Drains (Sheughs Sample Clauses

Drains (Sheughs. It is difficult to distinguish sheughs from the ortho. There may be LPS LS lines, denoted as drains which will be treated as sheughs. Sheughs tend to be positioned on one side of a RWF such as a hedge and where this occurs the hedge is taken as the field boundary (figure 4). The following rules are to be applied to LPS LS lines, represented as a single line denoted as drains: 2.4.5.1 Where the only RWF is a single fence adjacent to the drain, it will be treated as a protection fence and the boundary is on the LPS LS line representing the drain. 2.4.5.2 Where there are two fences either side of the drain and the DARD field boundary is placed on or near one fence, it is aligned to that fence, the other is treated as a protection fence. 2.4.5.3 Where there are two fences either side of the drain and there is currently a DARD field boundary placed on or near each fence, these are aligned to each fence. 2.4.5.4 Where the DARD field boundary is positioned on a drain as shown on the ortho or LPS LS and there is no RWF, it is retained. If the boundary needs to be corrected, place the boundary as near to the centre of the drain as possible, as shown on the ortho. The following rules are to be applied to LPS LS lines, represented as a 3 lines and denoted as drains: 2.4.5.5 Where the only RWF is a single fence adjacent to the drain, it will be treated as a protection fence and the boundary is on the LPS LS centre line of the drain. 2.4.5.6 Where there are two fences either side of the drain and the DARD field boundary is placed on or near one fence, it is aligned to that fence, the other is treated as a protection fence. 2.4.5.7 Where there are two fences either side of the drain and there is currently a DARD field boundary placed on or near each fence, these are aligned to each fence. 2.4.5.8 When a drain is shown on the ortho and currently there is no DARD field boundary, do
AutoNDA by SimpleDocs

