Flight Instructor and Project Pilot Sample Clauses

Flight Instructor and Project Pilot. 11.04.01 FI's and PP's DBM will be 80 hours with a MBG of 74 hours every Block Period and paid in accordance with Art 13. 11.04.02 FIs and PPs will bid for flying using PBS. They will have days blocked off in PBS and will be given a start credit for pre-planned activities such as simulator sessions, administrative (office) days or meetings. They will operate any flights in their awarded Blocks. 11.04.03 Normal Pay Protection rules will apply. When a simulator session or a training event is cancelled, a FI or PP will be re-assignable in the same Block Period through mutual agreement with the Company. 11.04.04 A FI or PP on reserve will have his Reserve Block prorated based on the following formula: # of days on RSV Values of 0.5 or greater will be rounded up. 11.04.05 A FI performing IOE duties may be assigned flying through the training department or through the above mentioned PBS process for training purposes. 11.04.06 The bank threshold will be the greater of 80 hours or the DBM for line Pilots in the same Position. 11.04.07 When a FI/PP has reached the AVO threshold (40 hours), any additional assigned credits (excluding block growth) above 80 hours will be reconciled as a start credit in the subsequent Block Period.
AutoNDA by SimpleDocs
Flight Instructor and Project Pilot. 13.12.03.01 Block pay will be a minimum of 74 hours DN plus applicable overseas and Nav pay as per the following: 00.00.00.00.00 For the B777, B787, A330, B767: 71 hours of overseas 00.00.00.00.00 For the A320: 3 hours of Nav and 3 hours of overseas 00.00.
Flight Instructor and Project Pilot. FI's and PrP's DBM will be 80 hours with a MBG of 74 hours every Block Period and paid in accordance with A13. Prior to obtaining their flying schedule, FIs and PrPs will have days blocked off (including 5 protected days off) and given a credit for preplanned activities such as simulator sessions, administrative (office) days or meetings. They will fill the remainder of their block using one of the following two options: Bid for their monthly flying using the established PBS process; or Pre-select pairings in order of base seniority from the Open Time that remains after the PBS awards have been completed. This preselection process must be completed no later than 24 hours prior to the start of the new block period. In addition, FIs and PrPs may list themselves for Open Time under Step 2 of A28. FIs and PrPs may only select flying that does not interfere with their preplanned duties. FIs and PrPs must advise the Company which of the above two options they have chosen no later than 48 hours after the published pairings are released.

Related to Flight Instructor and Project Pilot

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Project Number The project number has been assigned by the Commission as the unique identifier for your project, and it cannot be changed. The project number should appear on each page of the grant agreement preparation documents to prevent errors during its handling.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Contractor Project Manager The Contractor Project Manager shall serve, from the Effective Date, as the Contractor project manager and primary Contractor representative under this Agreement. The Contractor Project Manager shall (i) have overall responsibility for managing and coordinating the performance of Contractor’s obligations under this Agreement, including the performance of all Subcontractors; and (ii) be authorized to act for and bind Contractor and Subcontractors in connection with all aspects of this Agreement. The Contractor Project Manager shall respond promptly and fully to all inquiries from the JBE Project Manager.

  • Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner [shall/shall not] transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!