Fabrication Inspection Sample Clauses

Fabrication Inspection. A minimum of two (2) weeks prior to TxDOT performing any inspections, the Local Government will submit Work Requests to TxDOT. Submit one Work Request per Fabricator and include the following: • Project information (i.e. contract number, CSJ, etc.) • Work description • Type and estimated quantity of material(s) to be inspected • Fabricator information (Name, contact person, phone number, physical location) • Name, title, signature, and telephone number of the Local Government’s authorized representative. • Specification Item or Special Specification to be used for inspection • List of the Local Government’s amendments to Specification Item • Local Governments Special Specifications • Complete set of necessary design drawings, material specifications, and shop drawing files in Adobe .pdf format to perform inspection of the material. Incomplete Work Requests will not be accepted. E-mail completed Work Requests, with attachments, as an Adobe .pdf format to XXX_Xxxxxxxxxxxxxxxxxxxxxxxx@xxxxx.xxx and include “Work Request” in the subject line. A minimum of two (2) weeks prior to TxDOT providing independent assurance, the Local Government will submit Work Requests to TxDOT. Submit one Work Request and include the following: • Project information (i.e. contract number, CSJ, etc.) • Work description • List of equipment or personnel requiring evaluation and verification • Desired date of completion or comparison • Name, title, signature, and telephone number of the Local Government’s authorized representative. Incomplete Work Requests will not be accepted. E-mail completed Work Requests to XXX_Xxxxxxxx_Xxxxxxxxxx@xxxxx.xxx and include “Work Request” in the subject line. TxDOT will send test reports and pertinent information to the Local Government’s designated point of contact for services performed as attachments to invoices for services.
AutoNDA by SimpleDocs
Fabrication Inspection. A minimum of two (2) weeks prior to TxDOT performing any inspections, the Local Government will submit Work Requests to TxDOT. Submit one Work Request per Fabricator and include the following: • Project information (CSJ, Project Number, Project Limits, etc.) • Type and estimated quantity of material(s) to be inspected • Fabricator information (Name, contact person, phone number, physical location) • Name, title, signature, and telephone number of the Local Government’s authorized representative. • Specification Item, Special Specification, and Local Government Specifications. • Complete set of necessary design drawings and shop drawing files in Adobe .pdf format. Incomplete Work Requests will not be accepted. E-mail complete Work Requests, with attachments, as an Adobe .pdf format to XXX_Xxxxxxxxxxxxxxxxxxxxxxxx@xxxxx.xxx and include “Work Request” in the subject line. TxDOT will send test reports and pertinent information to the Local Government’s designated point of contact for services performed as attachments to invoices for services. TxDOT will only perform the independent assurance, inspection and testing services outlined in Attachment A. Charges will be based on rates in effect at the time inspection and testing services are performed. Current Inspection and Testing Rates are published at xxxx://xxx.xxx.xxxxx.xx.xx/pub/txdot/mtd/inspection_testing.pdf Invoices will be sent to the Local Government on a monthly basis. Payments are due within 30 days of date of invoice and will be mailed to the following address: Texas Department of Transportation P. O. Box 149001 Austin, Texas 78714-9001
Fabrication Inspection. A minimum of two (2) weeks prior to TxDOT performing any inspections, the Local Government will submit Work Requests to TxDOT. Submit one Work Request per Fabricator and include the following: • Project information (i.e. contract number, CSJ, etc.) • Work description • Type and estimated quantity of material(s) to be inspected • Fabricator information (Name, contact person, phone number, physical location) • Name, title, signature, and telephone number of the Local Government’s authorized representative. • Specification Item or Special Specification to be used for inspection • List of the Local Government’s amendments to Specification Item • Local Governments Special Specifications • Complete set of necessary design drawings, material specifications, and shop drawing files in Adobe .pdf format to perform inspection of the material. Incomplete Work Requests will not be accepted. E-mail completed Work Requests, with attachments, as an Adobe .pdf format to XXX_Xxxxxxxxxxxxxxxxxxxxxxxx@xxxxx.xxx and include “Work Request” in the subject line. TxDOT will send test reports and pertinent information to the Local Government’s designated point of contact for services performed as attachments to invoices for services.
Fabrication Inspection. Manager will perform fabrication ---------------------- inspections in connection with the construction of the Systems which will include: (a) Structural fab inspection (b) #6, #7 and #8 reactor fab inspection (c) Conveyor's fab inspection (d) #6, #7 and #8 outlet duct fab inspection (e) Silo fab inspection

Related to Fabrication Inspection

  • IN INSPECTION Before, at the time of the Tenant accepting possession, or shortly thereafter, the Landlord and Tenant: (check one)

  • MOVE-IN INSPECTION Before, at the time of the Tenant accepting possession, or shortly thereafter, the Landlord and Tenant: (check one) ☐ - Agree to inspect the Premises and write any present damages or needed repairs on a move-in checklist. ☐ - Shall not inspect the Premises or complete a move-in checklist.

  • Property Inspection The Servicer is required to inspect each Delinquent Mortgaged Property at such time and in such manner as is in accordance with Prudent Servicing Practices. The Servicer must prepare a Property Inspection Report following each inspection. All Property Inspection Reports must be retained by the Servicer and copies thereof must be forwarded to the Master Servicer promptly upon request. All expenses related to the foregoing shall be recoverable by the Servicer from the Principal or from Liquidation Proceeds, Insurance Proceeds, payments on the related Mortgage Loan or any other source relating to the related Mortgage Loan or the related Mortgaged Property. The foregoing shall not preclude the Servicer from recovering such expenses from the Borrower to the extent permitted by applicable law and the related Mortgage Loan Documents.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!