Drilling rig Sample Clauses

Drilling rig. A description of the offshore drilling unit and associated equipment that will be used to carry out the proposed development drilling activities;
AutoNDA by SimpleDocs
Drilling rig. Complete drilling rig, designated by Contractor as its Rig No. TO BE DESIGNATED, the major items of equipment being: Drawworks: Make and Model TO BE DESIGNATED Engines: Make, Model, and H.P. TO BE DESIGNATED No. on Rig Pumps: No. 1 Make, Size, and Power TO BE DESIGNATED No. 2 Make, Size, and Power TO BE DESIGNATED Mud Mixing Pump: Make, Size, and Power TO BE DESIGNATED Boilers: Number, Make, H.P. and W.P. TO BE DESIGNATED Xxxxxxx or Mast: Make, Size, and Capacity TO BE DESIGNATED Substructure: Size and Capacity Rotary Drive: Type TO BE DESIGNATED Drill Pipe: Size in. ft.; Size: in. ft. Drill Collars: Number and Size TO BE DESIGNATED Blowout Preventers: TO BE DESIGNATED
Drilling rig. Complete drilling rig, designated by Contractor as its Rig No. TO BE DESIGNATED, the major items of equipment being: Drawworks: Make and Model TO BE DESIGNATED Engines; Make, Model, and H.P. TO BE DESIGNATED No. on Rig Pumps: No. 1 Make, Size, and Power TO BE DESIGNATED No. 2 Make, Size, and Power TO BE DESIGNATED Mud Mixing Pump: Make, Size, and Power TO BE DESIGNATED Boilers: Number, Make, H.P. and W.P. TO BE DESIGNATED Xxxxxxx or Mast: Make, Size, and Capacity TO BE DESIGNATED Substructure: Size and Capacity, Rotary Drive: Type TO BE DESIGNATED Drill Pipe: Size in. ft.; Size: in. ft. Drill Collars: Number and Size TO BE DESIGNATED Blowout Preventers: TO BE DESIGNATED ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ B.O.P. Closing Unit: TO BE DESIGNATED B.O.P. Accumulator: TO BE DESIGNATED
Drilling rig. (a) The Drilling Rig shall have (i) completed its conversion into a deep water moored semisubmersible drilling unit in compliance with the EVA-4000 (tm) design specifications and the Shell Contract, including but not limited to the overhaul and reconditioning of the Drilling Rig's machinery and systems including all upgrades and modifications to such machinery and systems, (ii) successfully completed and passed all required regulatory inspections and certifications, (iii) successfully completed all sea trials and (iv) successfully conducted, completed and passed acceptance tests on all drilling related machinery, equipment and systems, and shall have been accepted by SDDI; in each case as evidenced by the SDDI Acceptance Certificate. (b) The Drilling Rig shall have been classified in the highest class available for rigs of its age and type by the American Bureau of Shipping and you shall have received copies of such classification certifications. (c) You shall have received a copy of the Rig Appraisal and Engineering Report addressed to you or accompanied by a letter permitting you to rely thereon. (d) The Company shall have valid legal and beneficial title to the Drilling Rig free and clear of all Liens and other encumbrances, except for Excepted Liens in an aggregate amount not in excess of $5,000,000. (e) The Drilling Rig shall be duly and validly registered in the name of the Company under the laws and flag of the Republic of Panama as a documented marine vessel. (f) The Company shall provide (at no expense to you) evidence satisfactory to you that it maintains the insurance called for in Section 7.3 of the Trust Indenture and Section 2.13 of the First Naval Mortgage including, without limitation, a report of an independent insurance consultant reasonably acceptable to you.
Drilling rig. Complete drilling rig, designated by Contractor as its Rig No. , the major items of equipment being: Drawworks: Make and Model Engines: Make, Model, and H.P. No. on Rig: Pumps: No. 1 Make, Size, and Power No. 2 Make, Size, and Power Mud Mixing Pump: Make, Size and Power Boilers: Number, Make, H.P. and X.X. Xxxxxxx or Mast: Make, Size and Capacity Substructure: Size and Capacity: Rotary Drive: Type Drill Pipe: Size ft. Drill Collars: Number and Size Blowout Preventers:
Drilling rig. Complete drilling rig designated by Contractor as its Rig No. 11, the major items of equipment being: Drawworks: Make and Model Mid Continent 1220 EB 2000 input HP, Elmago 7838 brake ------------------------------------------------------ Engines: Make, Model, and H.P. 4-Caterpillar D-398, 1200 HP ------------------------------------------------- No. on Rig Ross Xxxx XXX 4X4 ----------------------------------------------------------------- Pumps: No. 1 Make, Size, and Power PZ 10 1350 HP ---------------------------------------------- No. 2 Make, Size, and Power PZ 10 1350 HP -------------------------------------------------- Mud Mixing Pump: Make, Size and Power ------------------------------------------ Boilers: Number, Make, H.P. and W.P. ------------------------------------------- Derrxxx xx Mast: Make, Size, and Capacity Pyramid 144' 1MM# Static Hook Load -------------------------------------- Substructure: Size and Capacity 26' Self Elevating, 1 MM# Setback ------------------------------------------------ Rotary Drive: Type Mid Continent 27-1/2" Independent Drive ------------------------------------------------------------- Drill Pipe: Size 5 in. 15,000 ft.; Size in. ft. ----- -------- ------------ ------------- Drill Collars: Number and Size ------------------------------------------------- 7 Revised June, 1994 Blowout Preventers: ------------------------------------------------------------- SIZE SERIES OR TEST PR. MAKE & MODEL NUMBER 13-5/8 5,000 Annular -------------------- --------------------------------- ------------------------------ ------------------------ 13-5/8 10,000 Double -------------------- --------------------------------- ------------------------------ ------------------------ 13-5/8 10,000 Double -------------------- --------------------------------- ------------------------------ ------------------------ -------------------- --------------------------------- ------------------------------ ------------------------ -------------------- --------------------------------- ------------------------------ ------------------------ -------------------- --------------------------------- ------------------------------ ------------------------
Drilling rig. You shall have received a copy of the Rig Appraisal and Engineering Report addressed to you or accompanied by a letter permitting you and Duff & Phelps Credit Rating Co. to rely thereon.
AutoNDA by SimpleDocs

