Common use of Metering Clause in Contracts

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 180 contracts

Samples: Service Agreement, Standard Small Generator Interconnection Agreement, Service Agreement

AutoNDA by SimpleDocs

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 54 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement, Small Generator Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s Provider's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 30 contracts

Samples: Small Generator Interconnection Agreement (Sgia), Small Generator Interconnection Agreement (Sgia), Small Generator Interconnection Agreement (Sgia)

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s Distribution Provider's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 23 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement, Small Generator Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerUtility’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments Appendices 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 16 contracts

Samples: Generator Interconnection Agreement, Generator Interconnection Procedures, Interconnection Procedures

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 14 contracts

Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement, Small Generator Interconnection Agreement (Sgia)

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2527

Appears in 8 contracts

Samples: Service Agreement, Interconnection Agreement, Standard Small Generator Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Interconnecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments Attachment 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 8 contracts

Samples: Service Agreement, Small Generator Interconnection Agreement, Standard Small Generator Interconnection Agreement (Sgia)

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2556

Appears in 6 contracts

Samples: Interconnection Agreement, Service Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2591

Appears in 6 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2572

Appears in 6 contracts

Samples: Standard Small Generator Interconnection Agreement, Service Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s 's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 6 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2557

Appears in 6 contracts

Samples: Standard Small Generator Interconnection Agreement, Standard Small Generator Interconnection Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2550

Appears in 4 contracts

Samples: Standard Small Generator Interconnection Agreement, Service Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2554

Appears in 4 contracts

Samples: Service Agreement, Standard Small Generator Interconnection Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2638

Appears in 4 contracts

Samples: Service Agreement, Service Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s Distribution Provider's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements. Nothing in this provision replaces or alters the metering requirements in the Interconnection Customer’s PPA.

Appears in 3 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2555

Appears in 3 contracts

Samples: Service Agreement, Service Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2546

Appears in 3 contracts

Samples: Service Agreement, Service Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2573

Appears in 3 contracts

Samples: Standard Small Generator Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2526

Appears in 3 contracts

Samples: Service Agreement, Service Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2600

Appears in 3 contracts

Samples: Service Agreement, Standard Small Generator Interconnection Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2646

Appears in 2 contracts

Samples: Standard Small Generator Interconnection Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2778

Appears in 2 contracts

Samples: Service Agreement, Standard Small Generator Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2756

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2662

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2553

Appears in 2 contracts

Samples: Service Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2673

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2436

Appears in 2 contracts

Samples: Sgia, Service Agreement

AutoNDA by SimpleDocs

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerAuthority’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments Appendices 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 2 contracts

Samples: Generator Interconnection Procedures, Generator Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2608

Appears in 1 contract

Samples: Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerProvider’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 1 contract

Samples: Standard Small Generator Interconnection Agreement (Sgia)

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2574

Appears in 1 contract

Samples: Standard Small Generator Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s Distribution Provider's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements. Nothing in this provision replaces or alters the metering requirements of Schedule RES-BCT.

Appears in 1 contract

Samples: Generator Interconnection Agreement (Gia)

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerCity’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments Appendices 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 1 contract

Samples: Interconnection Procedures

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2666

Appears in 1 contract

Samples: Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerUtility’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 exhibits of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 1 contract

Samples: Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerProviderOwner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.Requirement s.

Appears in 1 contract

Samples: Standard Small Generator Interconnection Agreement (Sgia)

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerProvider’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 1 and 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 1 contract

Samples: Small Generator Interconnection Agreement (Sgia)

Metering. The Interconnection Customer shall will be responsible for the Connecting Transmission Owner’s Provider's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments Appendices 1 and 2 and 3 of this Agreementagreement. The Interconnection Interconnection. Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirementsoperating requirements.

Appears in 1 contract

Samples: Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerDistribution Provider’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements. Nothing in this provision replaces or alters the metering requirements in the Interconnection Customer’s PPA.

Appears in 1 contract

Samples: Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s Provider's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 1 contract

Samples: Standard Small Generator Interconnection Agreement (Sgia)

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s Public Utility's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Interconnection Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 1 contract

Samples: Non Net Metering Electrical Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2696

Appears in 1 contract

Samples: Service Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission OwnerUtility’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment or telemetry equipment specified in Attachments Appendices 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisitionacquisition and telemetry, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Appears in 1 contract

Samples: Interconnection Agreement

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s Provider's reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s 's metering (and data acquisition, as required) equipment shall conform to applicable industry rules rules, and the Transmission Provider’s Operating Requirements...

Appears in 1 contract

Samples: Small Generator Interconnection Agreement (Sgia)

Metering. The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.. SERVICE AGREEMENT NO. 2777

Appears in 1 contract

Samples: Service Agreement