Landlord’s Option to Repair Notwithstanding the terms of Section 11.1 of this Lease, Landlord may elect not to rebuild and/or restore the Premises, Building and/or Project, in which event this Lease shall terminate, by notifying Tenant in writing of such termination within sixty (60) days after the date of discovery of the damage, such notice will include a termination date giving Tenant sixty (60) days to vacate the Premises, but this Lease may be so terminated Landlord may so elect only if the Building or Project shall be damaged by fire or other casualty or cause, whether or not the Premises are affected, and one or more of the following conditions is present: (i) in Landlord’s reasonable judgment, repairs cannot reasonably be completed within one hundred eighty (180) days after the date of discovery of the damage (when such repairs are made without the payment of overtime or other premiums); (ii) the holder of any mortgage on the Building or Project or ground lessor with respect to the Building or Project shall require that the insurance proceeds or any portion thereof be used to retire the mortgage debt, or shall terminate the ground lease, as the case may be; (iii) the damage is not fully covered by Landlord’s insurance policies or that portion of the proceeds from Landlord’s insurance policies allocable to the Building or the Project, as the case may be; (iv) Landlord decides to rebuild the Building or Common Areas so that they will be substantially different structurally or architecturally; (v) the damage occurs during the last twelve (12) months of the Lease Term; or (vi) any owner of any other portion of the Project, other than Landlord, does not intend to repair the damage to such portion of the Project; provided, however, that if such fire or other casualty shall have damaged the Premises or a portion thereof or Common Areas necessary to Tenant’s occupancy and as a result of such damage the Premises are unfit for occupancy, and provided that Landlord does not elect to terminate this Lease pursuant to Landlord’s termination right as provided above, and either (a) the repairs cannot, in the reasonable opinion of Landlord’s contractor, be completed within two hundred seventy (270) days after being commenced, or (b) the damage occurs during the last twelve months of the Lease Term and will reasonably require in excess of ninety (90) days to repair, Tenant may elect, no earlier than sixty (60) days after the date of the damage and not later than ninety (90) days after the date of such damage, to terminate this Lease by written notice to Landlord effective as of the date specified in the notice, which date shall not be less than thirty (30) days nor more than sixty (60) days after the date such notice is given by Tenant.
Tenant’s Right to Terminate Tenant shall have the right to terminate this Lease following a Casualty if any of the following occurs: (i) Landlord’s Architect determines (which determination shall be made and forwarded to Tenant promptly after such Casualty) that the Premises cannot, with reasonable diligence, be repaired by Landlord to a substantially similar condition as existed prior to such Casualty (or cannot be safely repaired because of the presence of hazardous factors, including, but not limited to, Hazardous Materials, earthquake faults and other similar dangers) within 360 days after the date of such Casualty and the Casualty materially adversely impacts Tenant’s use of a material portion of the Premises, or (ii) the Premises is destroyed or materially damaged during the last twelve (12) months of the Lease Term and Landlord’s Architect determines (which determination shall be made and forwarded to Tenant promptly after such Casualty) that such damage will require more than sixty (60) days to repair, or (iii) the Premises are not actually repaired by Landlord to a substantially similar condition as existed prior to such Casualty within 380 days following such Casualty and the Casualty materially adversely impacts Tenant’s use of a material portion of the Premises. If Tenant elects to terminate this Lease following a Casualty pursuant to this Section 7.3, Tenant shall give Landlord written notice of its election to terminate within thirty (30) days after receipt of Landlord’s Architect’s determination (or within 30 days of the applicable restoration period should Landlord fail to complete repairs during such period), and this Lease shall terminate as of the date of such notice of election to terminate.
