During the Design Build Period Sample Clauses

During the Design Build Period. (a) The Operator shall prepare monthly progress reports of the Design-Build Services during the Design-Build Period and submit six copies of the reports to the Design-Build Engineer. The first report shall cover the period up to the end of the calendar month after that in which the Design-Build Starting Date occurred and reports shall be submitted monthly thereafter, each no later than 14 days after the last day of the month to which it applies. (b) The Design-Build Services monthly reports shall include the following information: i. photographs and detailed descriptions of progress, including each stage of design, procurement, manufacture, delivery to the Site or New Facility, construction, erection, testing and commissioning; ii. charts showing the status of Design-Build Documents, purchase orders, manufacture and construction; iii. for the manufacture of each main item, equipment, machinery, floor or component of the New Facility, the name of manufacturer, manufacture location, percentage progress, and the actual or expected dates of commencement of manufacture, Operator’s inspections, tests and delivery relating thereto; iv. detailed records of the Operator’s Personnel and Operator’s Equipment (Design-Build) on the Site or at the New Facility and the actual usage of the Operator’s Equipment (Design-Build) during the reporting period and the tasks performed by the Operator’s Personnel; v. copies of quality assurance documents, test results and certificates of the Plant and Equipment; vi. all monitoring results; vii. [waste quantities received at the Existing Facility]; viii. safety statistics, including details of any hazardous incidents and activities relating to environmental aspects and public relations; ix. percentage completion achieved compared with the planned percentage completion for each activity; and x. where any activity is behind in the scheduled completion, comments and likely consequences and a description of the corrective action being taken.
AutoNDA by SimpleDocs

Related to During the Design Build Period

  • Inspection Period Purchaser shall have a period of time commencing on the Effective Date and expiring at 5:00 p.m., Dallas, Texas time on June 17, 1998 (the "Inspection Period") within which to examine the Property and to conduct its feasibility study thereof. Seller agrees that, during the Inspection Period, Seller will allow Purchaser and Purchaser's agents access to the Property during normal business hours to conduct soil and engineering, hazardous waste, marketing, feasibility, zoning and other studies or tests and to otherwise determine the feasibility of the Property for Purchaser's intended use; provided, however, that prior to conducting any invasive testing with respect to the Land or Improvements, or any tests or studies which could cause any damage to the Land or Improvements, Purchaser must advise Seller in writing (which notice shall state in reasonable detail the nature and extent of such proposed testing) of its intent to conduct such tests or studies and Seller may, in its reasonable discretion, refuse to approve any such tests or studies, in which event Purchaser's sole remedy shall be to terminate this Contract pursuant to Section 5.2 hereof and receive a refund of the Xxxxxxx Money Deposit, all as provided in said Section 5.2. Seller agrees that, during the Inspection Period, Seller will allow Purchaser and Purchaser's agents to conduct interviews with the Tenants set forth on Schedule 5.1 attached hereto and made a part hereof, and with those certain Tenants which Purchaser notifies Seller in writing during the Inspection Period that Purchaser desires to conduct interviews and which Seller consents to, which consent shall not be unreasonably withheld, provided that such interviews shall take place during normal business hours after reasonable notice (which may be by telephone) to Seller, and such interviews shall be conducted only in the presence of one of Seller's representatives. Not withstanding the foregoing, (a) the costs and expenses of Purchaser's investigation shall be borne solely by Purchaser, (b) prior to the expiration of the Inspection Period, Purchaser shall restore the Property to the condition which existed prior to Purchaser's entry thereon and investigation thereof to the extent the condition of the Property was affected by or as a result of the actions of Purchaser or its agents, contractors or representatives, (c) Purchaser shall not, in Seller's reasonable opinion, materially interfere, interrupt or disrupt the operation of Seller's business on the Property and, further, such access by Purchaser and/or its agents shall be subject to the rights of Tenants under Tenant Leases, (d) in the event the transaction contemplated by this Contract does not close for any reason, Purchaser shall deliver to Seller a descriptive listing of all tests, reports and inspections conducted by Purchaser with respect to the Property and deliver copies thereof to Seller (excluding, however, any proprietary development or marketing materials), (e) Purchaser shall not permit any mechanic's or materialman's liens or any other liens to attach to the Property by reason of the performance of any work or the purchase of any materials by Purchaser or any other party on Purchaser's behalf in connection with any studies or tests conducted pursuant to this Section 5.1, (f) Purchaser shall give notice (which may be by telephone) to Seller a reasonable time prior to entry onto the Property and shall permit Seller to have a representative present during all investigations and inspections conducted with respect to the Property, and (g) Purchaser shall take all reasonable actions and implement all protections necessary to ensure that all actions taken in connection with the investigations and inspections of the Property, and all equipment, materials and substances generated, used or brought onto the Property pose no material threat to the safety of persons or the environment and cause no damage to the Property or other property of Seller or other persons. All information made available by Seller to Purchaser in accordance with this Contract or obtained by Purchaser in the course of its investigations shall be treated as confidential information by Purchaser, and, prior to the purchase of the Property by Purchaser, Purchaser shall use its best efforts to prevent its agents and employees from divulging such information to any third parties except (i) as reasonably necessary to third parties engaged by Purchaser for the limited purpose of analyzing and investigating such information for the purpose of consummating the transaction contemplated by this Contract, including Purchaser's attorneys and representatives, prospective lenders and engineers or (ii) as may required by applicable law, unless such information is generally available to the public or is disclosed by a party other than Purchaser or its agents. Purchaser shall indemnify, defend and hold Seller harmless for, from and against any and all claims, liabilities, causes of action, damages, liens, losses, costs and expenses (including, without limitation, reasonable attorneys' fees) incident to, resulting from or in any way arising out of any of Purchaser's and its agents', contractors' and representatives' activities on the Property, including, without limitation, any tests or inspections conducted by Purchaser or its agents, contractors or representatives on the Property. The agreements contained in this Section 5.1 shall survive the Closing and not be merged therein and shall also survive any termination of this Contract.

