FRR Sample Clauses

FRR. Frequency Restoration Reserve At present includes Tertiary Operating Reserve 1 (TOR1) and Tertiary Operating Reserve 2 (TOR2) as defined in the EirGrid and SONI Grid Codes78. With ongoing implementation of Network Codes, in particular Electricity Balancing, future refinements are possible to ensure alignment with Network Codes.
AutoNDA by SimpleDocs
FRR. Frequency Restoration Reserve At present includes Tertiary Operating Reserve 1 (TOR1) and Tertiary Operating Reserve 2 (TOR2) as defined in the EirGrid and SONI Grid Codes45. With ongoing implementation of Network Codes, in particular Electricity Balancing, future refinements are possible to ensure alignment with Network Codes. RR – Replacement Reserve At present includes Replacement Reserve (RR) as defined in the EirGrid and SONI Grid Codes. With ongoing implementation of Network Codes, in particular Electricity Balancing, future refinements are possible to ensure alignment with Network Codes. Reference incident for the purposes of dimensioning FCR In IE/NI this is typically referred to as the imbalance that may arise from the loss of the largest single infeed (or outfeed) when determining the requirements for reserve scheduling. Reserve providing unit Any provider that has the technical capability to provide reserves, FCR (POR, SOR), FRR (TOR1, TOR2) and RR, having met the applicable Network Code requirements including the additional properties specified in article 4 of the SAOA and having successfully completed the required performance tests. Demand Unit Demand Side Unit as defined in the EirGrid and SONI Grid Codes and in the ESBN and NIE Distribution Codes; or An Individual Demand Site or Aggregated Demand Site with a Demand Side Unit MW Capacity of at least 4 MW. The Demand Side Unit shall be subject to Central Dispatch. Table 1: SOGL Interpretation 4 SONI Grid Code, 5 EirGrid Grid Code Existing products mapping table DS3 balancing Service Existing Scheduled and Dispatched products SOGL EBGL specific product EBGL standard product balancing capacity EBGL standard product balancing energy SIR Inertia N/A N/A N/A N/A FRR MMS Reports On N/A N/A N/A N/A POR (5-15sec) POR (5-15sec) FCR N/A FCR N/A SOR (15-90sec) SOR (15-90sec) FCR N/A FCR N/A TOR1 (90sec-5min) TOR (90sec-5min) FCR and FRR N/A N/A N/A TOR2 (5-20min) TOR (5-20min) FRR and RR aFRR (7.5 min FAT) RRS (20min-1hr) RR (20min-4hrs) RR mFRR (12.5 min FAT) RR (30min FAT) RRD (20min-1hr) RR (20min-4hrs) RR mFRR (12.5 min FAT) RR (30min FAT) RM1 MMS Reports On N/A N/A RM3 MMS Reports On N/A N/A RM8 MMS Reports On N/A N/A Table 2: Existing Products Mapping Table Network Code Definitions PGM - Power Generating Module means either a synchronous power-generating module or a power park module Demand Unit means an indivisible set of installations containing equipment which can be actively controlled by a dem...
FRR dimensioning rules (after implementation of the FRR SOGL157(1) dimensioning rules in accordance with SOGL article 157(1)) SOGL119(1)(h)
FRR. Frequency Restoration Reserve Shall include Tertiary Operating Reserve 1 (TOR1) and Tertiary Operating Reserve 2 (TOR2) as defined the EirGrid and SONI Grid Codes34 RR – Replacement Reserve Shall include Replacement Reserve (RR) as defined in the EirGrid and SONI Grid Codes PGM - Power Generating Module Shall mean the Grid Code definition ‘Generating Unit’ as defined in the EirGrid and SONI Grid Codes Demand Unit Shall mean the Grid Code definition ‘Demand Side Unit (DSU)’ as defined in the EirGrid and SONI Grid Codes Cross border sharing and exchange of reserves categories FCR, FRR and RR. The Interconnector Operating Protocols (IOP)5 make reference to a number of reserve services which are available to the TSOs: • These existing arrangements describe the current explicit services enabling the TSOs’ to share reserves across HVDC interconnectors. These services are not intended to preclude alternative methods of sharing or exchanging reserves • Static response may be used for cross- border sharing of FCR and FRR between the IE/NI synchronous area and the GB synchronous area. FCR, FRR and RR providing units Grid Code defines the requirements for the provision of POR, SOR and TOR by certain 3 SONI Grid Code, 4 EirGrid Grid Code 5 The IOP is Commercial in Confidence – Nonetheless, information relevant to this SAOA is reproduced in this SAOA or included in the Operational Constraints Update Grid Code Users in respect of their generating units and demand side units. In addition to those Grid Code requirements, reserve services are also defined in the System Services Technical Definitions decision paper. These define additional reserve categories such as Fast Frequency Response. Reference incident for the purposes of dimensioning FCR In IE/NI this is typically referred to as the loss of the largest single infeed (or outfeed) when determining the requirements for reserve scheduling. Table 1: SOGL Interpretation TITLE 2 Methodologies, Conditions and Values developed jointly by XxxXxxx and SONI to satisfy the SOGL requirements within the SAOA for IE/NI, which are subject to approval by the NRAs of IE and NI Article 3 The dimensioning rules for FCR in accordance with SOGL Article 153
