PREPRODUCTION BUILD Sample Clauses

PREPRODUCTION BUILD. There is no pre-production build. All units are production units built at rev A. The first 25 units will be billed at actual labor and material cost. Remaining units will be billed as per unit cost quoted on January 12, 2000 quotation (see appendix D). A long lead (greater than 8 weeks lead time) BOM will be generated and master scheduled to support the Production schedule. Upon receipt of a purchase order from Xxxx the master schedule for the long lead BOM will be removed and a sales order will be loaded to drive the demand for the remaining material. All custom part drawings will be released to Revision A for the purchasing team to buy. Assembly drawings will be released to Revision A prior to work orders being opened. While the overall responsibility still resides with the Material Coordinator, the Planner will have the responsibility for the day to day operations (opening work orders, monitoring shortages, expediting, etc.), and data entry of the BOM and BOM changes as provided by the Manufacturing Engineer. The Material Coordinator will work with the Material Team to implement design changes. The Production Planner will monitor the shortage report and expedite material from receiving through to the work cell. MRB meetings will be held as needed to move material through MRB to the work cell. The Planner will provide shortage reports to the Material Coordinator.
AutoNDA by SimpleDocs

Related to PREPRODUCTION BUILD

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Production Work Except as agreed to in writing by the Parties pursuant to the "Production Work" section of the Standard Online Commerce Terms & Conditions attached hereto as Exhibit F, MP will be responsible for all production work associated with the Affiliated MP Site, including all related costs and expenses.

  • Project The Land and all improvements thereon, including the Building, the Parking Facilities, and all Common Areas.

  • ASBESTOS CONTAINING BUILDING MATERIALS Please be advised that an asbestos survey may have been performed at the Property. If provided, please review the information that identifies the locations of known asbestos containing material or presumed asbestos containing material. All personnel and appropriate subcontractors should be notified of the presence of these materials, and informed not to disturb these materials. Any activity that involves the disturbance or removal of these materials must be done by an appropriately trained individual/contractor.

  • Site Visits DOE’s authorized representatives have the right to make site visits at reasonable times to review project accomplishments and management control systems and to provide technical assistance, if required. You must provide, and must require your subawardees to provide, reasonable access to facilities, office space, resources, and assistance for the safety and convenience of the government representatives in the performance of their duties. All site visits and evaluations must be performed in a manner that does not unduly interfere with or delay the work.

  • Site The Generating Facility is located on approximately 10 acres with an address of 0000 Xxxxx Xxxxxx Xxxxxx in Xxxxxx Tree, San Bernardino County in California. The centroid of the solar array is 34.1383°N, -116.2262°W. The site is dedicated to the Generating Facility use only.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.