Documents for Owner Review. In addition to any other documents which Contractor is required by the other provisions of the Agreement to provide for Owner’s review, Contractor shall submit copies of the following documents, Drawings and Specifications to Owner for review and comment. These documents are not subject to Owner approval; however, Contractor will consider all Owner comments consistent with Attachment A, including the Basis of Design, Design Criteria/Basis, Feed Documents and Drawings and Specifications updated during performance of the Work. In addition, Owner may select other documents with the agreement of Contractor. a. Process flow diagrams (PFDs) b. Heat and material balances c. Piping and Instrument Diagrams (P&IDs) d. New HAZOP reports and disposition of HAZOP/SIL action items identified in the FEED Documents e. Plot plans f. Fire and gas detector layouts g. Fire monitor water radius layouts h. Tie-In location drawing i. Electrical area classification drawings j. Building layouts k. Material selection diagrams l. Facility Performance Test reports m. Piping Specifications n. Underground piping plans
AutoNDA by SimpleDocs
Documents for Owner Review. In addition to any other documents which Contractor is required by the other provisions of the Agreement to provide for Owner’s review, Contractor shall submit copies of the following documents, Drawings and Specifications to Owner for review and comment. These documents are not subject to Owner approval; however, Contractor will consider all Owner comments consistent with Attachment A, including the Basis of Design, Design Criteria/Basis, Feed Documents and Drawings and Specifications updated during performance of the Work. In addition, Owner may select other documents with the agreement of Contractor. a. Process flow diagrams (PFDs)
Documents for Owner Review. In addition to any other documents which Contractor is required by the other provisions of the Agreement to provide for Owner’s review, Contractor shall submit copies of the following documents, Drawings and Specifications to Owner for review and comment. These documents are not subject to Owner approval; Contractor will consider all Owner comments consistent with Attachment 1, including the Basis of Design, Design Criteria/Basis, Feed Documents and Drawings and Specifications updated during performance of the Work. In addition, Owner may select other documents with the agreement of Contractor, such agreement not to be unreasonably withheld. a. Process flow diagrams (PFDs) b. Heat and material balances c. Piping and Instrument Diagrams (P&IDs) d. HAZOP reports and disposition of HAZOP/LOPA action items identified for Phase 2 work which is not replicated from Phase 1 e. Plot plans f. Fire and gas detector layouts g. Fire monitor water radius layouts h. Tie-In location drawing i. Electrical area classification drawings j. Building layouts k. Material selection diagrams l. Facility Performance Test reports m. Piping Specifications n. Underground piping plans
Documents for Owner Review. In addition to any other documents which Contractor is required by the other provisions of the Agreement to provide for Owner’s review, Contractor shall submit copies of the following documents, Drawings and Specifications to Owner for review and comment. These documents are not subject to Owner approval; however, Contractor will consider all Owner comments. In addition, Owner may select other documents with the agreement of Contractor. a. Piping Specifications b. Underground piping plans c. 3-D model d. Equipment lists e. Electrical one-line diagrams f. Minutes and reports of HAZOP reviews and management of change reviews g. Minutes and reports of safety integrity level (SIL) meetings h. Key plans i. Electrical area classification Drawings j. Equipment data sheets k. Equipment Specifications l. Standard detail Drawings m. Corrosion control Specifications n. Painting and coating Specifications and charts o. Insulation system Specifications p. Technical evaluation for all materials and Equipment q. Acceptance test procedures for all Major Equipment and packages.

Related to Documents for Owner Review

  • Instructions for Operators This agreement is intended to be provided to an Operator from a LEA. The Operator should fully read the agreement and is requested to complete the below areas of the agreement. Once the Operator accepts the terms of the agreement, the Operator should wet sign the agreement and return it to the LEA. Once the LEA signs the agreement, the LEA should provide a signed copy of the agreement to the Operator. Cover Page Box # 3 Official Name of Operator Cover Page Box # 4 Date Signed by Operator Recitals Box #5 Contract Title for Service Agreement Recitals Box #6 Date of Service Agreement Article 7 Boxes #7-10 Operator’s designated representative Signature Page Boxes #15-19 Authorized Operator’s representative signature Exhibit A Box #25 Description of services provided Exhibit B All Applicable Boxes  Operator notates if data is collected to provide the described services.  Defines the schedule of data required for the Operator to provide the services outlined in Exhibit A Exhibit D All Applicable Boxes (Optional Exhibit): Defines deletion or return of data expectations by LEA Exhibit E All Applicable Boxes (Optional Exhibit): Operator may, by signing the Form of General Offer of Privacy Terms (General Offer, attached as Exhibit E), be bound by the terms of this DPA to any other Subscribing LEA who signs the acceptance in said Exhibit. Exhibit F Boxes # 25-29 A list of all Subprocessors used by the Operator to perform functions pursuant to the Service Agreement, list security programs and measures, list Operator’s security measures

