Programming and Space Analysis. Conduct interviews and workshops, and collect other information as necessary to document the current and anticipated program needs and space requirements. Describe all desired spaces by function, size, environmental requirements, required relationships and adjacencies and special requirements for equipment, floor loading, special systems, sound isolation, access control, and the use of chemical, biological or radiological materials. Identify requirements for flexibility and expandability. Project total net and gross square footage required to meet the program and space requirements. Project estimated operating costs, if of significant magnitude. Prepare and submit a summary, including appropriate Instruments of Service, of Architect’s conclusions and recommendations as to the program needs and space requirements. Provide updates to such Instruments of Service as the Services progress.
AutoNDA by SimpleDocs
Programming and Space Analysis. Conduct interviews and workshops, and collect other information as necessary to document the current and anticipated program needs and space requirements. Describe all desired spaces by function, size, environmental requirements, required relationships and adjacencies and special requirements for equipment, floor loading, special systems, sound isolation and access control. Identify requirements for flexibility and expandability. Project total net and gross square footage required for meeting the program and space requirements. Prepare and submit a summary, including appropriate Instruments of

Related to Programming and Space Analysis

  • Evaluation Software If the Software is an evaluation version or is provided to You for evaluation purposes, then, unless otherwise approved in writing by an authorized representative of Licensor, Your license to use the Software is limited solely for internal evaluation purposes in non-production use and in accordance with the terms of the evaluation offering under which You received the Software, and expires 90 days from installation (or such other period as may be indicated within the Software). Upon expiration of the evaluation period, You must discontinue use of the Software, return to an original state any actions performed by the Software, and delete the Software entirely from Your system and You may not download the Software again unless approved in writing by an authorized representative of Licensor. The Software may contain an automatic disabling mechanism that prevents its use after a certain period of time. RESTRICTIONS

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.