Preparation for construction Sample Clauses

Preparation for construction. 1. The Parties commit to support, in cooperation with the project coordinator, the completion of all studies and other preparatory activities necessary for a timely start of the construction works. The preparatory activities shall include, in particular: a) the spatial planning of the route area; b) performing of necessary feasibility, environmental and other studies; c) the completion of all necessary documentation, including the preliminary and technical design, of all necessary infrastructure in order to construct the railway in the territories of the States represented by the Parties. 2. The Parties support establishment of a contracting framework and common tendering guidelines, based on best procurement, including joint procurement, practices according to law of the European Union and agreements concluded by the Parties. 3. The Parties support establishing common technical guidelines for design and construction of the railway in view of compliance with Technical Specifications for Interoperability.
AutoNDA by SimpleDocs
Preparation for construction. Unless otherwise agreed in the special contract terms, the contractor shall submit a construction commencement report to the supervisor within the time limit agreed in Section 7.1 (Construction Organization Design), and the project shall be implemented after the supervisor reports it to the employer for approval. The construction commencement report shall provide detailed information on the implementation of the construction roads, temporary facilities, materials, engineering equipment, construction equipment, construction personnel, etc. required for normal construction according to the construction schedule, as well as the progress schedule of the project. Unless otherwise agreed in the special contract terms, the parties to the contract shall complete the preparatory work for commencement of construction as agreed.
Preparation for construction. 1. Contractor shall, as soon as practicable following the Contract Award Date, take all steps reasonably necessary in accordance with Good Construction Practice to prepare for the commencement of construction of the Project, including but not limited to the following: a. Condition of the Project Site Contractor shall make all further tests, inspections and analyses of the condition of the Project Site in each case as necessary under Good Construction Practice to prepare for excavation, foundation preparation and construction hereunder in accordance with Applicable Law. b. Utilities Contractor shall make all arrangements necessary for temporary construction connections to Authority utility locations and to public utilities. Contractor shall sequence its Work in such a manner that there is no unauthorized interruption of utility service to Authority’s Property. c. Progress Schedules Contractor shall prepare and provide to Authority the progress schedules in accordance with this Contract.
Preparation for construction. The DBE shall, as soon as practicable following the Contract Date, take all steps reasonably necessary in accordance with Good Engineering and Construction Practice to prepare for the commencement of construction of the Facilities, including the following:
Preparation for construction. .1 The Construction Manager shall in preparation for construction perform all appropriate services described in Article 6 of the General Conditions, which pertains to Trade Contractors.

Related to Preparation for construction

  • Legal Construction If one or more of the provisions contained in this Agreement shall for any reason be held invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provisions and this Agreement shall be construed as if it did not contain the invalid, illegal, or unenforceable provision.

  • Commencement and Completion of Construction Subject to Unavoidable Delays, Developer shall cause construction of the Minimum Improvements to be undertaken and completed: (i) by no later than June 1, 2020; or (ii) by such other date as the parties shall mutually agree upon in writing. Time lost as a result of Unavoidable Delays shall be added to extend this date by a number of days equal to the number of days lost as a result of Unavoidable Delays. All work with respect to the Minimum Improvements shall be in conformity with the Construction Plans approved by the building official or any amendments thereto as may be approved by the building official. Developer agrees that it shall permit designated representatives of the City, upon reasonable notice (which does not have to be written), to enter upon the Development Property during the construction of the Minimum Improvements to inspect such construction and the progress thereof.

  • Neutral Construction Neither party hereto may rely on any drafts of this Agreement in any interpretation of the Agreement. Both parties to this Agreement have reviewed this Agreement and have participated in its drafting and, accordingly, neither party shall attempt to invoke the normal rule of construction to the effect that ambiguities are to be resolved against the drafting party in any interpretation of this Agreement.

  • Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the internal laws of the State of New York.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure: 1. Coordination and providing supervision to all Subcontractor and workers; 2. Posting of the prevailing wage scale; 3. Maintaining a copy of the Contractors safety program manual made available to all construction personnel; 4. Conducting weekly on-site safety meetings; 5. Completing the daily labor and construction progress log on a daily basis and submit copies to the County on a daily basis. Copies of the previous day’s reports must be submitted by 9:00AM of the following day. a. Daily labor log is to include a listing of Subcontractor(s) and a count of workers by trade providing services for the day. b. Construction progress log is to include a narrative of the Work provided by trade(s). Narrative agrees to include the various areas of the jobsite where Work was performed and any problems or conditions that were encountered. c. In the event the Contractor fails to provide a daily log and/or construction progress log, the County may impose damages against the Contractor in the amount of fifty dollars ($50.00) for each log and deduct from the Contractor’s payment request, for each day the Contractor does not provide the documentation. 6. County may suspend Contractor operations if no Contractor Superintendent is observed. All delays caused by the suspension will be the responsibility of the Contractor. No time extension or claims for cost(s) associated with the suspension will be granted by the County.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.