  • Cooling Off Period You may terminate this Contract with immediate effect at any time within the period of 14 days after the date this Contract is entered into without incurring any liability to DFMC.

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall: 1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the Work to be performed and furnished by Contractor. 2. Visit the Site as needed to assist in preparing the final Drawings and Specifications. 3. Provide technical criteria, written descriptions, and design data for Owner’s use in filing applications for permits from or approvals of governmental authorities having jurisdiction to review or approve the final design; assist Owner in consultations with such authorities; and revise the Drawings and Specifications in response to directives from such authorities, as appropriate. 4. Advise Owner of any recommended adjustments to the opinion of probable Construction Cost. 5. After consultation with Owner, include in the Construction Contract Documents any specific protocols for the transmittal of Project-related correspondence, documents, text, data, drawings, information, and graphics, in electronic media or digital format, either directly, or through access to a secure Project website. Any such protocols shall be applicable to transmittals between and among Owner, Engineer, and Contractor during the Construction Phase and Post- Construction Phase, and unless agreed otherwise shall supersede any conflicting protocols previously established for transmittals between Owner and Engineer. 6. Assist Owner in assembling known reports and drawings of Site conditions, and in identifying the technical data contained in such reports and drawings upon which bidders or other prospective contractors may rely. 7. In addition to preparing the final Drawings and Specifications, assemble drafts of other Construction Contract Documents based on specific instructions and contract forms, text, or content received from Owner. 8. Prepare or assemble draft bidding-related documents (or requests for proposals or other construction procurement documents), based on the specific bidding or procurement-related instructions and forms, text, or content received from Owner. 9. Contract shall include contractor provided changeable message signs to communication construction information. 10. Furnish for review by Owner, its legal counsel, and other advisors, 6 copies of the final drawings and Specifications, assembled drafts of other construction Contract Documents, the draft bidding-related documents (or requests for proposals or other construction procurement documents), and any other final design Phase deliverables, by the established due date, with the Final Design Phase, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items, and any instructions for revisions. B. Engineer’s services under the Final Design Phase will be considered complete on the date when Engineer has delivered to Owner the final Drawings and Specifications, other assembled Construction Contract Documents, bidding-related documents (or requests for proposals or other construction procurement documents), and any other Final Design Phase deliverables. C. In the event that the Work designed or specified by Engineer is to be performed or furnished under more than one prime contract, or if Engineer’s services are to be separately sequenced with the work of one or more prime Contractors (such as in the case of fast- tracking), Owner and Engineer shall, prior to commencement of the Final Design Phase, develop a schedule for performance of Engineer’s services during the Final Design, Bidding or Negotiating, Construction, and Post-Construction Phases in order to sequence and coordinate properly such services as are applicable to the work under such separate prime contracts.