Landlord’s Right to Terminate Landlord shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised only by delivery to Tenant of a written notice of election to terminate within thirty days after the date of such damage or destruction: (a) The Building is damaged by any peril covered by valid and collectible insurance actually carried by Landlord and in force at the time of such damage or destruction or by any peril which would have been covered by the insurance Landlord is required to maintain pursuant to Section 9.2 (an "Insured Peril") to such an extent that the estimated cost to restore the Building exceeds the lesser of (i) the insurance proceeds available from insurance actually carried by Landlord (or which Landlord was required to carry pursuant to Section 9.2(a) hereof) plus the amount of any deductible (up to a maximum amount of five percent (5%) of the replacement cost of the Building), plus any amount that the Tenant agrees in writing to contribute towards restoration, or (ii) fifty percent of the then actual replacement cost of the Building; (b) The Building is damaged by an uninsured peril, which peril Landlord was not required to insure against pursuant to the provisions of Article 9 of this Lease, provided, however, that, subject to the requirements of the holder of any deed of trust encumbering the Property, Landlord shall not have the right to terminate this Lease if Tenant notifies Landlord, within thirty (30) days after Tenant receives Landlord's written notice of termination pursuant to this Section 10.3, that Tenant will pay for the cost of restoration of the Leased Premises, in excess of any insurance proceeds to be received by Landlord. (c) The Building is damaged by any peril and, because of the laws then in force, the Building (i) cannot be restored at reasonable cost or (ii) if restored, cannot be used for the same use being made thereof before such damage.
Landlord’s Options At any time within ten (10) business days after Landlord’s receipt of all of the information required in the Transfer Notice, Landlord may by written notice to Tenant elect to: (a) sublease itself the Transfer Space specified in the Transfer Notice, for the term proposed, in the case of a proposed Sublease, (b) take an Assignment of Tenant’s leasehold estate specified in the Transfer Notice in the case of a proposed Assignment, or (c) terminate this Lease as to the entire Transfer Space specified in the Transfer Notice, in the case of a proposed Assignment or Sublease for all or substantially all of the remaining Term, with a proportionate abatement in the rent payable hereunder. In the event Landlord elects to Sublease or take an Assignment from Tenant as described in Paragraphs (a) and (b) above, the rent payable by Landlord shall be the rent that would have been payable to Tenant under such proposed Transfer, with Landlord and Tenant sharing the Profits, if any, under such Sublease or Assignment to Landlord in the same manner as is set forth in Section 14.5. If Landlord elects to terminate this Lease as to the Transfer Space as described in Paragraph (c) above, then Landlord shall pay to Tenant, at the same times and in the same amounts, the share of Profits that Tenant would have received from a Transfer of such Transfer Space on the terms provided in the Transfer Notice. In the event Landlord elects any of the options set forth in Paragraphs (a), (b) and (c) above, the effective date of the Assignment or Sublease by Tenant to Landlord (or, if applicable, the termination of the Lease by Landlord) shall be the date specified by Tenant in the Transfer Notice, or if elected by Landlord, up to ninety (90) days thereafter. After any such election by Landlord, Landlord shall be entitled to re-lease or sub-sublease the Transfer Space in Landlord’s discretion. In the event Landlord elects any of the options set forth in Paragraphs (a), (b) and (c) above with respect to a portion of the Premises, (i) Tenant shall at all times provide reasonable and appropriate access to such portion of the Premises and use of any common facilities in the Premises, (ii) Landlord shall have the right to use such portion of the Premises subject to Landlord’s election without the consent of Tenant, and (iii) Tenant shall reimburse Landlord for the reasonable cost of any demising wall necessary to separate the Transfer Space from the remainder of the Premises. If Tenant does not consummate a Transfer with respect to the Transfer Space within one hundred eighty (180) days after the Transfer Notice, Tenant shall, if Tenant continues to contemplate a Transfer, deliver a new Transfer Notice and Landlord shall again have the options set forth in this Section 14.3.
Landlord’s Termination Right Whether or not the Premises are affected, Landlord may, by notice to Tenant, within 60 days following the date upon which Landlord receives notice of the Taking of all or a portion of the Real Property, the Building or the Premises, terminate this Lease, provided that Landlord elects to terminate leases (including this Lease) affecting at least 50% of the rentable area of the Building.