FRR. Frequency Restoration Reserve At present includes Tertiary Operating Reserve 1 (TOR1) and Tertiary Operating Reserve 2 (TOR2) as defined in the EirGrid and SONI Grid Codes. With 5 EirGrid Grid Code 6 SONI Grid Code ongoing implementation of Network Codes, in particular Electricity Balancing, future refinements are possible to ensure alignment with Network Codes. mFRR – Manual Frequency Restoration Reserves Means FRR with manual activation. aFRR – Automatic Freque Restoration Reserves Means FRR that can be activated by an automatic control device. aFRR activated by a load frequency controller are at present not used in the IE/NI synchronous area. This is subject to a cost benefit analysis being carried as required by SOGL (Article 145(2)).
FRR. Frequency Restoration Reserve At present includes Tertiary Operating Reserve 1 (TOR1) and Tertiary Operating Reserve 2 (TOR2) as defined in the EirGrid and SONI Grid Codes. With ongoing implementation of Network Codes, in particular Electricity Balancing, future refinements are possible to 2 EirGrid Grid Code 3 SONI Grid Code ensure alignment with Network Codes. mFRR – Manual Frequency Restoration Reserves Means FRR with manual activation. RR – Replacement Reserve At present includes Replacement Reserve (RR) as defined in the EirGrid and SONI Grid Codes. With ongoing implementation of Network Codes, in particular Electricity Balancing, future refinements are possible to ensure alignment with Network Codes. Reserve providing unit Any provider that has the technical capability to provide reserves, FCR (POR, SOR), FRR (TOR1, TOR2) and RR, having met the applicable Network Code requirements including the additional properties specified in article 4 of the SAOA and having successfully completed the required performance tests. Demand Unit A subset of Demand Units which are defined as Demand Side Units in the EirGrid and SONI Grid Codes and in the ESBN and NIEN Distribution Codes. The definition of a Demand Side Unit is; An Individual Demand Site or Aggregated Demand Site with a Demand Side Unit MW Capacity of at least 4 MW. The Demand Side Unit shall be subject to Central Dispatch. With the implementation of the Demand Connection Code and the HVDC Connection Code future refinements are possible. Table 1 Definitions TITLE 2 LFC area operational agreement in accordance with SOGL Article 120 1. EirGrid and SONI shall continuously monitor the FRCE of the LFC area. The FRCE for the LFC area shall be the frequency deviation.
FRR. Frequency Restoration Reserve At present includes Tertiary Operating Reserve 1 (TOR1) and Tertiary Operating Reserve 2 (TOR2) as defined in the EirGrid and SONI Grid Codes. With ongoing implementation of Network Codes, in particular Electricity Balancing, future refinements are possible to ensure alignment with Network Codes. mFRR – Manual Frequency Restoration Reserves Means FRR with manual activation. aFRR – Automatic Frequency Restoration Reserves Means FRR that can be activated by an automatic control device. aFRR activated by a load frequency controller are at present not used in the IE/NI synchronous area. This is subject to a cost benefit analysis being carried as required by SOGL (Article 145(2)). RR – Replacement Reserve At present includes Replacement Reserve (RR) as defined in the EirGrid and SONI Grid Codes. With ongoing implementation of Network Codes, in particular Electricity Balancing, future refinements are possible to ensure alignment with Network Codes. Dimensioning incident for the purpose of dimensioning FRR In IE/NI this is typically referred to as the imbalance that may arise from the loss of the largest single 4 EirGrid Grid Code
AutoNDA by SimpleDocs
FRR will attempt to rent the unit for the highest possible published rate, but Owner understands that special promotions, discounts, and unit demand will dictate the rental amount.
FRR has full authority to determine rental reservation policies, set rates, discounts, promotional considerations and rental reservation period, and establish housekeeping service levels and charges without prior notice to the Owner.

