Customer into PG&E’s Energy Insight database (“Energy Insight”) no later than 120 days prior to the Expected IDD. Site/Customer List: The Site/Customer List shall be provided in HPXML format or a CalTRACK csv file format (as selected by Buyer) via Energy Insight and shall include all of the following information for each Project Customer: Contractor ID Project ID PG&E Customer Service Account ID Number (SAID) Customer Agreement Project Customer name, address and zip code Project Customer’s Baseline Period Project Customer’s Intervention Period Description of Distributed Resource including all Installed Measures Seller shall enter each Project Customer into PG&E’s Energy Insight database (“Energy Insight”) no later than 60 days prior to the Expected IDD.
DESCRIPTION OF PROJECT & UNITS. The following describes the Project and Units to be constructed, operated and maintained by Seller through the Term in accordance with the Agreement. PROJECT DESCRIPTION Project name: Project Site name: Technology type: Project physical address: Project elevation: ___ feet above sea level Project latitude: ___ (decimal form) Project longitude: ___ (decimal form)
DESCRIPTION OF PROJECT & UNITS. The following describes the Project to be constructed, operated and maintained by Seller through the Term in accordance with the Agreement. [ ] Energy Efficiency [ ] Dispatchable Front fo the Meter Resources [ ] Dispatchable Behind the Meter Resources [Note: description fields to be revised as applicable for the technology and project type specified] INTERCONNECTION: The Distributed Resources that comprise the Project(s) shall each be interconnected to circuits or loads, or associated with load facilities, that are electrically interconnected to the following:
DESCRIPTION OF PROJECT & UNITS. The following describes the Project to be constructed, operated and maintained by Seller through the Term in accordance with the Agreement. [ ] In Front of the Meter renewable generation [] In Front of the Meter Storage [ ] [Seller insert Other] PROJECT DESCRIPTION: [Note: description fields to be revised as applicable for the technology and project type specified] Project name: Project Site name: Project physical address: Project latitude: Project longitude: Technology type: Minimum Stored Amount: MWh Minimum Discharging Duration: hours INTERCONNECTION: The point of interconnection for the Project is described as follows: The Distributed Resources that compose the Project shall each be interconnected to circuits or loads or associated with load facilities that are electrically interconnected to one or more of the following: [Insert]
DESCRIPTION OF PROJECT & UNITS. The following describes the Project to be constructed, operated and maintained by Seller through the Term in accordance with the Agreement. [ ] In Front of the Meter Generation [ ] In Front of the Meter Energy Storage [ ] In Front of the Meter Renewable Generation [ ] Behind-the-Meter Storage [ ] Demand Response [ ] Energy Efficiency Project name: Project Site name: Project physical address: Project latitude: Project longitude: Technology type: Minimum Stored Amount: MWh Minimum Discharging Duration: hours [EACH PROJECT DESCRIPTION TO BE DEVELOPED TO DEPICT RESOURCES, INTERCONNECTION POINTS, AND INITIAL SITE LIST AND/OR CUSTOMER LIST] The resources that compose the Project shall each be interconnected to circuits or loads or associated with load facilities that are electrically interconnected to one or more of the following: [to be inserted.] The Project’s Communications Systems shall be designed and installed as follows: [to be inserted.]
AutoNDA by SimpleDocs

Related to DESCRIPTION OF PROJECT & UNITS

  • DESCRIPTION OF PROJECT The project for which PSP agrees to provide Professional Services is generally described as [Insert Brief Description of Project] (hereinafter referred to as the “Project”), as further described in Exhibit A, PSP’s Proposal dated [Insert Date and Proposal Number if provided], attached hereto and incorporated herein for all purposes and consisting of [Text] (Insert Number) pages.

  • Description of Projects Services

  • Description of Property A narrative description of the Real Estate, the improvements thereon and the tenants and Leases relating to such Real Estate.

  • Description of Program This Agreement is established to facilitate an exchange program at the partner institution with students, faculty and researchers from each institution (collectively, the “Exchange Program”). The student exchange program enables students from one university to take classes at the other university while working towards a degree at the university where he or she is formally enrolled (individually, the “Student Exchange”) and to encourage faculty members and researchers from each university to visit the other university and engage in certain activities (individually, the “Faculty/Researcher Exchange”). [Substitute the purpose of your program if different.] For purposes of this Agreement, with respect to the Student Exchange, the term “Home University” shall mean the institution in which a student is formally enrolled as a degree candidate, and “Host University” shall mean the institution that has agreed to receive students from the Home University for a period of study. With respect to the Faculty/Researcher Exchange, as used herein, “Home University” shall mean the university where the faculty member and/or researcher is normally employed, and “Host University” shall mean the university that the faculty member and/or researcher is visiting.

  • Description of Processing Include a description of how the disclosed information will be processed by each receiving party.

  • Completion of Project The Borrower shall carry out the Project in accordance with the Technical Description as may be modified from time to time with the approval of the Bank, and complete it by the final date specified therein.

  • Construction of Project 11.1.1 Developer agrees to cause the Project to be developed, constructed, and installed in accordance with the terms hereof and the Construction Provisions set forth in Exhibit D, including those things reasonably inferred from the Contract Documents as being within the scope of the Project and necessary to produce the stated result even though no mention is made in the Contract Documents.

  • Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)

  • DESCRIPTION OF PREMISES Landlord does hereby demise, lease and let unto Tenant, and Tenant does hereby take and receive from Landlord the following:

  • Recognition and Unit Description 1.1. The Employer recognizes the Association, which shall serve as exclusive Representative of all classified employees in the bargaining unit. The Association recognizes the responsibility of representing the interest of all employees in the unit without discrimination for the purpose as set forth in this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!