Tenant’s Repairs Tenant, at its expense, shall promptly make all repairs and replacements of every kind and nature, whether foreseen or unforeseen, which may be required to be made upon or in connection with the Premises. Landlord shall not be required to make any repair, whether foreseen or unforeseen, or to maintain any of the Premises in any way. Any repair or replacement shall be performed at the Tenant's expense by contractors approved by Landlord, or at Landlord's option, by Landlord. Such repair and replacements include capital expenditures and repairs whose benefit extend beyond the Lease Term. Heating, ventilation and air conditioning systems and other mechanical and building systems serving the Premises shall be maintained at Tenant's expense pursuant to maintenance service contracts entered into by Tenant. The scope of services and contractors under such maintenance contracts shall be reasonably approved by Landlord. If Tenant fails to perform any repair or replacement for which it is responsible, Landlord may perform such work and be reimbursed by Tenant within ten (10) days after demand therefor. Subject to the Restoration and Condemnation Paragraphs, Tenant shall bear the full cost of any repair or replacement to any part of the Premises that results from damage caused by Tenant, its agents, contractors, or invitees and any repair that benefits only the Premises. If any present or future improvements to the Premises are made or authorized to be made by Tenant, its agents or employees, and such improvements shall encroach upon any property or street adjacent to the Premises, or shall violate any agreement or condition contained in any restrictive covenant affecting or applicable to the Premises, or shall impair the rights of others under any easement or right-of-way to which the Premises are subject, then upon request of Landlord, Tenant, at its cost and expense, shall take such action as shall be necessary to remove such encroachments or end such violation or impairment. Notwithstanding the foregoing, Tenant shall not be required to remove any such encroachments if Tenant has or obtains such easements, licenses or similar rights as may be necessary to permit such encroachments to remain.
LANDLORD'S SERVICES Provided Tenant is not in default hereunder and is occupying a substantial portion of the Premises, Landlord, at Xxxxxxxx's expense (but subject to the reimbursement provisions of Article 5 and except as otherwise provided in this Lease) shall furnish to Tenant the following services: (a) Air-conditioning and central heat at such temperatures and in such amounts as are reasonably considered by Landlord to be standard for the Building, during normal business hours for the Building as set forth in the Rules and Regulations attached as Exhibit "E" hereto. (b) Janitorial cleaning services in the Premises and public and exterior portions of the Building for all days, except Saturdays, Sundays and holidays; provided, however, if Tenant's floor covering or other improvements are other than Building Standard, Tenant shall pay the additional cleaning cost attributable thereto as additional Rent upon presentation of a statement therefor by Landlord. (c) Hot and cold water at those points of supply provided for general use of other tenants in the Building. (d) Normal and customary routine maintenance for all public, structural, and exterior portions of the Project according to Landlord's standards. (e) Electric lighting service for all public portions of the Project in the manner and to the extent reasonably deemed by Landlord to be standard for comparable buildings in the market area. (f) Automatic passenger elevator service for access to and egress from the Premises. Freight elevator service, in common with other tenants, shall be provided during reasonable business hours as prescribed by Landlord, exclusive of Saturdays, Sundays, and holidays. Landlord may reduce the number of elevators operating outside of business hours. (g) All Building Standard fluorescent bulb replacement in all common and public areas, toilet and restroom areas and stairwells. (h) Electrical facilities to furnish sufficient power for typewriters, calculating machines and other machines of similar low electrical consumption (total electrical power requirement not to exceed one watt per square foot of rentable area); but not including electricity required for electronic data processing equipment, special lighting in excess of Building Standard, and any other item of electrical equipment, the electrical power equipment of which (singly) is more than 0.5 kilowatts per hour at rated capacity or requires a voltage other than 120 volts single phase; and provided that Landlord shall not be obligated to provide (unless otherwise specifically agreed upon in writing) dedicated circuits or electrical power in excess of Building Standard and provided that if the installation of said electrical equipment requires additional air conditioning capacity above that provided by the Building Standard system, then the additional