Related to FRR

  • EPP Registry Operator shall comply with relevant existing RFCs and those published in the future by the Internet Engineering Task Force (IETF) including all successor standards, modifications or additions thereto relating to the provisioning and management of domain names using the Extensible Provisioning Protocol (EPP) in conformance with RFCs 5910, 5730, 5731, 5732 (if using host objects), 5733 and 5734. If Registry Operator implements Registry Grace Period (RGP), it will comply with RFC 3915 and its successors. If Registry Operator requires the use of functionality outside the base EPP RFCs, Registry Operator must document EPP extensions in Internet-­‐Draft format following the guidelines described in RFC 3735. Registry Operator will provide and update the relevant documentation of all the EPP Objects and Extensions supported to ICANN prior to deployment.

  • meminta nasihat daripada Pihak Xxxxxx dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik Xxxxx xxxxxx rasmi di Pejabat Tanah xxx/atau xxxx-xxxx Pihak-pihak Berkuasa yang berkenaan xxx (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja xxx juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya ("Pembeli") dikehendaki dengan segera memohon xxx mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju xxx/atau Pihak Tuanpunya xxx/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa xxx memastikan samada jualan ini dikenakan cukai. BUTIR-BUTIR HARTANAH :- HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan HAKMILIK INDUK / NO. LOT : Pajakan Negeri 35263, Lot No.29096 MUKIM/DAERAH/NEGERI : Setapak / Kuala Lumpur / Wilayah Persekutuan Kuala Lumpur PEGANGAN : Pajakan selama 82-tahun berakhir pada 08/08/2085 KELUASAN LANTAI : 81.104 meter persegi ( 873 kaki persegi ) PEMAJU/PENJUAL : Mega Planner Jaya Sdn Bhd (326287-W)(Dalam Likuidasi) TUANPUNYA : Datuk Bandar Kuala Lumpur PEMBELI : Xxxxxxxx Bin Xxxxx @ Xxxx BEBANAN : Diserahhak kepada RHB Bank Berhad [196501000373 (6171-M)] LOKASI XXX PERIHAL HARTANAH Hartanah tersebut terletak di tingkat 9 pada bangunan apartment 14-tingkat terletak di Melati Impian Apartment, Setapak Fasa 1, Kuala Lumpur. Hartanah tersebut adalah sebuah unit apartment 3 xxxxx dikenali sebaga Xxxxx Pemaju No. 9, Tingkat No.9, Pembangunan dikenali sebagai Melati Impian Apartment Setapak Fasa 1, Kuala Lumpur xxx mempunyai alamat surat-xxxxxxxx xx Xxxx Xx. 0-0, Xxxxxx Impian Apartment, Xxxxx 0/00X, Xxxxx Xxxxxx, 00000 Xxxxx Xxxxxx, Xxxxxxx Xxxxxxxxxxx Xxxxx Xxxxxx. HARGA RIZAB : Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 300,000.00 (RINGGIT MALAYSIA: TIGA RATUS RIBU SAHAJA) xxx tertakluk kepada syarat-syarat Jualan xxx melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat xxx perjanjian yang dikenakan xxx mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi xxx mematuhi syarat-syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada xxx semua xxx xxx perbelanjaan ditanggung xxx dibayar oleh Xxxxx Xxxxxxx.Pembeli atas talian (online) juga tertakluk kepada terma-terma xxx syarat-syarat terkandung dalam