Grant Application Submission Sample Clauses

Grant Application Submission. Following approval by the ARB or HPB and issuance of the appropriate review Certificate, as required, the Grant application and all attachments may be submitted to the Of the Grants Coordinator for formal consideration of funding.
AutoNDA by SimpleDocs
Grant Application Submission. The Grant application and all attachments are submitted to the Facade Program Coordinator for formal consideration of funding. A $50 non-refundable application fee is due with application submission. The application fee offsets the cost of background checks and other necessary due diligence performed by the Façade Program Coordinator.
Grant Application Submission. CITY shall be responsible for final submission of grant application with original physical signature(s), if required.
Grant Application Submission. The Grant Application submission must be submitted electronically, via email, in Adobe Acrobat (.pdf) format (except the Business Case Application Form must remain in the original Excel format) by the submission deadline provided below and must include the full legal name, full contact information and address of the Applicant. The email subject line must include the following: The complete Grant Application should be in one (1) email, including attachments, and should not be larger than 25MB to facilitate receipt by the Province. If multiple emails are required to accommodate attachment sizes, the emails should provide clear instructions on how the Grant Application is to be integrated (e.g., 1 of 3, 2 of 3, 3 of 3). The official time and date of receipt of the Grant Application will be determined by the email received time as recorded by the Government of Alberta’s email server. Applicants should be aware that, prior to such electronic delivery, incoming emails are subject to consistency checks and antivirus scans, processes which can take several minutes or longer to complete. The Province will not be responsible for failures (technical or otherwise) that may result in a Grant Application not being received prior to the Grant Application Closing Date and Time. If the Grant Application cannot be opened after reasonable efforts are made by the Province, the Grant Application will be rejected. The Grant Application should be secured against accidental modification by the Province (with the exception of the Business Case Application Form, which must remain in the original Excel format), and should have the ability to search and print the document in its entirety. Grant Applications must be received on or before 4:30 pm MST Friday, January 6, 2023 by Alberta Health at the following email address: Classification: Public Applicants are responsible for late deliveries of Grant Applications. Alberta Health reserves the right to reject any Grant Application received after the deadline or submitted in a manner other than as described in this document. Faxed Grant Applications will not be accepted. Alberta Health will acknowledge receipt of Grant Applications; the acknowledgment of receipt does not constitute an acknowledgement by Alberta Health that the Grant Application is accurate, complete, or complies with the process.

Related to Grant Application Submission

  • Application Submission Submissions of a rental application does not guarantee approval or acceptance. It does not bind us to accept the application or to sign a Lease contact.

  • New Application for Licensure Any time after the three-month period has lapsed from the Effective Date of this Agreement and Respondent has paid the Administrative Penalty set forth in Section III, Paragraph 1 of this Order, Respondent may apply for a new mortgage loan originator license or, as applicable, petition for the reinstatement of an MLO Activity Endorsement in any or all of the Participating States with the understanding that each State Mortgage Regulator reserves the rights to fully investigate such application for licensure or petition for reinstatement of an MLO Activity Endorsement and may either approve or deny such application or petition pursuant to the normal process for such licensing or endorsement investigations. No license application or petition described in this paragraph will be denied solely based on the facts, circumstances, or consensual resolution provided for in this Agreement. Respondent further agrees that Respondent must satisfy the Administrative Penalty provision prior to submitting an application for a new mortgage loan originator license or, as applicable, petition for the reinstatement of an MLO Activity Endorsement.

  • Claims Submission Unless otherwise prohibited by federal or state law, Provider will submit Clean Claims for all Covered Services to BCBSM within one hundred eighty (180) days of the date of service.