  • Work Period The normal work period shall consist of forty (40) hours of work within a seven (7) day period or eighty (80) hours of work within a fourteen (14) day period.

  • Preliminary Design Phase 30 percent plans) A. Proceed with Preliminary Design Phase after the completion of the Conceptual phase which includes: Acceptance by Owner of the Conceptual Report and any other Study and Report Phase deliverables; selection by Owner of a recommended solution; issuance by Owner of any instructions for use of Project Strategies, Technologies, and Techniques, or for inclusion of sustainable features in the design, and Indication by Owner of any specific modifications or changes in the scope, extent, character, or design requirements of the Project desired by Owner. 1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary drawings, outline specifications, and written descriptions of the Project. 2. Include on plans, property lines, structure locations, ownership names and contact information. 3. In preparing the Preliminary Design Phase documents, use any specific applicable Project Strategies, Technologies, and Techniques authorized by Owner during or following the Study and Conceptual Phase, and include sustainable features, as appropriate, pursuant to Owner’s instructions. 4. Provide necessary field surveys, topographic and utility mapping for Engineer’s design purposes. Comply with the scope of work and procedure for the identification and mapping of existing utilities as defined by Section A1.03 “Utility Requirements” and Section A1.04 “Survey Services” 5. Visit the Site as needed to prepare the Preliminary Design Phase documents. 6. Advise Owner if additional reports, data, information, or services of the types described are necessary and assist Owner in obtaining such reports, data, information, or services. 7. Continue to assist Owner with Project Strategies, Technologies, and Techniques that Owner has chosen to implement. 8. Based on the information contained in the Preliminary Design Phase documents, prepare a revised opinion of probable Construction Cost, and assist Owner in tabulating the various cost categories which comprise Total Project Costs. 9. Obtain and review Owner’s instructions regarding Owner’s procurement of construction services (including instructions regarding advertisements for bids, instructions to bidders, and requests for proposals, as applicable), Owner’s construction contract practices and requirements, insurance and bonding requirements, electronic transmittals during construction, and other information necessary for the finalization of Owner’s bidding-related documents (or requests for proposals or other construction procurement documents), and Construction Contract Documents. Also obtain and review copies of Owner’s design and construction standards, Owner’s standard forms, general conditions, supplementary conditions, text, and related documents or content for Engineer to include in the draft bidding-related documents (or requests for proposals or other construction procurement documents), and in the draft Construction Contract Documents, when applicable. 10. Development communication plan for project: considering the use of door hangers, letters, public meetings, changeable message boards. 11. Furnish 6 review copies of the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables to Owner by established due date, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items. 12. Revise the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables in response to Owner’s comments, as appropriate, and furnish to Owner 6 copies of the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other deliverables by the specified due date. 13. Engineer’s services under the Preliminary Design Phase will be considered complete on the date when Engineer has delivered to Owner the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Initial Contract Term The Initial Contract Term shall be for two years. The Initial Contract Term shall begin on October 1, 2021, or on the last date the Contract is signed by all Parties, whichever is later. The Contract shall expire on October 1, 2023, unless terminated earlier in accordance with the Special Contract Conditions or Additional Special Contract Conditions.

  • Delivery Term The period for which prices for All-Requirements Power Supply have been established, as set forth in Exhibit A.

  • Service Commencement Date The date the Transmission Provider begins to provide service pursuant to the terms of an executed Service Agreement, or the date the Transmission Provider begins to provide service in accordance with Section 15.3 or Section 29.1 under the Tariff.

  • Completion Date The Work under this Contract shall be completed by midnight of the date required in the Contract as the Material Completion and Occupancy Date unless extended by approved requests for extension of time.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!