Penetrating Sealers Sample Clauses

Penetrating Sealers. Furnish a penetrating sealer from a manufacturer listed in Bulletin 15 meeting the following requirements: Property Test Method Requirements Freeze/ Thaw Resistance ASTM C 666, Procedure A, modified as follows: Use Class AA cement concrete for the test specimens. Test 4 specimens; 2 with sealer, 2 without sealer. Apply penetrating sealer to all sides of specimens as per manufacturer's recommendations. Repeat using Class AA cement concrete without air entrainment. No visible cracking, powderin Chloride Ion Penetration Chloride Ion Penetration AASHTO T 259, Section 3.6, modified as follows: Use Class AA Cement concrete with water/cement ratio of 0.55 for the test specimens. Apply penetrating sealer to top surface of specimens as per manufacturer's recommendations. Sandblast treated surface, removing approximately 2 mm (1/16 inch) before ponding with NaCl. Maximum Chloride Content 1.6 mm (0.0625 inch) to 13 m >13 mm (0.5 inch) to 25 mm Skid Resistance ASTM E 274 and ASTM E 524 (Smooth Tire) Acceptable to MTD. Concrete Discoloration Visual Provide a penetrating sealer
AutoNDA by SimpleDocs

Related to Penetrating Sealers

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Smoke Detectors At Owner's expense, smoke detectors will be installed on the Property in working condition in accordance with the law prior to the tenant's occupancy. During the occupancy, it shall be the tenant's responsibility to maintain all smoke detectors. Owner will replace smoke detector equipment as needed.

  • Rotating Shifts Nurses required to work rotating shifts (days, evenings and nights) shall be scheduled in such a way as to equitably as possible assign the rotation. This does not preclude a Nurse from being continuously assigned to an evening or night shift if the Nurse and the Employer mutually agree to such an arrangement.

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Screens 3.2.1.1 The proposed Generating Facility's Point of Interconnection must be on a portion of the Utility's Distribution System.

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • FABRICATION Making up data or results and recording or reporting them.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp. The origin of the angles of geometric visibility is the perimeter of the projection of the illuminating surface on a transverse plane tangent to the foremost part of the lens of the headlamp.

Time is Money Join Law Insider Premium to draft better contracts faster.