Elevations Sample Clauses

Elevations. For buildings over one story, elements to differentiate levels may be appropriate. These may include change of materials, dormers, cornices, or other elements, as approved by the city. Architectural wall variations between units to differentiate dwellings may also be appropriate and may be required by the city. These may include vertical articulation, variation of materials or other elements, as approved by the city. Trim and/or shutters is required on all windows unless the design of the building is such that trim and/or shutters is not compatible with the overall architectural style.
AutoNDA by SimpleDocs
Elevations not to construct, erect or install or permit to be constructed, erected or installed on the Lot a dwelling (single or two storey) that does not possess Overhanging Xxxxx to all elevations, provided that the following are exempt from this requirement:
Elevations. Drawings of all interior and exterior elevations visible to the public, detailing storefronts and the architectural compatibility with surrounding areas.
Elevations a) As per Building Elevation Plans, forming Exhibit No.1 of Schedule "B" to this Agreement.
Elevations. In order to enhance the quality of the Development, it is desirable for the Development to have a diverse character. The ARB, in its sole and absolute discretion, shall have the right to reject any plans for the construction of any Improvements submitted to it by or on behalf on any Owner, which the ARB, in its sole and absolute judgment, determines to be substantially similar to any Improvement then already existing in the Development, or already approved by the ARB but not yet constructed by another Owner.
Elevations. S6-08 - STAIR NO. 3 PLANS AND ELEVATIONS S6-09 - STAIR NO. 4 PLANS AND ELEVATIONS S6-10 - STAIR NO. 5 PLANS AND ELEVATIONS S6-11 - STAIR NO. 6 PLANS AND ELEVATIONS S6-12 - SOILED ELEVATOR PLANS AND ELEVATIONS S6-13 - CLEAN ELEVATOR PLANS AND ELEVATIONS S7 - SERIES COLUMN SCHEDULES S7-01 - COLUMN SCHEDULE S7-02 - COLUMN SCHEDULE S7-03 - COLUMN SCHEDULE S8 - SERIES BEAM SCHEDULES S8-01 - BEAM SCHEDULE S8-02 - BEAM SCHEDULE S8-03 – BEAM SCHEDULE CIVIL WORKS 'CW' SERIES CW0 – GENERAL CW100 - TEMPORARY CAR PARK – REMOVALS, LAYOUT AND GENERAL PLAN LANDSCAPE 'L' SERIES L0 – GENERAL L-1 - EXISTING CONDITIONS, REMOVAL AND TREE PRESERVATION PLAN - AREA A, EXISTING CONDITIONS, REMOVAL AND TREE PRESERVATION PLAN - AREA B L-2 - LAYOUT PLAN - AREA A, PAVING PLAN - AREA A L-3 - GRADING PLAN - AREA A, PLANTING PLAN - AREA A L-4 - LAYOUT PLAN - AREA B, PAVING PLAN - AREA B, GRADING PLAN - AREA B, PLANTING PLAN - AREA B L-5 - IRRIGATION PLAN L-6 - TEMPORARY PARKING AREA LANDSCAPE GRADING & PLANTING PLAN LD-1 - DETAIL 1 LD-2 - DETAIL 2 LD-3 - DETAIL 3 VOLUME B DRAWINGS: P&G FIT-UP ARCHITECTURAL 'A' SERIES G100 - GENERAL INFORMATION G100 - GENERAL NOTES, ABBREVIATIONS, HOARDING DETAILS & O.B.C. DATA MATRIX FS100 - FIRE SEPARATION PLANS FS101 - LEVEL 4 & LEVEL 5 - FIRE SEPARATION FLOOR PLANS & FIRE SEPARATION LEGEND A100 - PLAN SERIES A101.1 - LEVEL 4 REFERENCE PLAN WEST - PART MILLWORK, ARCH. METAL & WASHROOMS A101.2 - LEVEL 4 REFERENCE PLAN EAST - PART MILLWORK, ARCH. METAL & WASHROOMS A101.3 - LEVEL 5 REFERENCE PLAN WEST - PART MILLWORK, ARCH. METAL & WASHROOMS A101.4 - LEVEL 5 REFERENCE PLAN EAST - PART MILLWORK, ARCH. METAL & WASHROOMS A102.1 - LEVEL 4 WEST - PART SYSTEMS CASEWORK, LOCKERS & CORRIDOR ELEVATIONS REF. PLAN A102.2 - LEVEL 4 EAST - PART SYSTEMS CASEWORK, LOCKERS & CORRIDOR ELEVATIONS REF. PLAN A102.3 - LEVEL 5 WEST - PART SYSTEMS CASEWORK, LOCKERS & CORRIDOR ELEVATIONS REF. PLAN A102.4 - LEVEL 5 EAST - PART SYSTEMS CASEWORK, LOCKERS & CORRIDOR ELEVATIONS REF. PLAN A103 - LEVEL 4 & LEVEL 5 - REFERENCE REFLECTED CEILING PLANS A110 - LEVEL 3 & PART BASEMENT PLAN - CUT & PATCH WORK A111 - LEVEL 4 WEST - PART FLOOR PLAN, DOOR & SCREEN REF. PLAN & WALL TYPES A112 - LEVEL 4 EAST - PART FLOOR PLAN, DOOR & SCREEN REF. PLAN & WALL TYPES A113 - LEVEL 5 WEST - PART FLOOR PLAN, DOOR & SCREEN REF. PLAN & WALL TYPES A114 - LEVEL 5 EAST - PART FLOOR PLAN, DOOR & SCREEN REF. PLAN & WALL TYPES A121 - LEVEL 4 WEST - PART FURNITURE AND EQUIPMENT PLAN A122 - LEVEL 4 EAST - PART F...
Elevations. A-2.2 ELEVATIONS A-3.1 EXTERIOR WALL REPAIR DETAILS, TYP EXTERIOR WALL REPAIR DETAILS WINDOW LINTEL REPLACEMENT DETAIL WALL ANCHORING & STITCHING DETAILS A-4.2 WALL ANCHORING & STITCHING DETAILS A-5.1 ROOF DETAILS, TYPICAL A-5.2 ROOF DETAILS - PARAPETS AND COPING A-6.1 METAL WALL PANEL DETAILS METAL WALL PANEL DETAILS, METAL LADDER DETAIL SECTION 011000 – SUMMARY
AutoNDA by SimpleDocs
Elevations. All the elevations shown on the plans or referred to herein are in feet above mean sea level datum as established by the United States Geological Survey, unless otherwise noted. The Contractor shall verify all the existing structure locations and elevations at points of connection or possible interference between their work and the existing structures and shall report at once to the Engineer any interference’s or discrepancies discovered.
Elevations. As part of Buyer’s permitting process, Buyer undertakes (i) to provide Seller with proposed elevations and drawings to demonstrate the impact on the Penn Central Mall of the new proposed Hardee’s restaurant to be constructed on the Vacant Land (“New Hardee’s”), (ii) to complete construction of the New Hardees within twelve months after the Closing; and (iii) to follow the required development process established by the City for new commercial construction such as is proposed by Buyer on the Vacant Land.
Elevations. By the time construction is completed on the Property, You will, at Your cost, bring the Property to the engineering grade plan elevations required by Seller. Upon completion of construction, You will deliver to Us, at Your expense, a boundary and topographic survey certified to Us by a licensed land surveyor confirming all elevations to be in accordance with the foregoing requirements. If the elevations do not conform to the foregoing requirements, You will immediately, at Your expense, cause the necessary filling, grading and other work to be performed. Either We or the Association may obtain a survey or perform the work required by this paragraph if You do not.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!