Final Presentation - Phase I Sample Clauses

Final Presentation - Phase I. The Contractor shall prepare and submit a final presentation which shall be due on or before the completion date of Phase I portion of the contract. Presentation of the slides shall occur either in-person, through Webinar, or teleconference. The presentation shall cover the following: a. Discussion of the Contractor’s/project status. b. The Contractor’s achievements during the Phase l performance period (patents, publications, sales, regulatory approvals, partnerships, awards, etc.). c. Detailed technical results of the performed research and development. d. Discussion of proposed milestones and whether they were achieved during the contract performance. e. Summary of submitted commercialization plan. f. If the Contractor is interested in pursuing Phase II research, detailed discussion of the anticipated Phase II technical activities with emphasis on how they fit in the commercialization plan. The Phase II research plan and commercialization plan shall be included in the final presentation for Phase I. g. Questions to the NCI. Contract No. HHSN261201300060C NCI Control No. N43CO-2013-00060 Modification No. 4
AutoNDA by SimpleDocs

Related to Final Presentation - Phase I

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items: 9.1 All profit, profit expectations and costs associated with profit sharing plans such as personnel bonuses, incentives, and rewards; company stock options; or any other like expenses of Contractor.

  • Construction Phase Part 1 –

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Term of Contract; Contract Extension The Contract will be in effect from the Effective Date (15 December 2016) through 31 December 2018. DAS, in its sole discretion, may extend this Contract for additional terms beyond the original term, prior to Termination or expiration, one or more times for a combined total period not to exceed the complete length of the original term.

  • Production Phase contract period in which the Development and the Production are to be performed.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Rent Review 3.1 If the reference base used to compile the Index shall change after today’s date the figure taken to be shown in the Index after the change shall be the figure which would have been shown in the Index if the reference base current at today’s date had been retained 3.2 If it becomes impossible by reason of any change after today’s date in the methods used to compile the Index or for any other reason whatever to calculate the revised Rent by reference to the Index or if any dispute or question whatever shall arise between the parties with respect to the amount of the revised Rent or the determination of the revised Rent such matter shall at the option of the Landlord be determined by an independent valuer to be appointed either by agreement between the parties or in the absence of agreement by the President for the time being of the Royal Institution of Chartered Surveyors (or his duly appointed deputy or any person authorised by him to make appointments on his behalf) on the application of either party who shall have full power to determine on such dates as he shall deem apposite what would have been the increase in the Index had it continued on the same basis and in view of the information assumed to be available for the operation of this rent review or (if that determination shall also be impossible) shall determine a reasonable revised Rent for the Property on such dates having regard to the purposes and intent of the provisions in this Lease for the review of the Rent 4 The Landlord shall give written notice to the Tenant of the amount of the revised Rent and thereafter memoranda (in such form as the Landlord shall reasonably require) recording the amount of the revised Rent shall be signed by or on behalf of the Landlord and the Tenant and annexed to this Lease and the Counterpart thereof and the parties shall bear their own costs of this procedure 5 If the new Rent payable on and from any Review Date has not been agreed by that Review Date Rent shall thereafter be payable at the rate in force immediately before the Review Date and forthwith upon the revised Rent being ascertained the Tenant shall pay to the Landlord an amount representing the difference (“the Shortfall”) between:- 5.1 the amount of the yearly Rent which would have been payable for the period from that Review Date until the next payment date following the date of ascertainment if the revised Rent had been ascertained at that Review Date and 5.2 together with interest at the rate of 2% below the Interest Rate on the Shortfall calculated on a day to day basis upon those parts of the Shortfall which would have been payable if the revised Rent had been ascertained at that Review Date

  • Basic Work Week ‌ a) The basic work week of an employee working full- time shall be forty (40) hours consisting of five eight hour days; b) Daily hours of work shall be consecutive with the exception of rest and meal periods. No split shifts shall be worked; c) Employees shall not work longer than their regular, scheduled work day, unless requested to do so by Management; in which event, additional time will be paid at applicable regular or overtime rates. Employees are required to leave the store as soon as it is reasonable to do so.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. • All Basic Services set forth in the Agreement. • All Basic Services set forth in the Agreement. • All Basic Services set forth in the Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!