Pre-Construction Conditions Sample Clauses

Pre-Construction Conditions. 1. The DEVELOPER and its engineer shall discuss the capacity needs of the Project with the Town early in the Project’s conceptual phases. Water and sewer capacity allocated to the Project will be noted in Appendix A and any changes in Project scope requiring more or less than the allocated amount will require an amendment to this Contract. For large Projects, the Town may require the DEVELOPER to conduct its own capacity analysis using a licensed North Carolina Professional Engineer utilizing information provided by the Town.
AutoNDA by SimpleDocs
Pre-Construction Conditions 

Related to Pre-Construction Conditions

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

Time is Money Join Law Insider Premium to draft better contracts faster.