NTD Progress Sample Clauses

NTD Progress. Notable progress has been made towards the 2020 and 2030 goals. The WHO reported that approximately 991M people received PC for at least one PC-NTD in 2015, representing 62.9% of those in need (WHO, 2017b). Additionally, MDA treatment coverage in 2015 was around 60% for LF and onchocerciasis, two PC-NTDs affecting approximately 856M and 18M individuals respectively. Within onchocerciasis, four Latin American countries have now eliminated onchocerciasis since 2013 (Colombia, Ecuador, Mexico, and Guatemala). Across other NTDs, certain countries have eliminated trachoma and LF, for example, or are on the path to elimination. In its first full year of operations, ESPEN reported progress against its objectives; programs helped seven countries recover 132M leftover or lost PC drugs through supply chain analysis, fourteen countries develop NTD Master Plans for PC-NTD treatments, and eighteen countries increase country-level leadership and partner coordination (ESPEN, 2017b). However, it is estimated that another 600M people still need treatment against NTD, with 340M in sub- Saharan Africa, leaving more work to be done (WHO, 2017b). If this progress continues, there can be significant health and financial impacts at national and global levels. The World Bank’s Disease Control Priorities report highlights that achieving the 90% population MDA treatment target could reduce DALYs by 75% globally from 12M to 3M in 2030 ("Major infectious diseases," 2017). It also estimated that ending NTDs can be achieved for as low as three dollars per XXXX averted, driven by the low MDA cost. Further economic benefits are captured in Table 1A in the Appendix.
AutoNDA by SimpleDocs

Related to NTD Progress

  • Progress The Engineer shall, from time to time during the progress of the work, confer with the County. The Engineer shall prepare and present such information as may be pertinent and necessary, or as may be requested by the County, in order to evaluate features of the work. Upon request by the County, the Engineer shall make presentations to the Commissioners Court. At the request of the County or the Engineer, conferences shall be held at the Engineer’s office, the County’s office, or at other locations designated by the County. These conferences shall also include an evaluation of the Engineer’s services and work when requested by the County. Should the County determine that the progress in production of the work does not satisfy the work schedule, the County will review the work schedule with the Engineer to determine corrective action needed. The Engineer shall promptly advise the County in writing of events which have a significant impact upon the progress of work, including:

  • Annual Work Plan and Budget 1. The Recipient shall, not later than November 30th of each year, prepare and furnish to the Association an annual work plan and budget (“Annual Work Plan and Budget”) for the Project for the subsequent year, said Annual Work Plan and Budget of such scope and detail as the Association shall have reasonably requested.

  • Work Progress The Developer and Connecting Transmission Owner will keep each other, and NYISO, advised periodically as to the progress of their respective design, procurement and construction efforts. Any Party may, at any time, request a progress report from the Developer or Connecting Transmission Owner. If, at any time, the Developer determines that the completion of the Connecting Transmission Owner’s Attachment Facilities will not be required until after the specified In-Service Date, the Developer will provide written notice to the Connecting Transmission Owner and NYISO of such later date upon which the completion of the Connecting Transmission Owner’s Attachment Facilities will be required.

  • PROSECUTION AND PROGRESS Unless otherwise specified, the Contractor shall submit his/her progress schedule for the Owner's approval within 10 days after the effective date of the notice to proceed. The Contractor's progress schedule, when approved by the Owner, may be used to establish major construction operations and to check on the progress of the work. The Contractor shall provide sufficient materials, equipment, and labor to guarantee the completion of the project in accordance with the plans and specifications within the time set forth in the proposal. If the Contractor falls significantly behind the submitted schedule, the Contractor shall, upon the Owner's request, submit a revised schedule for completion of the work within the contract time and modify his/her operations to provide such additional materials, equipment, and labor necessary to meet the revised schedule. Should the prosecution of the work be discontinued for any reason, the Contractor shall notify the Owner at least 24 hours in advance of resuming operations. The Contractor shall not commence any actual construction prior to the date on which the notice to proceed is issued by the Owner.

  • Curriculum Work Service on a District curriculum committee shall be required for grade level or department chairpersons. All other teachers working on such committee(s) shall be designated (in writing) by the Curriculum Director and shall be paid, at the hourly rate contained in Schedule B, for all documented hours of committee service (up to such limits as may be imposed by the District) occurring when school is not in session (e.g. during the summer), during duty-free lunch periods or preparation periods, and before/after the teacher’s regularly scheduled work day. Curriculum committee work shall occur at such times as are determined or approved by the Curriculum Director.

  • ANNUAL MASTER CONTRACT SALES REPORT Contractor shall provide to Enterprise Services a detailed annual Master Contract sales report. Such report shall include, at a minimum: Product description, part number or other Product identifier, per unit quantities sold, and Master Contract price. This report must be provided in an electronic format that can be read by MS Excel.

  • Development Plans 4.3.1 For each Licensed Indication and corresponding Licensed Product in the Field, Licensee will prepare and deliver to Licensor a development plan and budget (each a “Development Plan”). The initial Development Plans for each Licensed Indication will be delivered within […***…] after the Grant Date for such Licensed Indication.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Construction Progress Meetings The Design Professional shall attend Construction Progress Meetings periodically held by the Contractor at the Site on a schedule determined by the Contractor. The Design Professional shall review the minutes of the meeting and provide his written comments to the minutes to the Owner and Contractor within seven calendar days after receipt of the meeting minutes.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!