air conditioning installation and operating costs will be the obligation of Tenant. Landlord, at its option, may cause a water meter, electric current meter or such similar device to be installed on the Premises so as to measure the amount of water and electric current consumed by Tenant. The cost of any such meters and of the installation, maintenance and repair thereof shall be paid for by Xxxxxx and Xxxxxx agrees to pay to Landlord, promptly upon demand by Landlord, for all such excess water and electric expense incurred. If a separate meter is not installed or Landlord is prevented from installing a separate meter by operation of law or other cause beyond Landlord's control, such excess costs for such water and electric current will be established by an estimate made by the utility company, electrical engineer, or an independent consultant, which estimate shall be binding on Tenant. (i) Security services as Landlord may from time to time reasonably deem to be standard for comparable buildings in the market area. NOTWITHSTANDING ANYTHING HEREIN TO THE CONTRARY, TENANT EXPRESSLY ACKNOWLEDGES AND AGREES THAT LANDLORD IS NOT WARRANTING THE EFFICACY OF ANY SUCH SECURITY PERSONNEL, SERVICE, PROCEDURES OR EQUIPMENT AND THAT TENANT IS NOT RELYING AND SHALL NOT HEREAFTER RELY ON ANY SUCH PERSONNEL, SERVICE, PROCEDURES OR EQUIPMENT. LANDLORD SHALL NOT BE RESPONSIBLE OR LIABLE IN ANY MANNER FOR FAILURE OF ANY SUCH SECURITY PERSONNEL, SERVICES, PROCEDURES OR EQUIPMENT TO PREVENT OR CONTROL, OR APPREHEND ANYONE SUSPECTED OF, PERSONAL INJURY OR DAMAGE IN, ON OR AROUND THE PROJECT.
Option to Extend Lease Term At the expiration of the original Lease Term, Tenant may extend this Lease as to the entire Premises or a portion of the Premises for two (2) extended terms of five (5) years each (each an “Extended Term”) by giving Landlord written notice (the “Option Notice”) of its intention to do so not later than twelve (12) months prior to the expiration of the original Lease Term, and thereafter twelve (12) months prior to the expiration of the applicable Extended Term; provided, however, that Tenant is not in material default beyond any applicable notice and cure period under the Lease on the date of giving such notice or on the date of commencement of such Extended Term. The Option Notice shall set forth Tenant’s election to extend the Lease for all or a portion of the Premises. If Tenant elects to extend the Lease for only a portion of the Premises, the portion of the Premises for which Tenant elects not to extend the Lease shall be: (i) either located entirely on one floor of the Premises or located on one entire floor and a portion of the other floor; (ii) a minimum of 15,000 RSF; (iii) adjacent to a window line and easily accessible; and (iv) shall be in a readily marketable and leasable location. Landlord shall be responsible for any and all costs to separate the portion of the Premises for which Tenant elects not to extend the Lease from the remainder of the Premises such that the space is a separate easily accessible and readily marketable space promptly following the commencement of the applicable Extended Term. Any termination of the entire Lease shall result in automatic termination of this option. Tenant’s right to extend the Lease Term provided herein is personal to Tenant and may not be assigned or otherwise transferred except in connection with a permitted assignment of this Lease, including to a Tenant’s Affiliate. The Extended Term shall be upon all of the terms and conditions of this Lease, except that the following rights of Tenant during the original Lease Term shall not apply during such Extended Term unless granted as part of the Fair Market Rental: (a) any right to rent-free possession; (b) any right to further extension of the Lease Term beyond the Extended Terms set forth herein above; (c) any right to continue to pay the same Base Rent; (d) any right to additional Tenant Allowance; (e) any right to terminate the Extended Term early; (f) any right to continue to exclude HVAC Capital Expenditures; (g) cost of security for the Building; and (h) the right to the continuation of any cap on Controllable Operating Expenses from the previous year (it being understood that the Operating Expenses for the first twelve (12) months of each new Extended Term shall be the actual Operating Expenses without any cap and thereafter the cap set forth in Section 4.2(e) shall apply). Landlord and Tenant hereby acknowledge and agree that the Base Rent during each Extended Term shall be equal to ninety-five (95%) of the Base Rent component of the “Fair Market Rental” and one hundred percent (100%) of the economic concessions, including without limitation, free rent, improvement allowance, base year and other monetary concessions, component of the Fair Market Rental for the Premises, as determined by as follows: (a) Concurrent with Tenant’s delivery of each Option Notice, Tenant shall provide Landlord with written notice of its determination of Fair Market Rental for the Premises (“Tenant’s