Related to Drains (Sheughs

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Pendahuluan Industri perbankan syari’ah di Indonesia tengah memasuki fase growth (pertumbuhan) xxx sangat membutuhkan kepercayaan xxx loyalitas masyarakat untuk terus meningkatkan produktivitasnya. Kepercayaan xxx loyalitas mutlak dibutuhkan untuk memasuki fase maturity perbankan syariah dalam menghadapi kompetisi global. Kepercayaan xxx loyalitas tidak dapat diperoleh tanpa adanya produk- produk yang mampu menjawab kebutuhan masyarakat. Produk bank syariah sudah semestinya mampu memenuhi seluruh komponen masyarakat, baik dalam produk funding, financing, xxx services. Oleh karenanya, inovasi produk bank syariah menjadi syarat mutlak sebagai indikator bahwa bank syariah mampu beradaptasi dengan kebutuhan manusia modern. Inovasi produk merupakan salah satu unsur penting untuk dapat menjaga sustainabilitas perusahaan. Inovasi produk merepresentasikan kemampuan perusahaan untuk dapat memenuhi kebutuhan pasar sekaligus sebagai upaya untuk memperoleh keuntungan perusahaan. Bank syariah pada dasarnya telah melakukan serangkaian upaya inovasi, salah satunya adalah dengan melakukan “rekayasa” (engineering) terhadap akad- akad dalam fiqh muamalah. Beberapa akad dalam fiqh muamalah tidak begitu saja diadopsi oleh perbankan syariah, namun juga “diadaptasikan” dengan kebutuhan masyarakat terhadap xxxx-xxxx perbankan. Rekayasa xxx adaptasi ini memang sebuah keniscayaan, karena jika adopsi dilakukan secara apa adanya maka produk bank syariah diragukan dapat memberikan manfaat yang tepat bagi masyarakat. Prinsip keleluasan bermuamalah dalam Islam merupakan modal utama untuk menghadapi kompleksitas permasalahan ekonomi serta besarnya tuntutan masyarakat akan peran perbankan syariah.1 Dalam rangka memenuhi kebutuhan masyarakat xxx mengembangkan industri perbankan xxx keuangan xxxx xxxx kompetitif, inovasi dalam berbisnis yang dilakukan oleh perbankan syariah melalui serangkaian adaptasi tersebut memang sudah menjadi tuntutan bisnis. Sebagai contoh dapat dikemukakan xxxxxx xxxx kartu kredit syariah, asuransi syariah, obligasi syariah, FX iB, xxx Islamic Swap. Produk-produk dalam kegiatan keuangan syariah tersebut mengandung beberapa akad. Sebagai contoh, dalam transaksi kartu kredit syariah terdapat akad ijarah, qardh, xxx kafalah. Obligasi syariah mengandung sekurang-kurangnya akad mudharabah (atau ijarah) xxx wakalah, serta terkadang disertai kafalah atau wa’d. Islamic swap mengandung beberapa kali akad tawarruq, bay‘, wakalah, xxxxx, xxx terkadang disertai wa’d.2 Dalam setiap transaksi, akad-akad tersebut dilakukan secara bersamaan atau setidak-tidaknya setiap akad yang terdapat dalam suatu produk tidak bisa ditinggalkan, karena kesemuanya merupakan satu kesatuan. Transaksi seperti 1 Xxxxxx Xxxxx Xxxxxx, “Konstruksi Akad dalam Pengembangan Produk Perbankan Syariah di Indonesia”, Al-‘Adalah, Vol. 12, No. 3 (Juni, 2015), 493. 2 Xxxxxxxxx Xxxxxxx, “Multiakad dalam Transaksi Syariah Kontemporer pada Lembaga Keuangan Syariah di Indonesia”, Al-Iqtishad, Vol. 3, No. 1 (Januari, 2011), 156. inilah yang dikenal dengan istilah multiakad (Indonesia) atau hybrid contract (Inggris) atau al-’uqud al-murakkabah (Arab). Hybrid contract merupakan perbincangan yang masih hangat dikalangan para cendikiawan muslim untuk menentukan keabsahan hukumnya. Pendapat pertama mengatakan hukumnya mubah berdasar kaidah fiqh al-ashlu fi al-mu’amalat al-ibahah (hukum asal muamalah adalah boleh). Pendapat kedua mengharamkan berdasarkan dengan hadits-hadits yang mengharamkan dua jual beli dalam satu jual beli (bai’ataini fi bai’atin), atau mengharamkan dua akad dalam satu akad (shafqatain fi shafqatin).3 Sebagai entitas bisnis yang menjadi bagian penting dalam sistem ekonomi syariah sebagai induknya, tentunya industri perbankan syariah tidak boleh keluar dari nilai-nilai syariah. Melakukan inovasi memang tuntutan bisnis, namun menjaga shariah compliance juga menjadi kewajiban bagi setiap pelaku bisnis syariah, tidak terkecuali perbankan syariah. Profit-oriented hanya boleh dijadikan sebagai media (tool) untuk mencapai tujuan (goal), yaitu benefit-oriented. Produk bank syari’ah seyogyanya memiliki multi benefit, yaitu: material benefit, emotional benefit, xxx spiritual benefit.4 Mengacu pada kondisi tersebut, maka inovasi produk perbankan syariah setidaknya memerhatikan inovasi dalam dua dimensi, yaitu dimensi ekonomi xxx dimensi sosial. Inovasi dalam dimensi ekonomi artinya bahwa produk perbankan syariah harus mampu menghadirkan produk yang sesuai dengan kebutuhan masyarakat, sehingga bank syariah menjadi pilihan utama masyarakat. Jika hal ini dapat dilakukan, maka fungsi-fungsi bank syariah akan mampu memainkan perannya sebagai intermediary institution. Pada dimensi sosial, sebagai produsen jasa keuangan syariah, bank syariah bertanggung jawab untuk melakukan edukasi terhadap perilaku masyarakat. Bank syariah xxx masyarakat xxxxxx melekat xxx memengaruhi satu dengan yang lain. Pada satu sisi, bank syariah melalui pola inovasinya harus mampu “men-syariah- kan” perilaku masyarakat, khususnya yang berhubungan dengan lembaga 3 Najamuddin, “Al-‘Uqud Al-Murakkabah dalam Perspektif Ekonomi Syariah”, Jurnal Syariah, Vol. 2, No. 2 (Oktober, 2013), 6.

  • Vlastnictví Zdravotnické zařízení si ponechá a bude uchovávat Zdravotní záznamy. Zdravotnické zařízení a Zkoušející převedou na Zadavatele veškerá svá práva, nároky a tituly, včetně práv duševního vlastnictví k Důvěrným informacím (ve smyslu níže uvedeném) a k jakýmkoli jiným Studijním datům a údajům.

