Preliminary Exploitation Routes Sample Clauses

Preliminary Exploitation Routes. The main foreground generated by the project may be subject to different types of exploitation. The main types will be academic and research centre exploitation due to the low TRL of technologies, still at conceptual design phase. However, it must be noted that the maturity of most of the models developed within HECARRUS allows for use in the industry as well, since several of the modelling tools have been validated over the last 10-15 years through peer-review exercises with specialists from the EU aviation industry, as well as against experimental data available in the public domain, and other commercially available tools. At this first stage of the project [M6], preliminary exploitation routes are identified by the consortium partners. The main exploitation can be ensured through research, consultancy, training and services in the conceptual design of a commuter aircraft. This is attributed to the fact that two of the participants are coming from the Academia and one participant is a spin-off company that has emerged from a University. The latter is an example of how successful ideas may be facilitated into companies offering products or results. The term ‘product’ may refer to any tangible or intangible output of the action, such as data, knowledge and information whatever their form or nature, whether or not they can be protected. The term ‘result’ as already mentioned, refers to reusable and exploitable entities as such, or elements (knowledge, technology, networks) with potential to contribute for further work, research or innovations. The basic routes for exploitation can be summarized into the following options the potential of which will be examined throughout the project’s duration [5, 6]: Direct exploitation • Use for further research • Developing and selling own products/services • Standardisation activities (new standards/on-going procedures) Indirect exploitation • Spin-off activities • Cooperation agreement/Joint Ventures • Selling IP rights/Selling the (IP based) business • Licensing IP rights (out-licensing) As part of the overall exploitation strategy of the project, relevant activities and deliverables have been foreseen to be performed throughout the project’s duration. These include workshops dedicated to the identification of the potential exploitation routes and which will ensure that the exploitation potential of the project remains at the highest levels for the consortium participants. Relevant activities also include the business...
AutoNDA by SimpleDocs

Related to Preliminary Exploitation Routes

  • Preliminary Examination 2.22.1 The Procuring entity will examine the tenders to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the tenders are generally in order.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Procurement of Goods and Services (a) If the HSP is subject to the procurement provisions of the BPSAA, the HSP will abide by all directives and guidelines issued by the Management Board of Cabinet that are applicable to the HSP pursuant to the BPSAA.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Use of local labour professional services and materials 10. (1) The Company shall, for the purposes of this Agreement —

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

Time is Money Join Law Insider Premium to draft better contracts faster.