PRELIMINARY CORRIDOR SURVEYS Sample Clauses

PRELIMINARY CORRIDOR SURVEYS. The Company may perform preliminary corridor surveys to develop engineering plans, check environmental conditions, perform soil borings, etc. If the Company elects to perform a corridor survey, it shall obtain a permit from the appropriate District(s) prior to doing any work. In the event that the Agency has an improvement project in the vicinity of the Company's location(s) and has done an environmental review of the area, the Agency will furnish the Company with the information upon request. Any information provided to the Company shall be considered "for informational purposes only." No representation is made as to the accuracy or adequacy of the information for the Company's purposes.
AutoNDA by SimpleDocs
PRELIMINARY CORRIDOR SURVEYS. Carrier may perform preliminary corridor surveys to develop engineering plans, check for environmental conditions, perform soil borings, etc. If Carrier elects to perform a corridor survey, it shall submit for approval form DT1812, “Application/Permit to Work on Highway Right-of-Way” from WisDOT prior to doing any work.
PRELIMINARY CORRIDOR SURVEYS. The Partners may perform preliminary corridor surveys to develop engineering plans, check for environmental conditions, perform soil borings, etc. If the Partners elect to perform a corridor survey, it shall submit for approval form DT1812, “Application/Permit to Work on Highway Right-of-Way” from WisDOT prior to doing any work.

Related to PRELIMINARY CORRIDOR SURVEYS

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Preliminary Matters The Chair of the Hearing Panel will ask each party if it has any objections to the constitution of the Hearing Panel. Responses will be noted and recorded. If an objection is raised, the party raising the objection will be asked to immediately outline the objection. The Hearing Panel will then determine the merits of the objection.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Preliminary Schedule A preliminary schedule of construction indicating the starting and completion dates of the various stages of the Work, including any information and following any form as may be specified in the Specifications. Once approved by District, this shall become the Construction Schedule. This schedule shall include and identify all tasks that are on the Project’s critical path with a specific determination of the start and completion of each critical path task as well as all Contract milestones and each milestone’s completion date(s) as may be required by the District.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Preliminary Examination 2.22.1 The Procuring entity will examine the tenders to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the tenders are generally in order.

  • Title Report If no Additional Mortgage Policy is required with respect to such Additional Mortgaged Property, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the date such Additional Mortgage is to be recorded and satisfactory in form and substance to Administrative Agent;

  • Site Plan It is Licensee’s responsibility before signing this Agreement to ensure that the Site Plan correctly shows the work that Licensee intends to perform, that the Site Plan correctly shows all improvements and equipment that Licensee intends be located on the Use Areas, that the Site Plan shows no work, improvements or equipment outside the Exclusive Areas and Shared Areas properly depicted and labeled on the Boundary Plan, and that all work, improvements and equipment is encompassed within the purposes enumerated in the Standard Terms for that particular Exclusive Area or Shared Area. Any work, improvements or equipment not conforming to all the foregoing is prohibited, even if it is clearly shown on the Site Plan or discussed in the Standard Terms. Any refinement or other change to the Site Plan after Licensor executes this Agreement is void unless Licensee obtains Licensee’s approval of the change pursuant to the plans approval processes set out in the Standard Terms and pursuant to all applicable regulatory requirements.