  • Moonlighting Employment as a physician in a professional capacity outside of what is outlined in this Agreement, whether temporary special medical activity (“TSMA”) or external moonlighting, must be approved in writing, in advance, by the Departmental Chair, Program Director and Director of Graduate Medical Education (or designee). Even if approved, professional and general liability insurance as outlined in Section 5.4 is not provided to Trainee engaged in external moonlighting. Trainee acknowledges he or she has the responsibility to obtain insurance for such engagement. TSMA and external moonlighting must be included and reported as part of Trainee's hours spent on clinical experience and education. Trainee shall not be required to engage in any outside work.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • Platby In consideration for the proper performance of the Study by Site in compliance with the terms and conditions of this Agreement, payments shall be made in accordance with the provisions set forth in Attachment A, with the last payment being made after the Site completes all its obligations hereunder, and IQVIA has received all properly completed CRFs and, if IQVIA requests, all other Confidential Information (as defined below). V souvislosti s řádným plněním Studie Místem provádění klinického hodnocení, a to v souladu s podmínkami a ustanoveními této Smlouvy, budou poskytovány platby dle podmínek a ustanovení definovaných v Příloze A, přičemž poslední platba bude uskutečněna poté, co Místo provádění klinického hodnocení splní a dokončí veškeré závazky, jež mu vyplývají z této Smlouvy, a IQVIA obdrží veškeré řádně vyplněné CRF a, bude-li tak IQVIA vyžadovat, veškeré další Důvěrné informace The estimated value of financial payment under this Agreement shall be approximately CZK 903.042,-. DrugDev will receive Site invoices and process payments unless otherwise agreed. Any queries regarding Site invoices or payments should be directed to XxxxXxx at the contact details outlined in Attachment A. All payments will be made in favor of the Institution. (ve smyslu níže uvedené definice). Předpokládaná hodnota finančního plnění dle této Smlouvy činí přibližně 903.042,- Kč. Nebude-li ujednáno jinak, faktury od Místa provádění klinického hodnocení obdrží a platby bude zpracovávat společnost DrugDev. Veškeré dotazy ohledně faktur Místa provádění klinického hodnocení nebo plateb mají být adresovány společnosti DrugDev, jejíž kontaktní údaje jsou uvedeny v Příloze A. Veškeré platby budou uskutečněny ve prospěch Poskytovatele...

  • meminta nasihat daripada Pihak Xxxxxx dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik Xxxxx xxxxxx rasmi di Pejabat Tanah xxx/atau xxxx-xxxx Pihak-pihak Berkuasa yang berkenaan xxx (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja xxx juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya ("Pembeli") dikehendaki dengan segera memohon xxx mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju xxx/atau Pihak Tuanpunya xxx/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa xxx memastikan samada jualan ini dikenakan cukai. HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan HAKMILIK INDUK / NO. LOT : Pajakan Negeri 35263, Lot No.29096 MUKIM/DAERAH/NEGERI : Setapak / Kuala Lumpur / Wilayah Persekutuan Kuala Lumpur PEGANGAN : Pajakan selama 82-tahun berakhir pada 08/08/2085 KELUASAN LANTAI : 81.104 meter persegi ( 873 kaki persegi ) PEMAJU/PENJUAL : Mega Planner Jaya Sdn Bhd (326287-W)(Dalam Likuidasi) TUANPUNYA : Datuk Bandar Kuala Lumpur PEMBELI : Xxxxxxxx Bin Xxxxx @ Xxxx BEBANAN : Diserahhak kepada RHB Bank Berhad [196501000373 (6171-M)] Hartanah tersebut terletak di tingkat 9 pada bangunan apartment 14-tingkat terletak di Melati Impian Apartment, Setapak Fasa 1, Kuala Lumpur. Hartanah tersebut adalah sebuah unit apartment 3 xxxxx dikenali sebaga Xxxxx Pemaju No. 9, Tingkat No.9, Pembangunan dikenali sebagai Melati Impian Apartment Setapak Fasa 1, Kuala Lumpur xxx mempunyai alamat surat-xxxxxxxx xx Xxxx Xx. 0-0, Xxxxxx Impian Apartment, Xxxxx 0/00X, Xxxxx Xxxxxx, 00000 Xxxxx Xxxxxx, Xxxxxxx Xxxxxxxxxxx Xxxxx Xxxxxx. Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 300,000.00 (RINGGIT MALAYSIA: TIGA RATUS RIBU SAHAJA) xxx tertakluk kepada syarat-syarat Jualan xxx melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat xxx perjanjian yang dikenakan xxx mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi xxx mematuhi syarat-syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada xxx semua xxx xxx perbelanjaan ditanggung xxx dibayar oleh Xxxxx Xxxxxxx.Pembeli atas talian (online) juga tertakluk kepada terma-terma xxx syarat-syarat terkandung dalam xxx.xxxxxxxxxxxxxxxx.xxx Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Bank Berhad sebelum lelongan awam xxx xxxx xxxx xxxxxx hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Bank Berhad melalui Bank Draf / XXXXXX. Butir-butir pembayaran melalui XXXXXX, xxxx berhubung dengan Tetuan Zahrin Emrad & Sujaihah. Untuk maklumat lanjut, xxxx berhubung dengan TETUAN ZAHRIN EMRAD & SUJIAHAH, yang beralamat di Suite 10.3, 10th Floor, Xxx Xxxx Building, Xx.00, Xxxxx Xxxx Xxxxxx, 00000 Xxxxx Xxxxxx. Tel: 00-0000 0000 / Fax: 00-0000 0000. [ Ruj: ZES/ZHR/RHB-FC/16250-17/0614-pae ], peguamcara bagi pihak pemegang xxxxx xxx atau pelelong yang tersebut dibawah.

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!