OWNER’S OBLIGATIONS WITH RESPECT TO THE PROJECT Sample Clauses

OWNER’S OBLIGATIONS WITH RESPECT TO THE PROJECT. Generally. At no cost to CHGE, Owner shall: obtain Site Control by the date specified in the Critical Path Milestone schedule and maintain Site Control for the duration of the Term; design and construct the Project as required for Owner to perform its obligations under this Agreement; not modify the Project without obtaining prior written consent from CHGE; design, construct, own, operate and maintain the Project as required under this Agreement, in accordance with Good Utility Practice and in compliance with all Applicable Laws, Permits, and site agreements; except as expressly permitted under Section 14.4, retain exclusive ownership over the entirety of the Project; not make any use of the Project other than as directed by XXXX; timely file all applications or other appropriate requests for, and acquire and maintain, all Permits required for siting, construction, operation, and maintenance of the Project during the Term; complete all environmental impact assessments, statements, or studies required pursuant to Applicable Laws, including obtaining public review and certification of any final documents relating to any environmental impact assessment or studies; obtain and maintain in full force and effect all agreements necessary for electric service for Station Use and Charging Energy Requirements; obtain and maintain without modification, and shall take no action to invalidate, manufacturer’s warranties on the components of the Project, which minimum warranty requirements are identified in Exhibit E (“Warranty Requirements”); not withdraw the Interconnection Queue Position without CHGE’s prior written consent; ensure the Interconnection Facilities are sufficient to enable delivery of the installed capacity of the Project up to the Contract Capacity; provide to CHGE, prior to commencement of any construction activities on the Site, a report from an Independent and Actively Licensed NYS Registered Professional Engineer certifying that Owner has a written plan for the safe construction and operation of the Project in accordance with Good Utility Practice; comply with any NERC Reliability Standards applicable to the Project, including registration with NERC as the Generator Operator for the Project or other applicable category under the NERC Reliability Standards and implementation of all applicable processes and procedures required by FERC (Federal Energy Regulatory Commission), NERC, NPCC, NYSRC (New York State Reliability Council), the NYISO or other Gove...
AutoNDA by SimpleDocs
OWNER’S OBLIGATIONS WITH RESPECT TO THE PROJECT. 4.01 Generally. At no cost to RG&E, Owner shall:
OWNER’S OBLIGATIONS WITH RESPECT TO THE PROJECT 

Related to OWNER’S OBLIGATIONS WITH RESPECT TO THE PROJECT

  • GENERAL COMPLIANCE WITH RESPECT TO THE APARTMENT Subject to Clause 12 above, the Allottee shall, after taking possession, be solely responsible to maintain the [Apartment/Plot] at his/her own cost, in good repair and condition and shall not do or suffer to be done anything in or to the Building, or the [Apartment/Plot], or the staircases, lifts, common passages, corridors, circulation areas, atrium or the compound which may be in violation of any laws or rules of any authority or change or alter or make additions to the [Apartment/Plot] and keep the [Apartment/Plot], its walls and partitions, sewers, drains, pipe and appurtenances thereto or belonging thereto, in good and tenantable repair and maintain the same in a fit and proper condition and ensure that the support, shelter etc. of the Building is not in any way damaged or jeopardized. The Allottee further undertakes, assures and guarantees that he/she would not put any sign-board / name-plate, neon light, publicity material or advertisement material etc. on the face / facade of the Building or anywhere on the exterior of the Project, buildings therein or Common Areas. The Allottees shall also not change the colour scheme of the outer walls or painting of the exterior side of the windows or carry out any change in the exterior elevation or design. Further the Allottee shall not store any hazardous or combustible goods in the [Apartment/Plot] or place any heavy material in the common passages or staircase of the Building. The Allottee shall also not remove any wall, including the outer and load bearing wall of the [Apartment/Plot]. The Allottee shall plan and distribute its electrical load in conformity with the electrical systems installed by the Promoter and thereafter the association of allottees and/or maintenance agency appointed by association of allottees. The Allottee shall be responsible for any loss or damages arising out of breach of any of the aforesaid conditions.

  • Customer’s Obligations The Customer shall:

Time is Money Join Law Insider Premium to draft better contracts faster.