xxx.xxxxxxxxxxxxxxxx.xxx Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Bank Berhad sebelum lelongan awam xxx xxxx xxxx xxxxxx hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Bank Berhad melalui Bank Draf / XXXXXX. Butir-butir pembayaran melalui XXXXXX, xxxx berhubung dengan Tetuan Zahrin Emrad & Sujaihah. Untuk maklumat lanjut, xxxx berhubung dengan TETUAN ZAHRIN EMRAD & SUJIAHAH, yang beralamat di Suite 10.3, 10th Floor, Xxx Xxxx Building, Xx.00, Xxxxx Xxxx Xxxxxx, 00000 Xxxxx Xxxxxx. Tel: 00-0000 0000 / Fax: 00-0000 0000. [ Ruj: ZES/ZHR/RHB-FC/16250-17/0614-pae ], peguamcara bagi pihak pemegang xxxxx xxx atau pelelong yang tersebut dibawah. RAJAN AUCTIONEERS SDN. BHD. X. XXXXX Xx.00X,Xxxxxxx Xxxx,Xxxxx Xxxx Xxxxxx, ( Xxxxxxxx Berlesen ) 41000 Klang, Selangor Darul Ehsan. H/P: 000-0000000 Tel: 00-00000000 / Fax : 00-00000000 H/P: 012-2738109 Ruj Kami: RA/RHB/ZES/KL/3989-23(fz) CONDITIONS OF SALE

  • Please Print Name: High School: Graduation Date: Social Security Number Xxxxx State ID: Phone Student’s Signature: _ Date: *********************************************************************************** High School Program Teacher: Please initial and indicate by marking an “X” in the box(s) for the course or courses you recommend this student be given credit for or for which you encourage proficiency testing. Students must earn at least a “B” to be given credit. Student is only eligible to earn “up to 12 articulated credits.” Sign and mail to: Xxxxxx X. XxXxxxx Xxxxx State College 0000 Xxxxx Xxxxxx NW North Canton, Ohio 44720 High School Program Teacher Initials Xxxxx State College (SSC) Course Number Xxxxx State College (SSC) Course Title SSC Credit Hours High School Grade AUT122 Automotive System & Engine Tech 4 High School Program Teacher’s Approval: Date: ********************************************************************************************

  • Checkoff The Employer shall deduct the bi-weekly membership dues from the earnings of those employees who authorize such deductions in writing. The Union shall submit such authorizations and certify the amounts to be deducted at least seven (7) days prior to the end of the payroll period for which the deductions are to be effective and the deductions shall continue in effect until canceled by the employee through the Union. The aggregate deductions of all employees, together with a detailed record, shall be remitted to the Union office within ten (10) days after such deductions are made.

  • Department’s Contract Manager The Department’s Contract Manager, who is primarily responsible for the Department’s oversight of the Contract, will be identified in a separate writing to the Contractor upon Contract signing in the following format: Department’s Contract Manager Name Department’s Name Department’s Physical Address Department’s Telephone # Department’s Email Address If the Department changes the Contract Manager, the Department will notify the Contractor. Such a change does not require an amendment to the Contract.

Time is Money Join Law Insider Premium to draft better contracts faster.