Related to Drilling rig

  • Project Completion The Contractor agrees to schedule a final job walk with the County. If required, the County will prepare a list of incomplete items, the “Punch List”. The Contractor agrees to complete the “Punch List” corrections and schedule a final project completion job walk. The County will sign the “Punch List” as completed when determined, the project is finished. The Contractor agrees to submit the following along with its final payment request:

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • SUB-CONTRACTING 31.1. The Authority approves the appointment of the sub-contractors specified in Schedule 10 (Approved Sub-contractors) in respect of the obligations specified in that Schedule. 31.2. The Contractor may not sub-contract its obligations under the Framework Agreement to other sub-contractors without the prior written consent of the Authority. Sub-contracting of any part of the Framework Agreement shall not relieve the Contractor of any obligation or duty attributable to the Contractor under the Framework Agreement. The Contractor shall be responsible for the acts and omissions of its sub-contractors as though they are its own. 31.3. Where the Contractor enters into a sub-contract the Contractor must ensure that a provision is included which: 31.3.1. requires payment to be made of all sums due by the Contractor to the sub- contractor within a specified period not exceeding 30 days from the receipt of a valid invoice as defined by the sub-contract requirements and provides that, where the Authority has made payment to the Contractor in respect of Services and the sub-contractor’s invoice relates to such Services then, to that extent, the invoice must be treated as valid and, provided the Contractor is not exercising a right of retention or set-off in respect of a breach of contract by the sub-contractor or in respect of a sum otherwise due by the sub-contractor to the Contractor, payment must be made to the sub-contractor without deduction; 31.3.2. notifies the sub-contractor that the sub-contract forms part of a larger contract for the benefit of the Authority and that should the sub-contractor have any difficulty in securing the timely payment of an invoice, that matter may be referred by the sub- contractor to the Authority; 31.3.3. requires that all contracts with subcontractors and suppliers which the subcontractor intends to procure, and which the subcontractor has not before the date of this Framework Agreement, already planned to award to a particular supplier are advertised through the Public Contracts Scotland procurement portal (xxx.xxxxxxxxxxxxxxxxxxxxxxx.xxx.xx) and awarded following a fair, open, transparent and competitive process proportionate to the nature and value of the contract; and 31.3.4. is in the same terms as that set out in this clause 31.3 (including for the avoidance of doubt this clause 31.3.4) subject only to modification to refer to the correct designation of the equivalent party as the Contractor and sub-contractor as the case may be. 31.4. The Contractor shall include in every sub-contract: 31.4.1 a right for the Contractor to terminate that sub-contract if the relevant sub- contractor fails to comply in the performance of its contract with legal obligations in the fields of environmental, social or employment law or if any of the termination events (involving substantial modification of the Contract, contract award despite the existence of exclusion grounds or a serious infringement of EU legal obligations) specified in clause 42.4 occur; and 31.4.2 a requirement that the sub-contractor includes a provision having the same effect as 31.4.1 in any sub-contract which it awards. In this Clause 31.4, ‘sub-contract’ means any contract between two or more contractors, at any stage of remoteness from the Authority in a sub-contracting chain, made wholly or substantially for the purpose of performing (or contributing to the performanace of) the whole or any part of this Framework Agreement. 31.5. Where requested by the Authority, copies of any sub-contract must be sent by the Contractor to the Authority as soon as reasonably practicable. 31.6. Where the Contractor proposes to enter into a sub-contract it must: 31.6.1 advertise its intention to do so in at least one trade journal, and the Public Contracts Scotland Portal; and 31.6.2 follow a procedure leading to the selection of the sub-contractor which ensures reasonable competition following principles of equal treatment, non-discrimination and transparency and which ensures that such procedure is accessible by small and medium enterprises.

  • As-Builts Seller shall provide final as-built drawings of the Seller-Owned Interconnection Facilities within 30 Days of the successful completion of the Acceptance Test.

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • BUYER'S FACILITIES 1. Buyer will maintain at its own expense facilities from the delivery point to the point of use and the burners and equipment for using gas, and Buyer will at all times keep gas-using equipment on said premises in a condition conforming with such reasonable rules and regulations as may be prescribed therefore by regulatory authority having jurisdiction thereover and with the requirements of any valid law thereto appertaining. In the event that rules are not prescribed by a regulatory authority, Buyer will abide by codes as used in the gas industry. 2. Seller shall not approve sale of gas on an interruptible basis to Buyer until and unless Seller is satisfied that Buyer has, or will, install adequate stand-by facilities to meet its full fuel requirements during periods of sustained interruptions. 3. Seller shall not approve sales of gas to Buyer unless Seller is satisfied that Buyer has not, or will not interconnect downstream fuel piping of natural gas for use in different priority-of• service categories.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!