Design and Construction of Facilities Sample Clauses

Design and Construction of Facilities. The DEVELOPER at its own cost and expense shall cause to be designed, constructed and installed all of the necessary water and/or sewer facilities provided for in this Agreement unless otherwise specified. The facilities shall include any and all water mains, valves, fittings, fire hydrants, firelines, service connections, service lines, shutoffs, meter boxes, air release valves, gravity sewer mains, laterals, manholes, and all appurtenances thereto for a complete installation. The final design and construction of the facilities shall meet the requirements set forth in the latest revision of the DEPARTMENT'S "Rules and Regulations" for water and/or sewer service, shall be in accordance with the latest revision of the DEPARTMENT’S "Design and Construction Standard Specifications and Details", and shall be subject to approval by the DEPARTMENT.
AutoNDA by SimpleDocs
Design and Construction of Facilities. As a condition of receiving wastewater service from TOWN, COMMUNITY shall perform or cause to be performed the design, permitting and installation of a sewer force main line and the Collection and Transmission Facilities as more specifically shown in Exhibit “B” attached to and incorporated herein by reference. The COMMUNITY shall also install a single submerged magnetic flow meter capable of measuring wastewater flow to be conveyed to the Town at a point specified by the Town. The Collection and Transmission Facilities shall be designed, constructed and installed pursuant to utility standards identified in the TOWN’s rules, regulations, resolutions, ordinances, manuals of practice, land development code, and TOWN approved plans.
Design and Construction of Facilities. The goal of this task is to provide engineering design and construction services for the APH demonstration site. Demonstration shall be in an IOU electric service territory and at a site that is an IOU customer. The Recipient shall: • Determine best project delivery approach (such as Design/Bid/Build or Progressive Design/Build with GMP, etc.). • Perform engineering design for a minimum of 50 kW APH system at the demonstration site for a minimum of 10-hour discharge period. • Provide construction management and inspection services, including record documents and adjustments made during construction. • Develop and execute a Commissioning Plan with consultation from the CAM and the TAC • Develop and execute an Operations and System Test Plan to cover 12 months with consultation from the CAM and the TAC.
Design and Construction of Facilities. Section FP-4.1 -
Design and Construction of Facilities. As a condition of receiving wastewater service from TOWN, DEVELOPER shall perform or cause to be performed the design, permitting and installation of a sewer force main line consisting of approximately _______________ (_____) linear feet of 6 inch diameter pipe, a lift station, and associated facilities as more specifically shown in Exhibit “B” attached to and incorporated herein by reference (“Transmission Facilities”). The DEVELOPER shall also install a submerged magnetic flow meter capable of measuring Sewage flow to be conveyed to the Town at a point specified by the Town. The Transmission Facilities shall be designed, constructed and installed pursuant to utility standards identified in the TOWN’s rules, regulations, resolutions, ordinances, manuals of practice, land development code, and TOWN approved plans.
Design and Construction of Facilities. As a condition of receiving wastewater service from TOWN, COMMUNITY shall perform or cause to be performed the design, permitting and installation of a sewer force main line consisting of approximately ( ) linear feet of 4 inch diameter pipe, and the Collection and Transmission Facilities as more specifically shown in Exhibit “B” attached to and incorporated herein by reference. The COMMUNITY shall also install a single submerged magnetic flow meter capable of measuring wastewater flow to be conveyed to the Town at a point specified by the Town. The Collection and Transmission Facilities shall be designed, constructed and installed pursuant to utility standards identified in the TOWN’s rules, regulations, resolutions, ordinances, manuals of practice, land development code, and TOWN approved plans.
Design and Construction of Facilities 
AutoNDA by SimpleDocs

Related to Design and Construction of Facilities

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!