  • Requirements for E- Bidders 3.1. For Individual/ Joint E-Bidders, the following documents shall be uploaded during online registration; 3.1.1. Copy of Identification Documents (both sides) 3.1.2. Evidence of deposit payment 3.2. For Agent acting for Individual/ Joint Online Bidders, the following documents shall be uploaded during online registration; 3.2.1. Copy of Identification Documents (both sides) of Individual/ Joint Online Bidder 3.2.2. Copy of Identification Documents (both sides) of Agent 3.2.3. Copy of letter of authorization to bid 3.2.4. Evidence of deposit payment 3.3. For Company, the following documents shall be uploaded during online registration: 3.3.1. Copy of Identification Documents (both sides) of the representative. 3.3.2. Copy of letter of authorization to bid under the Company’s Letter Head 3.3.3. Form 24; Form 44; Form 49 (or their equivalent forms under the Companies Act 2016)

  • Certification Regarding Entire TIPS Agreement for Part 1 and Part 2 Contracts 5 This is a two part solicitation. Part 1 is solicited for TIPS sales that are not considered a "public work" construction (1) The TIPS solicitation document resulting in the Agreement; (2) Any addenda or clarifications issued in relation to the corresponding TIPS solicitation; (3) All solicitation information provided to Vendor by TIPS through the TIPS eBid System; (3) Vendor’s entire proposal response to the corresponding TIPS solicitation including all accepted required attachments, acknowledged notices and certifications, accepted negotiated terms, accepted pricing, accepted responses to questions, and accepted written clarifications of Vendor’s proposal, and; any properly included attachments to the TIPS Contract. Does Vendor agree? Yes, Vendor agrees TIPS Members often turn to TIPS Contracts for ease of use and to receive discounted pricing. Vendor must respond with a percentage from 0%-100%. The percentage discount that you input below will be applied to your Part 1 "Catalog Pricing", as defined in the solicitation, for all TIPS Sales made during the life of the contract. You cannot alter this percentage discount once the solicitation legally closes. You will always be required to discount every TIPS Sale by the percentage included below with the exception of limited goods/services specifically identified and excluded from this discount in Vendor’s original proposal. If you add goods or services to your "Catalog Pricing" during the life of the contract, you will be required to sell those new items with this discount applied.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • PROGRESS SCHEDULE The Contractor, within ten (10) working days of receiving notice of the award of the contract, shall prepare and submit for the State's and Architect's information an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

  • Construction Reports Each Constructing Entity shall issue reports to each other Construction Party on a monthly basis, and at such other times as reasonably requested, regarding the status of the construction and installation of the Interconnection Facilities. Each Construction Party shall promptly identify, and shall notify each other Construction Party of, any event that the Construction Party reasonably expects may delay completion, or may significantly increase the cost, of the Interconnection Facilities. Should a Construction Party report such an event, Transmission Provider shall, within fifteen days of such notification, convene a technical meeting of the Construction Parties to evaluate schedule alternatives.

  • Project Reports The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators agreed with the Association. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Association not later than one month after the end of the period covered by such report.

  • Lost Shareholder Due Diligence Searches and Servicing The Trust hereby acknowledges that USBFS has an arrangement with an outside vendor to conduct lost shareholder searches required by Rule 17Ad-17 under the Securities Exchange Act of 1934, as amended. Costs associated with such searches will be passed through to the Trust as an out-of-pocket expense in accordance with the fee schedule set forth in Exhibit C hereto. If a shareholder remains lost and the shareholder’s account unresolved after completion of the mandatory Rule 17Ad-17 search, the Trust hereby authorizes vendor to enter, at its discretion, into fee sharing arrangements with the lost shareholder (or such lost shareholder’s representative or executor) to conduct a more in-depth search in order to locate the lost shareholder before the shareholder’s assets escheat to the applicable state. The Trust hereby acknowledges that USBFS is not a party to these arrangements and does not receive any revenue sharing or other fees relating to these arrangements. Furthermore, the Trust hereby acknowledges that vendor may receive up to 35% of the lost shareholder’s assets as compensation for its efforts in locating the lost shareholder.

  • Inspection Checklist (Check one)

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.