  • Updated Information Submission by Developer The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Large Facility Interconnection Procedures. It shall also include any additional information provided to Connecting Transmission Owner for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Developer’s data is different from what was originally provided to Connecting Transmission Owner and NYISO pursuant to an Interconnection Study Agreement among Connecting Transmission Owner, NYISO and Developer and this difference may be reasonably expected to affect the other Parties’ facilities or the New York State Transmission System, but does not require the submission of a new Interconnection Request, then NYISO will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. Such studies will provide an estimate of any additional modifications to the New York State Transmission System, Connecting Transmission Owner’s Attachment Facilities, or System Upgrade Facilities or System Deliverability Upgrades based on the actual data and a good faith estimate of the costs thereof. The Developer shall not begin Trial Operation until such studies are completed. The Developer shall be responsible for the cost of any modifications required by the actual data, including the cost of any required studies.

  • BID SUBMISSION All Bids are to be packaged, sealed and submitted to the location stated in the Bid Specifications. Bidders are solely responsible for timely delivery of their Bids to the location set forth in the Bid Specifications prior to the stated Bid opening date/time. A Bid return envelope, if provided with the Bid Specifications, should be used with the Bid sealed inside. If the Bid response does not fit into the envelope, the Bid envelope should be attached to the outside of the sealed box or package with the Bid inside. If using a commercial delivery company that requires use of their shipping package or envelope, Bidder’s sealed Bid, labeled as detailed below, should be placed within the shipper’s sealed envelope to ensure that the Bid is not prematurely opened. All Bids must have a label on the outside of the package or shipping container outlining the following information: “BID ENCLOSED (bold print, all capitals) • Group Number • IFB or RFP Number • Bid Submission date and time” In the event that a Bidder fails to provide such information on the return Bid envelope or shipping material, the receiving entity reserves the right to open the shipping package or envelope to determine the proper Bid number or Product group, and the date and time of Bid opening. Bidder shall have no claim against the receiving entity arising from such opening and such opening shall not affect the validity of the Bid or the procurement. Notwithstanding the receiving agency’s right to open a Bid to ascertain the foregoing information, Bidder assumes all risk of late delivery associated with the Bid not being identified, packaged or labeled in accordance with the foregoing requirements. All Bids must be signed by a person authorized to commit the Bidder to the terms of the Bid Documents and the content of the Bid (offer).

