Metering and Data Acquisition System Equipment Sample Clauses

Metering and Data Acquisition System Equipment. Measurement of electric energy for the purposes of determining load and effecting settlements, and monitoring and telemetering of power flows under this Agreement shall be made by metering and DAS equipment installed and maintained, by either DEP or Dominion Energy at the Interconnection Points consistent with the provisions of Appendix II and III of this Agreement. Any aspects of metering and DAS equipment not specifically provided for by this Agreement shall be referred to the Operating Committee pursuant to Article 6.
AutoNDA by SimpleDocs
Metering and Data Acquisition System Equipment. Consistent with Appendix II and III of this Agreement and applicable RTO Requirements, the Parties or an Affiliate shall install and maintain metering equipment and data acquisition system (“DAS”) equipment at each Interconnection Point for measuring electric energy for the purposes of determining load, effecting settlements, and monitoring and telemetering power flows under this Agreement. The Parties are responsible for providing all Supervisory Control and Data Acquisition (“SCADA”) data to their respective RTO pursuant to applicable RTO requirements. The Parties may receive operational data regarding the interconnection between the Parties via Inter-control Center Communications Protocol (“ICCP”) data links. Should an interruption of the communication equipment interfere with either Party’s access to the SCADA data, the Parties shall use Due Diligence to resolve the problem as quickly as possible.
Metering and Data Acquisition System Equipment. Metering Equipment The net interchange of electrical energy between the Transmission Systems at the Interconnection Points shall be measured by the operational quality metering and, if required or otherwise agreed to by the Parties and PJM, revenue quality meters specified in Appendix II. The metering equipment shall satisfy applicable American National Standards Institute standards and applicable PJM metering standards and PJM Requirements. Each Party shall own, operate and maintain such recording, telemetering, communication, and control facilities on their respective side of the Points of Interconnection (unless otherwise specified in Appendix II) as required for coordinated operation. Except for the charge referenced in Section 4.2, no specific charge will apply to either Party for the installation, replacement, operation, maintenance or testing of such equipment. Maintenance, Testing, and Calibration of Metering Equipment Procedures with respect to maintenance, testing, calibrating, and precision tolerance of all metering equipment shall be performed in accordance with Good Utility Practice. The expense of testing any meter shall be borne by the Party owning such meter, except for when a meter is tested at the request of the other Party and is found to register within the established tolerance. In such circumstances, the Party making the request shall bear the expense of the test.
Metering and Data Acquisition System Equipment 

Related to Metering and Data Acquisition System Equipment

Time is Money Join Law Insider Premium to draft better contracts faster.