Determination of FMR”). Within thirty (30) days after Landlord’s receipt of Tenant’s Determination of FMR, Landlord shall, by written notice delivered to Tenant, either (a) accept Tenant’s Determination of FMR (“Notice of Acceptance”), or (b) reject Tenant’s Determination of FMR (“Notice of Rejection”). If Landlord does not deliver either the Notice of Acceptance or the Notice of Rejection within said thirty (30) day period, Landlord shall be deemed to have accepted Tenant’s Determination of FMR. If Landlord delivers a Notice of Rejection, Landlord shall also concurrently deliver to Tenant Landlord’s determination of Fair Market Rental for the Premises (“Landlord’s Determination of FMR”). If Landlord delivers the Notice of Rejection within said thirty (30) day period, the parties shall negotiate in good faith in an effort to agree upon the Fair Market Rental within thirty (30) days after Landlord delivers the Notice of Rejection (“Negotiation Period”). (b) If the parties fail to agree on the Fair Market Rental for such Extended Term during the Negotiation Period, then the Fair Market Rental shall be established as set forth below. Within fifteen (15) days following expiration of the Negotiation Period, Landlord and Tenant shall mutually agree upon a broker to determine the Fair Market Rental and shall concurrently deliver their final Tenant’s Determination of FMR and final Landlord’s Determination of FMR to use for the arbitration procedure set forth below; provided however, that if the difference between the final Landlord’s Determination of FMR and the final Tenant’s Determination of FMR is five percent (5%) or less, then a broker shall not be designated and the Fair Market Rental shall equal the average of the two (2) determinations. If Landlord and Tenant cannot agree upon a broker, then either party hereunder may request that the Presiding Judge of the Maricopa County Superior Court appoint such broker. Within ten (10) business days after the selection of the broker, such broker shall select either the final Landlord’s Determination of FMR or the final Tenant’s Determination of FMR in its entirety, without averaging or otherwise adjusting such value in any manner, and shall notify the parties of his or her decision. The broker’s decision concerning the Fair Market Rental shall be binding upon the parties, shall not be subject to any right of appeal and shall constitute the Rent payable by Tenant during the Extended Term. (c) Landlord and Tenant intend that the “Fair Market Rental” shall be deemed to be the rent per square foot of rentable area of space that is then being charged for space located in buildings in the vicinity of the Building that are comparable in quality, age and size and offer similar amenities to the Building (“Comparable Buildings”) and involving non-renewing leases (i.e. leases where the tenant is not already occupying the leased premises) with similar terms and conditions, and involving the use of the premises for similar purposes allowed under the Lease for tenants of similar size, credit quality and stature and include current market concessions including tenant improvement allowances, abatement, downtime to secure a new tenant and build out space, brokerage commissions, a new base year (if given in comparable deals) and/or the anticipated budget for Additional Rent, inducements and other economic considerations for the lease of space comparable to the Premises then being offered in similar buildings in the Southeast Valley Submarket. The spaces used for comparison shall be comparable in size, age, quality and design to the Premises, and such spaces used for comparison shall be comparable to the Premises with respect to their location within such buildings, the quality and quantity of tenant improvements installed at each landlord’s expense, the services provided by each landlord to such tenant, and the financial strength of tenant. (d) The parties shall share equally in the cost of the broker. No person shall be appointed or designated a broker unless he or she is a real estate broker licensed in the State of Arizona, who specializes in the field of commercial office space leasing in the Southeast Valley market, has at least ten (10) years’ experience in leasing of commercial office space in the Southwest Valley market and is recognized within the field as being reputable and ethical. The broker shall not have ever been employed (full-time or part-time or on a consulting basis) by Landlord or Tenant. (e) In the event that the Fair Market Rental is not established before the commencement of the Extended Term, Tenant shall continue to pay the Base Rent in effect as of the end of the prior term; when the Fair Market Rental has been established, the new Base Rent and concessions granted pursuant to the Fair Market Rental shall be retroactively effective as of the beginning of the Extended Term, and Tenant shall pay Landlord any deficiency or Tenant shall receive a credit, as applicable, with in thirty (30) days after the establishment of the new Fair Market Rental.