  • Application Form To apply for a pole attachment or conduit occupancy license under this Agreement, Applicant shall submit to SWBT two signed copies of the appropriate application forms. SWBT represents that the forms specified in subsections (a)-(b) are forms in use prior to the effective date of this Agreement and that SWBT is in the process of revising such forms to conform to the provisions of this Agreement and to streamline the application process. The parties therefore agree that the forms specified in subsections (a) and (b) will be interim forms only. SWBT reserves the right to change the format and content of these forms upon 60 days written notice to Applicant. (a) To apply for a pole attachment license, Applicant shall submit to SWBT two signed copies of SWBT’s Form SW-9434 (“Access Application and Make- Ready Authorization”) together with completed Form SW-9433 (“Pole Attachments”). An application for a pole attachment license will not be complete or subject to processing by SWBT until these forms have been submitted to SWBT; provided, however, that such forms will be deemed to be substantially complete if they contain the information specified in subsections (c)-(h) below, as applicable. Copies of Forms SW-9433 and SW-9434 are attached to this Agreement as parts of APPENDIX III. (b) To apply for a conduit occupancy license, Applicant shall submit to SWBT two signed copies of SWBT’s Form SW-9434 (“Access Application and Make-Ready Authorization”) together with completed Form SW-9435 (“Conduit Occupancy”). An application for a conduit occupancy license will not be complete or subject to processing by SWBT until these forms have been submitted to SWBT; provided, however, that such forms will be deemed to be substantially complete if they contain the information specified in subsections (c)-(h) below, as applicable. Copies of Forms SW-9434 and SW-9435 are attached to this Agreement as parts of APPENDIX III. (c) Each application for a license under this Agreement shall include, at a minimum, the following information: (1) the poles, ducts, and conduits (including all manholes) along Applicant’s proposed route to or within which Applicant desires to attach or place its facilities; (2) a description of the facilities to be attached to SWBT’s poles and a description of the facilities to be placed within each component of SWBT’s conduit system (including but not limited to ducts, conduits, manholes, and handholes) along the proposed route; (3) for poles, the proposed points of attachment; (4) for building entrance or building distribution ducts or conduits or other space within a building, a conspicuous statement, as required by Section 5.06 of this Agreement, that the application pertains to a building entrance or building distribution duct or conduit or other space within a building; (5) if applicable, a conspicuous notation that the space requested is not to be assigned (or billed) to Applicant until SWBT has received Applicant’s written instruction to make such assignment or issued a license authorizing Applicant to occupy the space requested; and (6) if applicable, a conspicuous statement that Applicant intends to occupy the space before the issuance of a license, as provided in Section 8.03 of this Agreement. (d) Facilities descriptions which apply to multiple pole attachments or conduit occupancies need only be described once on any form. Facilities descriptions shall include, at a minimum, the following information: (1) the number and types of cables, including the physical size (diameter) and weight (weight per foot); (2) the number and types of strands, if any, which will be used to support the cables, including the rated holding capacity expressed in thousand pound increments (e.g., 2.2M) of such strands; and (3) sufficient information to identify and describe the physical characteristics (size, dimensions, and weight) of apparatus enclosures and other facilities to be attached to SWBT’s poles or placed in SWBT’s conduit system. (e) When it appears to Applicant that facilities modification, capacity expansion, or make-ready work may be required to accommodate Applicant’s access requests, Applicant shall describe the facilities modification, capacity expansion, or make-ready work which Applicant proposes. Applicant shall also describe its plans, if any, to use any infrequent construction technique or connectivity solution authorized under Section 6.03 to avoid high or unusual expenditures and state its reasons for the use of such technique or solution. (f) Applicant acknowledges that the poles along a particular pole line or route may include poles owned by firms (such as electric utilities) other than SWBT, that it may be necessary for SWBT to rearrange its facilities or perform other make-ready work on poles other than poles it owns or controls in order to accommodate Applicant’s request for access to SWBT’s poles and that, at the time an application is submitted, it may be difficult for Applicant to determine with certainty whether a particular pole is owned or controlled by SWBT or by another entity. Accordingly, the application shall, to the extent feasible, identify all poles utilized by SWBT (without regard to ownership) along Applicant’s proposed route. (g) Each application for a license under this Agreement shall be accompanied by a construction schedule showing Applicant’s projected dates for beginning and completing construction at the sites specified in the application. Information on this schedule may be used by SWBT’s engineering and outside plant construction personnel in scheduling work required to process Applicant’s applications and scheduling such capacity expansions, make- ready work, and facilities modifications, if any, as may be necessary to accommodate Applicant’s facilities. (h) Applicant may include multiple cables in a single license application and may provide multiple services (e.g., CATV and non-CATV services) under the same cable sheath or jacket. When both CATV and non-CATV services are provided under the same cable sheath or jacket, or CATV and non-CATV services are provided using different cables attached or lashed to the same strand or otherwise occupying the same space on a pole or the same duct or inner duct within a conduit, Applicant will so advise SWBT and SWBT shall, if permitted by law, adjust its charges to enable SWBT to charge Applicant the rate applicable to telecommunications carriers rather than the rate applicable to cable television systems solely to provide cable service.

