Drawing Review Sample Clauses

Drawing Review. Upon a determination by the Connecting Transmission Owner that a package is complete, the Connecting Transmission Owner shall commence its review of such package. After completing its review of a package, the Connecting Transmission Owner shall send written notice to Developer detailing the deficiencies and non-conformance with the Connecting Transmission Owner’s criteria and specifications and applicable design requirements, and shall send copies of any relevant design criteria documents and information. After correcting any deficiencies and non-conformance, Developer shall submit revised design criteria information to the Connecting Transmission Owner for further review and acceptance.
AutoNDA by SimpleDocs
Drawing Review. The Consultant shall provide engineering services to complete a shop drawing review for bridge and structural component submittals.
Drawing Review. Review by Company of any drawing(s) submitted by Contractor is only to determine the general conformance with the design concepts and shall not relieve Contractor of its responsibility to comply with all requirements of the Contract and for the accuracy of the drawings or the materials fabricated from such drawings.
Drawing Review a) S-321: New metal bollards (protective pipe barriers) detail shall be surface mounted and bolted, not recessed as shown on Detail 3. Please let us know if you require any further information or clarification regarding our review and due diligence at this Permit Document Phase. Respectfully, Xxxxx Xxxxxxxx Senior Vice President HILLSBOROUGH COUNTY AVIATION AUTHORITY | GMP PROPOSAL | 1 RECLAIM LONG TERM PARKING GARAGE LEVELS 1 AND 2 Project No. 6505 17 | March 20, 2018 Qualifications & Assumptions The existing floors are named HV, BC and levels 1-6, but for the purpose of this proposal all floors will be named Levels 1-8.The scope of work generally consists of the renovation to the 1 and 2 levels at the LTPG. The existing rental car facilities will relocate into the new ConRAC facility and these levels will be converted back to public parking. At the Owner’s request, we have included several alternates for consideration based on overall costs. Further qualifications to this proposal are as follows;
Drawing Review. Final review of architectural drawings for fire protection and life safety issues.
Drawing Review. The Engineer shall review and approve all shop drawings provided by the State, prepared and submitted by the contractor or fabricator of materials and work related to the construction of this project.
Drawing Review. A. Drawings and documents submitted for PURCHASER’S review will be returned to SOIL CONTRACTOR with two (2) stickers on each document. One (1) sticker will indicate the equipment tag number and PURCHASER’S SOIL CONTRACTOR print Jog number. The second sticker will indicate, by xxxx, one (1) of the following review codes: Code 1 Work may proceed. Code 2 Revise and resubmit. Work may proceed subject to incorporation of changes indicated Code 2b Revise. Incorporate changes as indicated. Resubmittal not required. Work may proceed. Code 3 Revise and resubmit. Work may not proceed. Code 4 Review not required. Work may proceed. Although work may proceed on receipt of a drawing with a Code 2 notation, SOIL CONTRACTOR must resolve the comments indicated, resubmit and obtain a Code 1 notation. Any drawing or document receiving a review Code 2 or 3 must be resubmitted until it achieves either a Code 1 or 4 review status. Final invoice will not be processed until all drawings and documentation requirements are fulfilled.
AutoNDA by SimpleDocs
Drawing Review. A. Drawings and documents submitted for PURCHASER’S review will be returned to TANK CONTRACTOR with two (2) stickers on each document. One (1) sticker will indicate the equipment tag number and PURCHASER’S TANK CONTRACTOR print log number. The second sticker will indicate, by xxxx, one (1) of the following review codes:
Drawing Review a) S-321: New metal bollards (protective pipe barriers) detail shall be surface mounted and bolted, not recessed as shown on Detail 3. Please let us know if you require any further information or clarification regarding our review and due diligence at this Permit Document Phase. Respectfully, Xxxxx Xxxxxxxx Senior Vice President HILLSBOROUGH COUNTY AVIATION AUTHORITY | GMP PROPOSAL | 1 RECLAIM LONG TERM PARKING GARAGE LEVELS 1 AND 2 Project No. 6505 17 | March 20, 2018

Related to Drawing Review

  • Determination to Honor Drawing Request In determining whether to honor any request for drawing under any Letter of Credit by the beneficiary thereof, Agent shall be responsible only to determine that the documents and certificates required to be delivered under such Letter of Credit have been delivered and that they comply on their face with the requirements of such Letter of Credit and that any other drawing condition appearing on the face of such Letter of Credit has been satisfied in the manner so set forth.

  • Request for Review Within sixty (60) days after receiving notice from the Plan Administrator that a claim has been denied (in part or all of the claim), then claimant (or their duly authorized representative) may file with the Plan Administrator, a written request for a review of the denial of the claim. The claimant (or his duly authorized representative) shall then have the opportunity to submit written comments, documents, records and other information relating to the claim. The Plan Administrator shall also provide the claimant, upon request and free of charge, reasonable access to, and copies of, all documents, records and other information relevant (as defined in applicable ERISA regulations) to the claimant’s claim for benefits.