Landlord’s Repairs Landlord, as an Operating Expense, shall maintain all of the structural, exterior, parking and other Common Areas of the Project, including HVAC, plumbing, fire sprinklers, elevators and all other building systems serving the Premises and other portions of the Project (“Building Systems”), in good repair, reasonable wear and tear and uninsured losses and damages caused by Tenant, or by any of Tenant’s agents, servants, employees, invitees and contractors (collectively, “Tenant Parties”) excluded. Losses and damages caused by Tenant or any Tenant Party shall be repaired by Landlord, to the extent not covered by insurance, at Tenant’s sole cost and expense. Landlord reserves the right to stop Building Systems services when necessary (i) by reason of accident or emergency, or (ii) for planned repairs, alterations or improvements, which are, in the judgment of Landlord, desirable or necessary to be made, until said repairs, alterations or improvements shall have been completed. Landlord shall have no responsibility or liability for failure to supply Building Systems services during any such period of interruption; provided, however, that Landlord shall, except in case of emergency, make a commercially reasonable effort to give Tenant 24 hours advance notice of any planned stoppage of Building Systems services for routine maintenance, repairs, alterations or improvements. Tenant shall promptly give Landlord written notice of any repair required by Landlord pursuant to this Section, after which Landlord shall make a commercially reasonable effort to effect such repair. Landlord shall not be liable for any failure to make any repairs or to perform any maintenance unless such failure shall persist for an unreasonable time after Tenant’s written notice of the need for such repairs or maintenance. Tenant waives its rights under any state or local law to terminate this Lease or to make such repairs at Landlord’s expense and agrees that the parties’ respective rights with respect to such matters shall be solely as set forth herein. Repairs required as the result of fire, earthquake, flood, vandalism, war, or similar cause of damage or destruction shall be controlled by Section 18.
LANDLORD’S MAINTENANCE AND REPAIR Subject to Section 7.1 and Article XI, Landlord shall provide service, maintenance and repair with respect to any air conditioning, ventilating or heating equipment which serves the Premises (exclusive, however, of supplemental HVAC equipment serving only the Premises), and shall maintain in good repair the roof, foundations, footings, the exterior surfaces of the exterior walls of the Building (including exterior glass), and the structural, electrical and mechanical systems, except that Tenant at its expense shall make all repairs which Landlord deems reasonably necessary as a result of the act or negligence of Tenant, its agents, employees, invitees, subtenants or contractors. Landlord shall have the right to employ or designate any reputable person or firm, including any employee or agent of Landlord or any of Landlord's affiliates or divisions, to perform any service, repair or maintenance function. Landlord need not make any other improvements or repairs except as specifically required under this Lease, and nothing contained in this Section shall limit Landlord's right to reimbursement from Tenant for maintenance, repair costs and replacement costs as provided elsewhere in this Lease. Tenant understands that it shall not make repairs at Landlord's expense or by rental offset. Tenant further understands that Landlord shall not be required to make any repairs to the roof, foundations, footings, the exterior surfaces of the exterior walls of the Building (excluding exterior glass), or structural, electrical or mechanical systems unless and until Tenant has notified Landlord in writing of the need for such repair and Landlord shall have a reasonable period of time thereafter to commence and complete said repair, if warranted. All costs of any maintenance, repairs and replacement on the part of Landlord provided hereunder shall be considered part of Project Costs. Tenant further agrees that if Tenant fails to report any such need for repair in writing within sixty (60) days of its discovery by Tenant, Tenant shall be responsible for any costs and expenses and other damages related to such repair which are in excess of those which would have resulted had such need for repair been reported to Landlord within such sixty (60) day period.