Design of the first Delphi round. Nanomaterial use is diverse and difficult to speak of in regulatory terms as one kind of material or use, therefore the structure of this first round was set up to explore variation in opinions of risk management adequacy when considering specific classes of material use and material types. During the discussions with the Core Group it was agreed that the first round would ask questions focussing on six MNMs that were considered in the NanoReg project; titanium dioxide, carbon nanotubes, silicon dioxide, barium sulphate, cerium oxide and silver. From discussions, edits and feedback it was agreed that the first Delphi round survey would consist of the following 4 main sections: 1) General information This section aimed to collect general information about participants in relation to the region and sector in which they work. 2) General risk assessment/management The general risk assessment/management section asked participants more specifically about their knowledge of use and management for the six MNMs, where SbD is already in use and what actions would be most effective to improve ability for this. 3) Current uses and risk management for selected MNM There were six subsections on current uses and risk management. Each of these subsections asked the same question set on exposure, toxicity and risk assessment/management; however each subsection focused on a different MNM. 4) Safety and innovation The safety and innovation section of this Delphi round was focused towards industry participants, asking questions on innovation models and information needs along the innovation process so that priorities for supporting adaptive risk governance could be evaluated. These questions in the final section and the results from these were collected on behalf of NanoReg. The structure and number of questions in each of these sections and subsections are presented in Table 1 and the full set of questions is available in Appendix 2.
AutoNDA by SimpleDocs

Related to Design of the first Delphi round

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • C-TPAT In connection with providing Goods and Services to AGILENT, Seller shall comply with Customs-Trade Partnership Against Terrorism (C- TPAT) or equivalent supply chain security measures. When requested by AGILENT, Seller shall demonstrate compliance by providing certification thereof to AGILENT.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Staffing There shall be a clinician employed by the outside contractor for EAP Services who will be on-site a minimum of 20 hours a week. The clinician shall report directly to the outside contractor, Peer Assistance Oversight Committee and the MIF liaison. There shall be three full-time Peer Assistants reporting to the outside contractor.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • STS-1 Loop STS-1 Loop is a high-capacity digital transmission path with SONET VT1.5 mapping that is dedicated for the use of the ordering customer for the purpose of provisioning local exchange and associated exchange access services. It is a two-point digital transmission path which provides for simultaneous two-way transmission of serial bipolar return-to-zero synchronous digital electrical signals at a transmission rate of 51.84 Mbps. It may provide transport for twenty-eight (28) DS1 channels, each of which provides the digital equivalent of twenty-four (24) analog voice grade channels. The interface to unbundled dedicated STS-1 transport is a metallic-based electrical interface.

  • Project Management Project Management Institute (PMI) certified project manager executing any or all of the following: • Development of Project Charter • Development of project plan and schedule • Coordination and scheduling of project activities across customer and functional areas • Consultation on operational and infrastructure requirements, standards and configurations • Facilitate project status meetings • Timely project status reporting • Address project issues with functional areas and management • Escalation of significant issues to customers and executive management • Manage project scope and deliverable requirements • Document changes to project scope and schedule • Facilitate and document project closeout

  • Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.

  • Level Four A. If within ten (10) school days following the formal third step the Association submits a request to the Superintendent to enter into arbitration, the Superintendent and the Association shall attempt to agree upon a mutually acceptable arbitrator and shall obtain a commitment from said arbitrator to serve. If the parties are unable to agree upon an arbitrator or to obtain such a commitment within ten (10) school days, a written request for a list of arbitrators shall be made to the Public Employment Relations Board (PERB) by either party. The list shall consist of seven (7) potential arbitrators and the parties shall determine by lot which party shall have the right to remove the first name from the list. The party having the right to remove the first name shall do so within two (2) school days. Then the parties shall have one (1) school day alternately to remove until one (1) name remains. The person whose name remains shall be the arbitrator. B. The arbitrator so selected shall confer with the Superintendent and the Association and hold hearings promptly and shall issue his/her decision not later than fifteen (15) school days from the date of the close of the hearings, or, if oral hearings have been waived, then from the date the final statements and proofs on the issues are submitted to him/her. The arbitrator's decision shall be in writing and shall set forth his/her findings of fact, reasoning, and conclusions of the issues submitted. The arbitrator's decision shall have no power to alter, add to, or detract from the specific provisions of the Agreement. No decision of the arbitrator shall in any way be derogation of the powers, duties, and rights established in the Board by constitutional provisions, statue, ordinance, or special legislative acts. The decision of the arbitrator shall be submitted to the Superintendent and the Association and shall be final and binding on the parties. C. The costs of the services of the arbitrator will be borne equally by the Board and the Association. D. If the grievant files any claim or complaint in any forum other than under the grievance procedure of this Master Contract Agreement, then the school district shall not be required to process the same claim or set of facts through this grievance procedure.