Initial Assessment Stage Sample Clauses

Initial Assessment Stage. The preparation and submission of a report in accordance with SANRAL’s current appropriate Codes, Manuals and Guidelines and will include as many of the following as are necessary as well as such items deemed necessary in terms of sub-section
AutoNDA by SimpleDocs
Initial Assessment Stage. For this Stage the fee shall be calculated on a time and cost basis in terms of Annexure 2 and shall become due to the Consulting Firm on the submission and approval of the Initial Assessment Report.

Related to Initial Assessment Stage

  • Initial Assessment A Board-designated Administrator shall determine whether the alleged conduct merits an investigation.

  • Special Assessment The intent of a special assessment is to identify problems regarding a member’s performance of duties and, if necessary, to develop a plan to address these problems. When the appropriate Xxxx or Vice President has reasonable grounds to believe there is a problem regarding a member’s performance of duties, the Xxxx shall meet with the member, and any other appropriate individuals, in an attempt to clarify and, if necessary, rectify the situation. If, following such meeting(s), the Xxxx or Vice President determines that a special assessment is called for, the Xxxx shall meet and confer with the appropriate chairperson in the design of an appropriate evaluation, which may or may not involve the DEC, and shall inform the affected member in writing of the particulars of the scheduled evaluation. The evaluator(s) shall submit a written report of the results of the evaluation, including any recommended actions, to the Xxxx, the Chairperson and the affected member; such report shall be placed in the member’s personnel file. Should the evaluation report identify matters requiring remedial action, the evaluators, in consultation with the affected member, shall develop a specific plan with a schedule of compliance, which shall be implemented. The evaluators shall provide a written copy of the plan to be implemented to the affected member, the Xxxx or Vice President, and the member’s personnel file. If the member fails to cooperate, the matter may be remanded to the process of Article 16. In the event that the member in question is the Spokesperson or the department Chairperson, that role in the process shall be filled by the Chairperson of the DEC. Records of a special assessment and related documents shall be removed from the personnel file following the affected member’s next formal evaluation, unless the Xxxx, in consultation with the DEC, determines otherwise.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Project Completion Date It is agreed between the Parties that the Project Completion Date is <END DATE, YEAR>. If the Project is not completed by such date then, subject to an amendment agreed to between the Parties, Alberta Innovates may elect to terminate this Investment Agreement. In such event, Alberta Innovates will notify the Applicant of its decision to terminate as soon as reasonably practical and shall advise the Applicant of the effective date of termination. Alberta Innovates will have no liability or obligation to reimburse the Applicant for any Project Costs incurred after the effective date of termination and may require the Applicant to return any portions of the Investment which were spent on Ineligible Expenses. Additionally, any portion of the Investment not used and accounted for in accordance with this Agreement as of the Project Completion Date or earlier termination is repayable by the Applicant to AI at AI’s request.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Final Completion Date Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by September 30, 2022.

  • Final Certificate, Design Professional’s Certificate of Final Completion The Certificate issued by the Design Professional stating that all work has been completed in accordance with the terms of the Contract Documents. See Section 6,

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Special Assessments Sellers shall pay all special assessments which are a lien on the Real Estate as of the date of this contract. All other special assessments shall be paid by Xxxxxx.

  • Real Estate Taxes and Special Assessments The 2022 calendar year real estate taxes due and payable in 2023 shall be paid by Seller. Seller shall credit Buyer(s) at closing for said 2022 real estate taxes payable in 2023 based on the most recent ascertainable tax figures. Xxxxx is responsible for all subsequent real estate taxes.

Time is Money Join Law Insider Premium to draft better contracts faster.