  • REPORT SUBMISSION 1. Copies of reporting packages for audits conducted in accordance with 2 CFR Part 200, Subpart F-Audit Requirements, and required by PART I of this form shall be submitted, when required by 2 CFR 200.512, by or on behalf of the recipient directly to the Federal Audit Clearinghouse (FAC) as provided in 2 CFR 200.36 and 200.512 A. The Federal Audit Clearinghouse designated in 2 CFR §200.501(a) (the number of copies required by 2 CFR §200.501(a) should be submitted to the Federal Audit Clearinghouse), at the following address: Federal Audit Clearinghouse Bureau of the Census 0000 Xxxx 00xx Xxxxxx Xxxxxxxxxxxxxx, XX 00000 Submissions of the Single Audit reporting package for fiscal periods ending on or after January 1, 2008, must be submitted using the Federal Clearinghouse’s Internet Data Entry System which can be found at xxxx://xxxxxxxxx.xxxxxx.xxx/facweb/ 2. Copies of financial reporting packages required by PART II of this Attachment shall be submitted by or on behalf of the recipient directly to each of the following: A. The Department of Environmental Protection at one of the following addresses: By Mail: Florida Department of Environmental Protection Office of Inspector General, MS 40 0000 Xxxxxxxxxxxx Xxxxxxxxx Tallahassee, Florida 32399-3000 Electronically: XXXXXxxxxxXxxxx@xxx.xxxxx.xx.xx B. The Auditor General’s Office at the following address: Auditor General Local Government Audits/342 Xxxxxx Xxxxxx Building, Room 000 000 Xxxx Xxxxxxx Xxxxxx Xxxxxxxxxxx, Xxxxxxx 00000-1450 The Auditor General’s website (xxxx://xxxxxxxxx.xxx/) provides instructions for filing an electronic copy of a financial reporting package. 3. Copies of reports or management letters required by PART III of this Attachment shall be submitted by or on behalf of the recipient directly to the Department of Environmental Protection at one of the following addresses: By Mail: Florida Department of Environmental Protection Office of Inspector General, MS 40 0000 Xxxxxxxxxxxx Xxxxxxxxx Tallahassee, Florida 32399-3000 Electronically: XXXXXxxxxxXxxxx@xxx.xxxxx.xx.xx 4. Any reports, management letters, or other information required to be submitted to the Department of Environmental Protection pursuant to this Agreement shall be submitted timely in accordance with 2 CFR 200.512, section 215.97, F.S., and Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and for-profit organizations), Rules of the Auditor General, as applicable. 5. Recipients, when submitting financial reporting packages to the Department of Environmental Protection for audits done in accordance with 2 CFR 200, Subpart F-Audit Requirements, or Chapters 10.550 (local governmental entities) and 10.650 (non and for-profit organizations), Rules of the Auditor General, should indicate the date and the reporting package was delivered to the recipient correspondence accompanying the reporting package.

  • Filing of Patent Applications Each Party will make timely decisions regarding the filing of Patent Applications on the CRADA Subject Inventions made solely by its employee(s), and will notify the other Party in advance of filing. Collaborator will have the first opportunity to file a Patent Application on joint CRADA Subject Inventions and will notify PHS of its decision within sixty (60) days of an Invention being reported or at least thirty (30) days before any patent filing deadline, whichever occurs sooner. If Collaborator fails to notify PHS of its decision within that time period or notifies PHS of its decision not to file a Patent Application, then PHS has the right to file a Patent Application on the joint CRADA Subject Invention. Neither Party will be obligated to file a Patent Application. Collaborator will place the following statement in any Patent Application it files on a CRADA Subject Invention: “This invention was created in the performance of a Cooperative Research and Development Agreement with the [INSERT into Agency’s model as appropriate: National Institutes of Health, Food and Drug Administration, Centers for Disease Control and Prevention], an Agency of the Department of Health and Human Services. The Government of the United States has certain rights in this invention.” If either Party files a Patent Application on a joint CRADA Subject Invention, then the filing Party will include a statement within the Patent Application that clearly identifies the Parties and states that the joint CRADA Subject Invention was made under this CRADA.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.

  • Application for approval 3.1. The application for approval of a vehicle type with regard to the AEBS shall be submitted by the vehicle manufacturer or by his authorised representative. 3.2. It shall be accompanied by the documents mentioned below in triplicate: 3.2.1. A description of the vehicle type with regard to the items mentioned in paragraph 2.4., together with a documentation package which gives access to the basic design of the AEBS and the means by which it is linked to other vehicle systems or by which it directly controls output variables. The numbers and/or symbols identifying the vehicle type shall be specified. 3.3. A vehicle representative of the vehicle type to be approved shall be submitted to the Technical Service conducting the approval tests.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!