Design Development Changes Sample Clauses

Design Development Changes. Where, in connection with the design development procedure described in Schedule 4 [Design and Construction Protocols], the Parties agree to utilize an alternate procedure for agreeing on and tracking Changes that: (a) on an individual basis, have an estimated value of less than $2,000,000, including “no cost” Changes; (b) on a cumulative basis, have an estimated value of less than $40,000,000, including “no cost” Changes; and (c) do not result in a change in the Target Phase 1 Construction Completion Date, the Target ICS Integration Ready Date, the Target Stony Plain Road Bridge Availability Date, the Target ICS Integration Ready Date, the Target Construction Completion Date or any other Key Date (each a “Design Development Change”), the Parties may, on an individual Change basis, agree to utilize the process set out in Section 5.3 [Design Development Change Process], rather than the processes set out in Section 2 [Change Enquiry Process] or Section 3 [Change Directive Process] of this Schedule 13 [Changes].
AutoNDA by SimpleDocs
Design Development Changes. Where, in connection with the design development procedure described in Schedule 4 [Design and Construction Protocols], including any variance requests pursuant to the HFDG, the Parties agree to utilize an alternate procedure for agreeing on and tracking Changes that: (a) on an individual basis, have an estimated value of less than $2,000,000, including “no cost” Changes; and (b) do not result in a change, on an individual or cumulative basis, in any Key Date (each a “Design Development Change”), the Parties may, on an individual Change basis, agree to utilize the process set out in Section 5.3 [Design Development Change Process], rather than the processes set out in Section 2 [Change Enquiry Process] or Section 3 [Change Directive Process].

Related to Design Development Changes

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Project Development a. Collaborate with COUNTY and project clients to identify requirements and develop a project Scope Statement. a. Develop a Work Breakdown Structure (WBS) for each project. b. Evaluate Scope Statement to develop a preliminary cost estimate and determinate whether project be vendor bid or be executed under a Job Order Contract (JOC).

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Development Schedule The Project shall substantially comply with the specific timetables and triggers for action set forth in Article 5 of this Agreement. The parties acknowledge that, as provided in G.S. 160A-400.25(b), the failure to meet a commencement or completion date shall not, in and of itself, constitute a material breach of this Agreement pursuant to G.S. 160A-400.27 but must be judged based upon the totality of the circumstances.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Design Criteria A/E shall prepare all work in accordance with the latest version of applicable County’s procedures, specifications, manuals, guidelines, standard drawings, and standard specifications. A/E shall prepare each Plans, Specifications, and Estimates (PS&E) package in a form suitable for letting through County’s construction contract bidding and awarding process.