Erosion and Sediment Controls Sample Clauses

Erosion and Sediment Controls. The Electric Line project shall comply with the requirements of this AIMA and the NPDES Permit for Construction Activities, if applicable to the Project. This includes the timeframe for the installation of erosion and sediment control BMPs. The Company shall install erosion and sediment control BMPs to manage and reduce the risk of erosion and sediment transport within the ROW and downslope from the ROW as a result of construction activities. BMPs shall be at least as protective as the requirements contained in the Illinois Urban Manual and the Project’s Stormwater Pollution Prevention Plan, if applicable. BMPs shall be maintained, as necessary, to keep them in effective operating condition throughout the life of the Project. Temporary sediment control BMPs may be removed once the upslope has achieved Final Restoration (see Definitions). Permanent erosion controls shall be installed to revegetate pasture lands and areas enrolled in conservation practices, and to vegetate previously forested areas. On cropland in the ROW, factors such as soil type, steepness and length of slope, level of disturbance and compaction, adjacent tillage practices, and proximity to sensitive areas such as streams or wetlands will determine the area’s risk of erosion and therefore will also determine the temporary erosion controls that are needed on the ROW to reduce the risk of erosion, until the cropland can be planted again. The Company and Landowner shall consult with the local SWCD in the event that an agreement regarding a reasonable method to control erosion on the Landowner's ROW cannot be achieved.
AutoNDA by SimpleDocs
Erosion and Sediment Controls. Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: 7.3.1 Control storm water volume and velocity within the site to minimize soil erosion; 7.3.2 Control storm water discharges, including both peak flow rates and total storm water volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; 7.3.3 Minimize the amount of soil exposed during construction activity; 7.3.4 Minimize the disturbance of steep slopes; 7.3.5 Minimize sediment discharges from the site. The design, installation and maintenance of erosion and sediment controls must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting storm water runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site; 7.3.6 Provide and maintain natural buffers around surface waters, direct storm water to vegetated areas to increase sediment removal and maximize storm water infiltration, unless infeasible; and 7.3.7 Minimize soil compaction and, unless infeasible, preserve topsoil.
Erosion and Sediment Controls. An erosion and sediment control plan shall identify appropriate control measures for each major stage of construction.
Erosion and Sediment Controls x. Xxxxxx ANGB shall minimize erosion and pollutant discharges by stabilizing exposed soils and placing flow velocity dissipation devices at discharge locations to minimize channel and stream bank erosion and scour in the immediate vicinity of stormwater outfalls. x. Xxxxxx ANGB shall conduct all earth disturbance activities and, when applicable, shall maintain all post-construction stormwater management (PCSM) BMPs in accordance with 25 Pa. Code Chapter 102. x. Xxxxxx ANGB may not utilize polymers or other chemicals to treat stormwater unless written permission is obtained from DEP.

Related to Erosion and Sediment Controls

  • Agreement Controls In the event that any term of any of the Loan Documents other than this Agreement conflicts with any express term of this Agreement, the terms and provisions of this Agreement shall control to the extent of such conflict.

  • Audit Controls a. System Security Review. CONTRACTOR must ensure audit control mechanisms that record and examine system activity are in place. All systems processing and/or storing PHI COUNTY discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY must have at least an annual system risk assessment/security review which provides assurance that administrative, physical, and technical controls are functioning effectively and providing adequate levels of protection. Reviews should include vulnerability scanning tools.

  • Plan Document Controls The rights granted under this Agreement are in all respects subject to the provisions set forth in the Plan to the same extent and with the same effect as if set forth fully in this Agreement. If the terms of this Agreement conflict with the terms of the Plan document, the Plan document will control.

  • Safeguards Monitoring and Reporting The Borrower shall do the following or cause the Project Executing Agency to do the following:

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Technical Security Controls 35 a. Workstation/Laptop encryption. All workstations and laptops that store PHI COUNTY 36 discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of 37 COUNTY either directly or temporarily must be encrypted using a FIPS 140-2 certified algorithm which 1 is 128bit or higher, such as AES. The encryption solution must be full disk unless approved by the 2 COUNTY.

  • TIA Controls If any provision of this Indenture limits, qualifies, or conflicts with another provision which is required to be included in this Indenture by the TIA, the required provision shall control.

  • Monitoring and Reporting The Programme Operator shall monitor, record and report on progress towards the programme’s outcomes in accordance with the provisions contained in the legal framework. The Programme Operator shall ensure that suitable and sufficient monitoring and reporting arrangements are made with the project promoters in order to enable the Programme Operator and the National Focal Point to meet its obligations to the Donors. When reporting on progress achieved in Annual and Final Programme Reports, the Programme Operator shall disaggregate results achieved as appropriate and in accordance with instructions received from the FMO.

  • Human and Financial Resources to Implement Safeguards Requirements The Borrower shall make available necessary budgetary and human resources to fully implement the EMP and the RP.