Environmental Exclusions Sample Clauses

Environmental Exclusions. In addition to the items previously described within this section, the following tasks are not covered in this scope of work and may or may not be necessary. If deemed necessary, these tasks could be conducted under a separate or supplemental work authorization. • Environmental AssessmentAir Quality MSAT Analysis (Quantitative) • Intensive historic survey, or HABS/HAER documentation • Threatened and endangered species biota (presence/absence) surveys • Biological Assessment preparation or Section 7/10(a) coordination • Cave or solution feature mitigation • Excavation of karst features identified or discovered • Indirect and cumulative impacts analysisConstruction phase services • Work extending beyond the specified limits of the project at the time of this work orderAdditional meetings not previously specified • Additional documentation services requested as a result of a change in environmental regulations or CITY/TxDOT documentation standards from those in practice and acceptable at the time of approval of this work authorization. Note: Only those services expressly stated in this task order will be performed. If any services, other than those expressly stated in this task order are required, the ENGINEER may perform those services under a separate or supplemental task order. RIGHT OF WAY DATA (Function Code 130)
AutoNDA by SimpleDocs
Environmental Exclusions. Notwithstanding any other provision in this Lease, the indemnification, defense, and hold harmless provisions in this Paragraph 16 shall not apply to any liabilities, obligations, or other costs addressed by Paragraph 14 of this Lease, Environmental Protection Provisions. Paragraph 14 shall be the sole and exclusive provisions in this Lease concerning any and all liabilities, obligations, or other costs arising under Environmental Laws or otherwise concerning Hazardous Wastes and Hazardous Substances.”

Related to Environmental Exclusions

  • D4 Environmental Requirements D4.1 The Contractor shall, when working on the Premises, perform its obligations under the Contract in accordance with the Authority’s environmental principles, which are to conserve energy, water, wood, paper and other resources, reduce waste and phase out the use of ozone depleting substances, minimise the release of greenhouse gases, volatile organic compounds and other substances damaging to health and the environment.

  • D5 Environmental Requirements D5.1 The Contractor shall in the performance of the Contract have due regard to the Authority’s Environmental, Sustainable Procurement and Ethical Procurement policy statements and in addition, shall assist the Authority in achieving the Sustainable Development in Government targets (“SDIG”). These statements and targets require the Authority through its procurement and management of suppliers to inter alia:

  • Environmental Safety Upon encountering any previously unknown potentially hazardous material, or other materials potentially contaminated by hazardous material, Contractor shall immediately stop work activities impacted by the discovery, secure the affected area, and notify the ODR immediately.

  • Environmental Remediation Failure to remediate (or pursue the remediation process with due diligence and good faith) within the time period required by law or governmental order, (or within a reasonable time in light of the nature of the problem if no specific time period is so established), environmental problems in violation of Applicable Law related to Properties of the Borrower and/or its Subsidiaries where the estimated cost of remediation is in the aggregate in excess of Seventy-Five Million Dollars ($75,000,000), in each case after all administrative hearings and appeals have been concluded.

  • Environmental Requirements C7.1 The Contractor shall, when working on the Premises, perform its obligations under the Contract in accordance with the Authority’s environmental policy, which is to conserve energy, water, wood, paper and other resources, reduce waste and phase out the use of ozone depleting substances and minimise the release of greenhouse gases, volatile organic compounds and other substances damaging to health and the environment.

  • Environmental Measures (i) The Contractor agrees to conduct its activities in connection with the Agreement in such a manner so as to comply with the environmental requirements which includes, inter alia, all the conditions required to be satisfied under the environmental clearances and applicable law, and assumes full responsibility for measures which are required to be taken to ensure such compliance.

  • Environmental Hazards (a) Except for matters described in Section 18(b), Borrower shall not cause or permit any of the following:

  • Hazardous Substances The words "Hazardous Substances" mean materials that, because of their quantity, concentration or physical, chemical or infectious characteristics, may cause or pose a present or potential hazard to human health or the environment when improperly used, treated, stored, disposed of, generated, manufactured, transported or otherwise handled. The words "Hazardous Substances" are used in their very broadest sense and include without limitation any and all hazardous or toxic substances, materials or waste as defined by or listed under the Environmental Laws. The term "Hazardous Substances" also includes, without limitation, petroleum and petroleum by-products or any fraction thereof and asbestos.

  • Environmental Conditions A Phase I environmental site assessment (or update of a previous Phase I and or Phase II environmental site assessment) and, with respect to certain Mortgage Loans, a Phase II environmental site assessment (collectively, an “ESA”) meeting ASTM requirements conducted by a reputable environmental consultant in connection with such Mortgage Loan within 12 months prior to its origination date (or an update of a previous ESA was prepared), and such ESA (i) did not identify the existence of Recognized Environmental Conditions (as such term is defined in ASTM E1527-05 or its successor, hereinafter “Environmental Condition”) at the related Mortgaged Property or the need for further investigation, or (ii) if the existence of an Environmental Condition or need for further investigation was indicated in any such ESA, then at least one of the following statements is true: (A) an amount reasonably estimated by a reputable environmental consultant to be sufficient to cover the estimated cost to cure any material noncompliance with applicable Environmental Laws or the Environmental Condition has been escrowed by the related Mortgagor and is held or controlled by the related lender; (B) if the only Environmental Condition relates to the presence of asbestos-containing materials, radon in indoor air, lead based paint or lead in drinking water, the only recommended action in the ESA is the institution of such a plan, an operations or maintenance plan has been required to be instituted by the related Mortgagor that can reasonably be expected to mitigate the identified risk; (C) the Environmental Condition identified in the related environmental report was remediated, abated or contained in all material respects prior to the date hereof, and, if and as appropriate, a no further action, completion or closure letter or its equivalent, was obtained from the applicable governmental regulatory authority (or the Environmental Condition affecting the related Mortgaged Property was otherwise listed by such governmental authority as “closed” or a reputable environmental consultant has concluded that no further action or investigation is required); (D) an environmental policy or a lender’s pollution legal liability insurance policy that covers liability for the Environmental Condition was obtained from an insurer rated no less than “A-” (or the equivalent) by Xxxxx’x, S&P and/or Fitch; (E) a party not related to the Mortgagor was identified as the responsible party for the Environmental Condition and such responsible party has financial resources reasonably estimated to be adequate to address the situation; or (F) a party related to the Mortgagor having financial resources reasonably estimated to be adequate to address the situation is required to take action. To Seller’s knowledge, except as set forth in the ESA, there is no Environmental Condition at the related Mortgaged Property.

  • Hazardous Conditions The Contractor and Owner acknowledge that previously unknown hazardous conditions may be uncovered at any job site, and in particular where existing structures are being demolished and/or remodeled to accommodate new construction or to reutilize existing facilities. Should a hazardous condition not involving Hazardous Materials as set forth above be encountered on the Site, and should reasonable safety precautions be deemed by the Contractor in good faith to be inadequate to prevent foreseeable personal injury to persons encountering the hazardous condition, the Contractor shall, upon recognizing the hazardous condition, stop work in the affected area and immediately report the hazardous condition to the Design Professional and Owner in writing. The Owner shall undertake, or shall contract (by Change Order) with the Contractor or contract with a Separate Contractor, to resolve the condition. So long as the hazardous condition did not result from activities or substances brought on the Site by the Contractor, the Contractor is entitled to adjustments in the Contract Time and the Contract Sum as set forth in Paragraph 1.6.1.2 above.

Time is Money Join Law Insider Premium to draft better contracts faster.