Integrated Traffic Management Plan. The Contractor shall prepare an integrated plan showing the arrangements to be made for accommodating road and pedestrian traffic, at individual construction sites, to smooth traffic operations and for the safety of both construction workers and road users. The Plan shall consider different measures such as:
AutoNDA by SimpleDocs
Integrated Traffic Management Plan. The Contractor shall prepare an integrated plan showing the arrangements to be made for accommodating road and pedestrian traffic, at individual construction sites and continuously along the alignment, including arrangements being implemented by other contractors, to smooth traffic operations and for the safety of both construction workers and road users. The Plan shall consider different measures such as: • The use of suitable construction sequences and methods for the construction of substructure and superstructure of bridges and interchanges, to reduce the period of disruption to road users; • proper phasing and timing of traffic signals; • modifications to intersection geometry; • changes in lane usage; • parking prohibitions; • re-location of bus stops; • maintenance of existing roads within the vicinity of the Works areas; • reducing width of footpaths and median; • right-turn prohibition; • work site access management; • minimising the duration of any road closure; • reversible lane operations; • modification of roadway alignment affected by the construction, which shall be in conformance with the requirements and regulations defined by the relevant authorities; • at all times scrupulously follow the conditions and directions provided by the Traffic PoliceDepartment • other engineering traffic measures as may be applicable.

Related to Integrated Traffic Management Plan

  • Project Management Plan 6.4.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan and Good Industry Practice.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Traffic Management 9.2.1 During the Operating Period, Developer shall be responsible for the general management of traffic on the Facility. Developer shall manage traffic so as to preserve and protect safety of traffic on the Facility and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Facility and Related Transportation Facilities. Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Technical Documents, Laws and Governmental Approvals, and in accordance with the Traffic Management Plan.