PREPARING EQUIPMENT Sample Clauses

PREPARING EQUIPMENT. Engineers on all cranes up to one cubic yard capacity and engineers operating all derricks and all 2* hoists listed in Class I of Article XV hereof, and engineers on cranes of 20 ton lifting capacity or under, shall start one-half (½) hour before the regular starting time including shift work to prepare the machine for its operation by oiling, greasing, maintenance and servicing the equipment and shall be paid for said one-half (½) hour at the applicable overtime rate. Combination Backhoe Front End Loader machine with backhoe bucket capacity of less than one (1) cubic yard shall not be subject to preparation time. Combination Backhoe Front End Loader machine with backhoe bucket capacity of one (1) cubic yard or more shall be subject to preparation time. All Hydraulic Cherry Picker type machines and/or Hydraulic Truck Mounted Cranes of under twelve (12) ton lifting capacity shall not be subject to preparation time. All Hydraulic Cherry Picker type machines and/or Hydraulic Truck Mounted Cranes of twelve ton lifting capacity to a gross vehicle weight up to ninety-one thousand (91,000) pounds shall be subject to preparation time. All Hydraulic Cherry Picker type machines and/or Hydraulic Truck Mounted Cranes of over ninety-one thousand (91,000) pounds gross vehicle weight shall require an Engineer and Oiler and/or Apprentice as the case may be. In the event a dispute arises over the applicability of preparation time, or Oiler (Apprentice) requirements, due to the introduction of new models of machines or due to the manufacturer’s or -rating or re-classification of any machine’s size, lifting capacity, bucket capacity, or weight, a committee comprised of an equal number of representatives of the Union and the Association signatory hereto shall meet to make an equitable decision of the machine in question. In the event a majority decision cannot be reached, the dispute shall be processed pursuant to the Grievance and Arbitration Article of this Agreement.
AutoNDA by SimpleDocs
PREPARING EQUIPMENT. Engineers on all cranes up to one (1) cubic yard capacity and engineers operating all derricks and2 all hoists listed in Class I of Article XV hereof, and engineers on cranes of twenty (20) ton lifting capacity or under, shall start one-half (1/2) hour before the regular starting time including shift work to prepare the machine for its operation by oiling, greasing, maintaining and servicing the equipment and shall be paid for said one-half (1/2) hour at the overtime rate. Combination Backhoe Front Endloader machine with backhoe bucket capacity of less than one (1) cubic yard shall not be subject to preparation time. Combination Backhoe Front Endloader machine with backhoe bucket capacity of one (1) cubic yard or more shall be subject to preparation time. All Hydraulic Cherry Picker and Telescopic Crawler Crane type machines under twelve
PREPARING EQUIPMENT. Engineers on all cranes up to one (1) cubic yard capacity and engineers operating all derricks and2 all hoists listed in Class I of Article XV hereof, and engineers on cranes of twenty (20)

Related to PREPARING EQUIPMENT

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • MEASURING EQUIPMENT 1. Seller will maintain and operate, at its own, expense and at the point of delivery of gas hereunder, a meter or meters and other necessary equipment by which the volume of gas delivered hereunder shall be measured. Such meters and equipment shall remain the property of the Seller.

  • Removal of Equipment and Materials Within 30 days after completion of the requirements of this contract, PURCHASER shall remove from the areas of operations, and other property owned or controlled by STATE, all equipment, materials, and other property PURCHASER has placed or caused to be placed thereon that is not to become the property of STATE. It is agreed that any such equipment, materials, and other property that are not removed within 30 days, shall become the property of STATE and may be used or otherwise disposed of by STATE without notice or obligation to PURCHASER or to any party to whom PURCHASER may transfer title. Nothing in this section shall be construed as relieving PURCHASER from an obligation to clean up and to burn, remove, or dispose of debris, waste materials, and such, in accordance with the provisions of this contract. PURCHASER shall indemnify STATE for expenses as a result of cleanup, removal or disposal of debris, waste materials, and such.

  • New Equipment Where new types of equipment and/or operations, for which rates of pay are not established by this Agreement, are put into use after the ratification date of this Agreement within operations covered by this Agreement, rates governing such operations shall be subject to negotiations between the parties. This paragraph shall apply to all new types of equipment including office and clerical equipment. In the event agreement cannot be reached within sixty (60) days after the date such equipment is put into use, the matter may be submit- xxx to the National Grievance Committee for final disposition. Rates agreed upon or awarded shall be effective as of the date equipment is put to use.

  • STANDARD EQUIPMENT All items of standard equipment which are provided by the OEM shall be furnished unless such items are expressly deleted by the Authorized User or are specified to be other than standard in the Mini-Bid. When Optional equipment is specified, all components listed in the OEM’s data book as being included with the Option shall be furnished.

  • Additional Equipment Additional Equipment may from time to time be added as the subject matter of this Agreement as agreed on by the parties. Any additional property will be added in an amendment describing the property, the monthly rental, security deposit, and stipulated loss value of the additional Equipment. All amendments must be in writing and signed by both parties. Other than by this amendment procedure, this Agreement may not be amended, modified, or altered in any manner except in writing signed by both parties.

  • Stored equipment We accept no responsibility for any stored equipment or other property brought on to or left at the premises, and all liability for loss or damage is hereby excluded. All equipment and other property (other than stored equipment) must be removed at the end of each hiring or we will charge fees each day or part of a day at the hire fee per hiring until the same is removed. We may, in our discretion, dispose of any items referred to below by sale or otherwise on such terms and conditions as we think fit, and charge you any costs we incur in storing and selling or otherwise disposing of the same, in any of the following circumstances:

  • Required Equipment (a) Towing sling – J/T hook tow chain assembly, a 4”x4”x48” and a 4”x4”x60” wooden crossbeam, a pair of spacer blocks, a steering wheel clamp, a towing dolly and safety chains.

Time is Money Join Law Insider Premium to draft better contracts faster.