Installation of the measuring equipment. The instrumentation and sample probes shall be installed as required. When using a full flow dilution system for exhaust gas dilution, the tailpipe shall be connected to the system.
Installation of the measuring equipment. The opacimeter and sample probes, if applicable, must be installed after the exhaust silencer or any after-treatment device, if fitted, according to the general installation procedures specified by the instrument manufacturer. Additionally, the requirements of paragraph 10 of ISO 11614 must be observed, where appropriate. Prior to any zero and full scale checks, the opacimeter must be warmed up and stabilised according to the instrument manufacturer's recommendations. If the opacimeter is equipped with a purge air system to prevent sooting of the meter optics, this system must also be activated and adjusted according to the manufacturer's recommendations.
Installation of the measuring equipment. The instrumentation and sample probes must be installed as required. The tailpipe must be connected to the full flow dilution system.